Home / Suncorp Group / Determination 12-25-211427

Determination 12-25-211427

Partial denial of storm damage claim (structural damage, restumping), policy cancellation and poor claims handling

FirmSuncorp Group
Decided2026-08-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's storm damage claim was partly denied and his policy cancelled for unpaid premiums. AFCA upheld the denial of structural damage and the cancellation, but required the insurer to settle subfloor insulation damage, arrange mould assessment, reimburse the expert report with interest and pay $1,000 non-financial loss.

Long-term ground movement, not the storm, was the proximate cause of structural damage, while the storm directly damaged insulation; the cancellation complied with the Insurance Contracts Act, and poor claims handling warranted $1,000.

Issues

Subjects and remedies

financial hardshiphome or building damagenatural disasterthird party authoritypay claimpay compensationpay interestpay non financial lossrefund fees or chargesrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-211427 | Financial firm | AAI Limited Case number: 12-25-211427 7 July 2026 1 Determination overview 1.1 Complaint The complainant held a home and contents policy with the financial firm (the insurer). He lodged a claim for property damage (including settlement) he says was caused by a storm in December 2024. He also says the insurer was not entitled to cancel his policy and mishandled his claim, causing him significant stress and distress. The insurer partly denied the claim. It says it is not required to cover restumping the property because the settlement was not proximately caused by the storm and was, instead, pre-existing. 1.2 Issues and key findings Is the insurer entitled to partly deny the claim? In part. The insurer is entitled to deny the structural damage and resulting internal damage. However, the insurer is required to accept the damage to the subfloor insulation and assess for mould. Is the insurer entitled to cancel the policy? Yes. Based on the exchanged information it is likely: · the complainant failed to make two required payments · the insurer provided the required notices to the complainant and cancelled the policy in line with the policy and the Insurance Contracts Act 1984 (the Act). Is the insurer required to pay compensation? Yes. The insurer’s offer to pay $1,000 for non-financial loss, as well as waiving the $1,000 excess, is fair compensation for the stress and distress its poor claims handling caused the complainant. Why is the outcome fair? This outcome is fair because it reflects the application of the policy terms both parties agreed to, to what is most likely to have occurred, based on the exchanged information. The insurer can deny the structural and related internal damage because the information does not show the storm was the dominant cause of that damage. But the insurer must deal with the subfloor insulation and possible mould in line with the policy and compensate the complainant for the stress caused by its poor communication. 1.3 Determination This determination is substantially in favour of the insurer. If the complainant accepts this determination, the insurer must, within 14 days of being notified of acceptance: · accept and settle the damage to the subfloor insulation in accordance with the policy terms and conditions · arrange for a licensed hygienist to assess the subfloor for mould, remediate any mould identified and issue a clearance certificate when appropriate · after receiving proof of payment, reimburse the complainant’s representative for the cost of CB’s report, plus interest in line with section 57 of the Act from the date the report was paid until the date of reimbursement · pay the complainant $1,000 compensation for non-financial loss · waive the $1,000 excess if it has not already done so. 2 Reasons for determination The complainant has had several representatives during this complaint. This determination calls the complainant and his representatives ‘the complainant’ for ease of reference. 2.1 Is the insurer entitled to partly deny the claim? In part. The insurer is entitled to deny the structural damage and resulting internal damage. However, the insurer is required to accept the damage to the subfloor insulation and assess for mould. Complainant is required to show a valid claim The complainant must show, on the balance of probabilities (that it is more likely than not), that he suffered a loss claimable under the policy. This means he must show the loss was caused by a risk for which he is insured. Once the complainant establishes a valid claim, the onus then shifts to the insurer to demonstrate the loss is not covered, either by way of one of the policy exclusions or on some other basis. ​The policy covers loss or damage to the home or contents caused by an insured event, subject to the policy terms. The relevant insured event in this case is storm. The policy also excludes earth movement that does not occur within 72 hours of a relevant insured event. ​There is no dispute that catastrophe 233 storms and flooding affected the area on 25 December 2024. The dispute is whether that event caused the claimed property damage. ​The insurer accepted the claim for the shed contents and kitchenette cabinetry. It disputes the remaining property damage because it