Home / QBE / Determination 12-25-208092

Determination 12-25-208092

Partial denial of storm damage claim to shed relying on defective design and construction exclusion

FirmQBE
Decided2026-04-09
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted storm damage to a shed roof but denied the remaining damage as caused by design and construction defects. AFCA found the storm was the proximate cause, required the claim be accepted in full, and ordered reimbursement of expert report costs up to $5,000.

The insurer bore the onus of proving the defects exclusion applied, and the evidence showed it was more likely than not that wind speeds exceeded the design wind speed so the storm was the proximate cause.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disastersmall businesspay claimpay compensationpay interestrefund fees or chargesrepair or rectify

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-208092 | Financial firm | QBE Insurance (Australia) Limited Case number: 12-25-208092 9 April 2026 1 Determination overview 1.1 Complaint The complainant company held business pack insurance with the insurer (financial firm). It lodged a claim after its shed was damaged during a storm on 13 February 2024. The insurer accepted that the storm damaged the shed’s roof but denied coverage for the rest of the damage (disputed damage). It says the disputed damage was caused by defects in the shed’s design and construction, so is excluded from cover under the policy terms. The complainant maintains that all the damage to the shed was caused by high winds during the storm. It wants the insurer to accept the claim in full. 1.2 Issues and key findings Is the insurer entitled to partially deny the claim? No. Based on the exchanged information, the proximate cause of the disputed damage was the extreme wind speeds experienced during the storm. It is more likely than not those wind speeds exceeded the required wind resistance design specification. Is the insurer to reimburse professional costs? Yes. The expert reports the complainant obtained have assisted it to establish an entitlement to indemnity for the disputed damage. Why is the outcome fair? The outcome is fair because the complainant has established a loss claimable under the policy terms and the insurer has not shown the exclusion it relies on applies as the proximate cause of the disputed damage. 1.3 Determination This determination is in favour of the complainant. If the complainant accepts this determination, the insurer is required to accept the claim in full pursuant to the terms and conditions of the policy. If the insurer elects to attend to repairs, it must progress those repairs as a priority. If the insurer elects to pay the complainant a cash settlement, it must obtain an actionable quote based on current retail prices. It is to pay the complainant the quoted amount plus a 15% uplift for contingencies and loss of the lifetime guarantee that applies to insurer repairs. If the complainant has already attended to any claim related repairs, the insurer is to reimburse those costs and pay interest under section 57 of the Insurance Contracts Act, 1984 (Cth) (ICA) from the date the complainant paid the applicable invoice(s) until reimbursement. Within 14 days of receiving proof of payment from the complainant, the insurer is to reimburse the cost of its expert reports (subject to a maximum cap of $5,000 in total). 2 Reasons for determination The complainant is represented by insurance broker AB. For brevity’s sake, the complainant and AB are referred to below as ‘the complainant’ unless context requires otherwise. 2.1 Is the insurer entitled to partially deny the claim? No. Based on the exchanged information, the proximate cause of the disputed damage was the extreme wind speeds experienced during the storm. It is more likely than not those wind speeds exceeded the required wind resistance specification. ​​​Complainant has shown a claimable loss under the policy terms ​​​​​​​The complainant is required to show, on the balance of probabilities (that it is more likely than not), that it suffered a loss claimable under the policy. This means it must show the loss was caused by a risk for which it is insured. ​​​​​​​Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainant for accidental loss or damage to its property. ​​​​​​On 15 February 2024, the complainant notified the insurer that at about 4pm on 13 February 2024, a large shed on the insured property (property) was damaged during a major storm with high winds. ​There is no dispute that the storm occurred or that the shed was damaged. The insurer agreed to cover the damage to the shed’s roof on the basis it was storm related. I am therefore satisfied the complainant has established a claimable loss. ​​​​​​​Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer says disputed damage is excluded The insurer says it is entitled to deny cover for the disputed damage, relying on the following exclusion set out on page 20 of the PDS: 5. We will not pay for damage caused directly by or arising directly from: … (d) latent defect, inherent defects, faulty workmanship, faulty material, structural defects or faulty design; ​​​​​Proximate cause of loss must be determined ​​In a general insurance claim, the term ‘proximate cause’ is used to describe whether an event is the main cause of the loss or damage. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the only cause. It is a question of fact that depends on the circumstances of each case. ​​If there are several causes, each should be examined to determine whether it is a dominant, effective or operative cause of the loss. For example, if one cause would have caused the loss on its own, and the other cause would not have caused the loss without the first, then the first is the proximate cause. Parties disagree on proximate cause of disputed damage The complainant maintains that the proximate cause of the disputed damage was the storm as the wind speed experienced exceeded the required wind resistance specification applicable to the shed. The insurer disputes that and says the proximate cause of damage was design and structural defects. On 15 March 2024, engineer SE undertook a site inspection and reported to the insurer that: · the shed comprised of three shed structures that had been joined together · shed 1 was built in 1999 pursuant to approved plans and permits. Sheds 2 and 3 were added in about 2009 without approved plans and permits. The complainant said the local council had confirmed permits were not required · there was external damage to sheds 1, 2 and 3, and internal damage to shed 1 · Bureau of Meteorology (BOM) data collected from P weather station about 22km south of the property indicated the maximum wind speed on 13 February 2024 was 72km/h (20m/s) · Australian Standard AS1170.2 was in effect prior to the sheds being built, and required structures to be capable of withstanding a wind speed of 262km/h (45m/s) · temporary framing deflection with associated minor damage would not occur until a wind speed of 133.2km/h (37m/s) was reached · noting the maximum wind speed recorded at P, the wind on 13 February 2024 would not be expected to damage an adequately designed, constructed