says long term water ingress and historical ground movement caused that damage. The key factual issues in dispute are: · when damage to the property occurred · what caused the structural damage. The parties mainly rely on reports from: · the insurer’s engineer (MC) · the complainant’s building consultant (CB) · the original disaster recovery team (JL) which includes a section from a structural engineer (IS). The panel finds all the expert’s reports generally credible and, overall, well-reasoned. Some damage likely occurred before the property was restumped but other damage is likely more recent The complainant purchased the property in March 2023 and this is when the period of insurance began. The parties agree the property has been restumped (CB says in 2018). The panel accepts some floor undulation and misalignment occurred before this time. This is supported by: · CB’s acknowledgement that some damage was likely pre-existing · MC’s photographs showing the kitchen joinery kicker has been tapered to suit the misalignment of the floor (varying in height between 115 mm and 125 mm to the edge of the island bench) · CB’s acknowledgement the kitchen was renovated in 1993. The panel also accepts some damage is likely more recent. This is because CB’s report includes photographs not included in earlier reports including one that shows an 18 mm gap between a stump and bearer below the dining area. This indicates that some damage likely occurred before the property was restumped but other damage occurred more recently. Insufficient information to establish when damage occurred relative to the insured event The exchanged information is not sufficient for the panel to clearly separate damage that pre-dated the insured event from damage that occurred during or after it. Some parts of MC’s and CB’s opinions lack certainty, and the other supporting information is not compelling. The complainant has included a detailed table that assigns levels of probability to a detailed list of damaged items. However, these findings are not well supported because: · CB gives limited reasoning for rating each item as pre-existing, exacerbated or caused by flood · no written pre-inspection report confirms the property’s condition before the event · the 2026 letter from the insulation installer (that says the subfloor was in good condition when he installed subfloor insulation in June 2023) carries limited weight because the installer was not engaged as a qualified subfloor expert. MC’s opinion that other damage (such as cracking, misaligned doors, extensive movement and structural damage) pre-dated the event is also not strongly supported because: · MC’s report does not include photographs of all damage identified as pre-existing · the report’s photographs are not clearly captioned and do not always identify where the photographs were taken or what they show · CB’s report includes photographs of damage that were not described or evident from earlier reports, including the gap between the stump and bearer. Given there is insufficient information to establish which, and how much, damage occurred before, during, or after the insured event, the panel considers it reasonable to accept there was both pre-existing damage and event related damage. The next issue is what caused the damage that occurred during or after the event. The parties’ experts dispute the proximate cause of the damage to the property MC says long term moisture variation in clay soils and poor site drainage caused the property movement. MC says the movement likely developed slowly and was unlikely to have been caused by a one-off event. CB accepts that pre-existing factors may have contributed to the damage. However, CB says the storm materially changed the moisture conditions under the home and triggered further foundation movement. CB says the event directly caused water related damage and worsened movement related defects, including internal cracking, uneven floors and misaligned doors or openings. The panel accepts the reasoning of both MC and CB is credible and that both may apply. That is, that: · as MC says, there were long term drainage issues and ongoing run-off that continued to cause long term variation in the clay soil resulting in ongoing settlement after the property was restumped, and · as CB says, prolonged saturation from the insured event, for approximately two weeks, likely accelerated some settlement. IS says there are structural defects resulting from the event. IS also says the bouncy floor, cracking and bedroom door jamming are likely due to soil settlement at the foundations, and that this may have been pre-existing and worsened by settlement due to the event. The panel gives weight to IS’s report because IS was not commissioned by either party. However, JL’s report contains an important inconsistency. Its summary says there are no major structural issues caused by the event, while IS’s section says the event did cause structural defects. Proximate cause of damage occurring during or after the event must be established Where there are several causes of damage, each one must be assessed for whether it is proximate cause. That is, whether it is the effective, dominant or operative cause of the damage. For example, if one cause would have produced the loss on its own, while the other could only have led to the loss because the first occurred, then the first cause is the proximate cause. Long term ground movement was likely the proximate cause The panel accepts MC’s opinion that long term ground movement was the likely proximate cause of the structural damage. We accept as credible, MC’s reasoning that: · clay soils have very low permeability, so surface water would usually need to remain for several years before it could migrate down to the founding depth of the concrete stumps and affect soil bearing capacity · one inundation event was likely not enough to materially change the founding soils · instead, poor site drainage allowed moisture into the subfloor over time, causing variable subsoil moisture conditions and movement. The panel accepts this reasoning because it is detailed, logical and consistent with some of CB’s findings. For instance, CB acknowledges that: · reactive clay soils made the site susceptible to movement · upgraded drainage is appropriate to reduce future risk (which indicates the existing drainage was inadequate) · the 2018 restumping works likely disturbed the founding soils and increased the subfloor system’s susceptibility to movement during prolonged saturation. The panel acknowledges CB’s view that sustained inundation beneath a stump supported home on reactive clay soils is abnormal and can significantly reduce soil strength and bearing capacity. However, the exchanged information does not establish that this was the dominant cause of the structural damage. Indeed, CB’s view about the extent to which the event caused the damage is qualified. For instance, CB describes the event as having ‘exacerbated,’ ‘triggered’ or ‘accelerated’ foundation settlement and movement related defects. This wording does not support a finding that the event was the dominant cause of the structural damage. Insurer entitled to deny structural damage and resultant internal damage The panel accepts that the event likely worsened existing settlement. However, the evidence does not establish that the prolonged saturation would have caused the structural damage without the pre-existing long term moisture variation in clay soils and poor site drainage. Instead, the panel is satisfied those pre-existing conditions likely: · caused ongoing movement before and after the property was restumped and, before, during and after the 2024 event · were a necessary pre-condition for the extent of structural damage the event caused. The insurer is therefore entitled to deny the structural damage and the resulting internal damage, including cracking, jamming doors and related movement damage. Insurer required to accept insulation and assess for mould The panel is satisfied the 2024 event directly caused damage to the subfloor insulation. This is because: · the insulation batts had only recently been installed and were likely in good condition before the event · CB gives a well-reasoned view that prolonged saturation likely caused water damage to insulation batts · JL’s findings are consistent with CB’s opinion · MC did not adequately consider the event’s effect on the insulation. The panel also considers it is reasonable that the insurer assesses the subfloor for mould. This is because JL says, and the panel accepts, that: · while mould was not visible at the time of the site assessment, it is highly likely there will be mould present in the subfloor and possibly in wall cavities because of the event · a mould remediation specialist should inspect the property and a licensed hygienist should issue a clearance certificate after any required remediation. CB’s findings about likely mould are consistent with JL’s view and, again, it is not an issue MC considered. Within 14 days of notification of the complainant’s acceptance of this determination, the insurer is required to: · accept and settle the damage to the subfloor insulation in accordance with the terms and conditions of the policy · arrange a licensed hygienist to assess the subfloor for mould, remediate any mould identified and issue a clearance certificate when appropriate. Insurer required to reimburse costs for CB’s report Under Rule D.5, AFCA may require a financial firm to contribute to professional costs a complainant incurred during a complaint. AFCA may award these costs where the complainant reasonably needed expert evidence to understand or establish the claim. The panel is satisfied CB’s report helped the complainant understand a complex claim. The insurer must therefore reimburse the complainant’s representative for the cost of CB’s report after receiving proof of payment. The insurer must also pay interest under section 57 of the Act, from the date the report was paid for until the date of reimbursement. 2.2 Is the insurer entitled to cancel the policy? Yes. Based on the exchanged information it is likely: · the complainant failed to make two required payments · the insurer provided the required notices to the complainant and cancelled the policy in line with the policy and the Act. Insurer correctly attempted to deduct monthly premium instalments The policy was renewed in January 2025 and premiums were to be charged monthly by direct debit from the complainant’s bank account. The insurer says it attempted to deduct a monthly premium instalment on 14 March 2025, but this was unsuccessful. It says it attempted to deduct the instalment again on 31 March 2025, but this was also unsuccessful. The panel acknowledges the complainant says there were sufficient funds in his account in March and that the insurer knew this. But there is insufficient information to establish this. Having reviewed the exchanged information, the panel is satisfied the insurer likely correctly attempted to deduct the premium instalments and that these attempts were not successful. The Act sets out when an insurer is entitled to cancel the policy The Act sets out how an insurer may cancel a policy: · section 60(1)(d) allows an insurer to cancel a policy when the insured has failed to comply with a provision of the contract, including in relation to the payment of the premium · section 59 requires an insurer to give advance notice in writing of its intention to cancel a policy and says the cancellation will take effect three business days after the notice is given or at the time specified in the notice or contract, whichever is later. The panel is satisfied the insurer has established the right to cancel the policy. This is because: · the policy requires the complainant to pay the premium · the complainant did not pay the premium. Complainant consented to receive notices electronically (by email) Section 72A of the Act says a notice may be given to a natural person personally or ‘by post to that person at the person’s last known address’. The Electronic Transactions Act 1999 (Cth) allows insurers to send notices by email if the person has consented to receive them electronically. The insurer says, and the complainant does not dispute, that the complainant nominated email as his preferred method of communication. Insurer sent the required cancellation notices The insurer has provided a copy of the cancellation notice. The panel is satisfied the notice clearly sets out the insurer is cancelling the policy because the premium payment has not been received. The insurer has also provided information to support it sent the cancellation notice (and other notices). The panel has reviewed this information, and is satisfied it shows, on balance: · payment dishonour notices were emailed to the complainant on 14 March and 31 March 2025 · a cancellation notice was emailed to the complainant on 16 April 2025 · the notices were delivered successfully · the notices were sent to the email address provided by the complainant. In these circumstances, the panel is satisfied: · the cancellation notice was sent as required under section 72A and section 59 of the Act · the insurer complied with the policy terms relating to giving notice of cancellation. Insurer correctly cancelled the policy Having considered the available information, the panel is satisfied the cancellation notice emailed to the complainant clearly set out the policy would be cancelled and when. The panel is satisfied the insurer correctly exercised its right to cancel the policy under the Act. 2.3 Is the insurer required to pay compensation? Yes. The insurer’s offer to pay $1,000 for non-financial loss, as well as waiving the $1,000 excess, is fair compensation for the stress and distress its poor claims handling caused the complainant. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. AFCA does not award compensation for the normal degree of inconvenience that comes with a claim or when a problem occurs. Insurer’s poor claims handling caused the complainant significant stress The complainant says: · the insurer delayed key claim steps, including the shed contents assessment and claim progression during the AFCA complaint · the insurer’s communication was poor, with the complainant having to routinely contact the insurer for updates and to move the claim forward, repeatedly reject the partial acceptance offer and correct errors the insurer had made in its settlement offer. · the insurer did not adequately consider the complainant’s vulnerability (for instance by failing to consistently involve his support workers, despite authorities being provided) · these issues prolonged the claim, increased the complainant’s stress and frustration, and required him to repeatedly advocate for himself despite his vulnerabilities. The insurer has acknowledged shortfalls in its claims handling and offered to pay $1,000 compensation for non-financial loss as well as waiving the $1,000 excess. The panel accepts the insurer’s delays and poor communication caused the complainant distress and inconvenience. Applying AFCA’s usual approach, the panel is satisfied the insurer’s offer of $1,000 is fair and reasonable. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to pay the complainant $1,000 compensation for non-financial loss. 2.4 Why is the outcome fair? This outcome is fair because it reflects the application of the policy terms both parties agreed to, to what is most likely to have occurred, based on the exchanged information. The insurer can deny the structural and related internal damage because the information does not show the storm was the dominant cause of that damage. But the insurer must deal with the subfloor insulation and possible mould in line with the policy and compensate the complainant for the stress caused by its poor communication. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in consumer advocacy · a member with extensive experience in insurance. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.