and maintained structure · the damage to shed 1’s polycarbonate roof sheeting occurred during the storm · the proximate cause of the leaning of shed 1’s wall columns was inadequate wall bracing · the inadequate wall bracing also contributed to the damage to shed 1’s roller door · shed 3’s roof purlins were not straight but that was unrelated to the storm · the design and construction of shed 1 had significantly departed from the approved plans and permits, including because of the integration of shed 2 with shed 1’s roof structure. In a further report dated 31 July 2024, SE maintained that an adequately designed, constructed and maintained structure should have withstood the wind during the storm. SE provided additional BOM data collected on 13 February 2024 at weather station: · N, about 36km north of the property, showing a maximum wind speed of 85km/h (23.6m/s) · L, about 55km northeast, showing a maximum wind speed of 80km/h (22.2m/s) · R, about 54km west, showing a maximum wind speed of 72km/h (20m/s). The insurer arranged for a second engineer, SW, to inspect the property. SW did so on 13 September 2024, and reported that: · following the storm, the shed had external wall cladding deformation, minor deformation of roof sheeting at multiple locations as well as four damaged skylights, deformed steel roof purlins, and internal steel framing movement · noting the requirements of AS1170.2, the experienced wind speed recorded by the BOM at weather stations P and N should not have been able to cause the observed damage · therefore, the damage was not attributable to the storm event · the shed was not structurally adequate or stable for long-term performance given the design and engineering principles required for a portal frame structure · the shed extension had not been adequately constructed in accordance with applicable standards at the time of construction and did not comply with current standards. In a report dated 10 April 2025, SW said it had relied on data from the BOM weather stations closest to the property. SW acknowledged wind gusts at the property may have varied, but said it was highly unlikely they exceeded 162km/h. It said gusts of that magnitude would have caused catastrophic damage in the area, which was not apparent. SW claimed media reports indicated the highest wind speed across all weather stations in the storm’s path was 126km/h. The complainant has provided the following to demonstrate the ferocity of the storm: · a brief video said to be of the storm which depicts very heavy rain and high winds · media report dated 21 February 2024 which said the storm that had hit the local area was ‘tornado-like…with winds up to 200km/h…’ · photos of storm damage in the local area, including of an overturned building, trees down, and damage to a hangar at an aerodrome 7km away · repair estimate dated 12 June 2024 by builder BB for damage to the home on the property. The damage included movement of a brick wall, and warped roofing. BB attributed the damage to the storm, and noted there had been severe winds as shown by the damage to the garden and trees surrounding the home · press release dated 9 July 2025 by energy regulator E which said ‘On 13 February 2024, Victoria experienced an extreme storm event with peak wind gusts reaching…175km/h’ · email exchange with the BOM in September 2025, in which the BOM: > confirmed that the nearest weather station to the property was P > acknowledged the 23km between P (at sea level on the coast) and the property (inland, 100m above sea level) could mean the weather at each location would vary > the difference in elevation from sea level and topography were relevant factors · email dated 14 September 2025 from neighbour Y stating the storm was the most violent she had ever experienced and that the wind was unbelievably strong. The wind destroyed her hayshed and cattle yards and ripped trees out of the ground. Attached to the email were images of the damage, including one date stamped 4.29pm on 13 February 2024 · state and local government public releases which described the storm event as catastrophic, and had resulted in extensive damage, including to the local area. The complainant has also provided a report dated 12 September 2025 by engineer DC. After inspecting the shed and reviewing the initial reports of SW and SE, DC said: · considering that the shed was for storage only and using a software program, it had the correct design site wind speed was 136.3km/h (37.86m/s), not 162km/h (45m/s) · a nearby weather station had recorded a wind speed of 100km/h at 3.53pm on 13 February 2024, then stopped recording. The storm hit the property a few minutes later and it is likely local wind speeds would have been more than 100km/h · damage to trees on and adjacent to the site confirmed very high winds occurred · E’s investigation into the collapse of transmission towers on 13 February 2024 recorded peak gusts up to 175km/h. That could have been referring to the local area · the extent of local damage showed extreme difference in local wind speeds can occur compared to the measurements taken at weather stations P and N · ‘The winds experienced both on the site and in the region generally were obviously well above a typical storm, and are considered a rare event. It seems entirely possible that the [shed] experienced wind speeds greater than its design wind speed’. In addition, the complainant has submitted a report by arborist T. After inspecting the property on 12 September 2025, T said the storm had been: Devastating to the vegetation, the destruction was unseen in the area and trees were simply twisted/snapped or uprooted. The force of the wind for this to occur would have been extreme and likely never seen before in the life span of these affected trees. The diameter of the wood that simply snapped ranged between 200mm to 300+mm. The complainant has provided extracts from F scale, an American tornado damage scale. F scale says the snapping of hardwood trees indicates windspeeds of 93mph to 134mph (149.7km/h to 215.7km/h). the complainant says the affected trees on the property were hardwood. He has provided photos of some of those trees. The complainant also relies on a final report dated 3 December 2025 by weather and climate expert SB. E had requested the report as part of its investigation into the transmission towers’ collapse on 13 February 2024. SB’s comments included that: · scientific data confirmed there was an extremely unstable atmospheric situation that day, especially in the vicinity of the complainant’s location. That indicated that extremely severe thunderstorms, with possible tornadoes, had been likely in the region · a major line of severe thunderstorms moved over the complainant’s location · radar and satellite images showed the type of storm cell that would have passed over the complainant’s location at about 4pm is known to produce extreme bursts of strong winds, including brief tornadoes · the data recorded at weather station P ‘would not represent the conditions associated within or ahead of an approaching storm of this severity over [the complainant’s location]’ · based on the available scientific data, it calculated the potential for wind gusts to have reached 176km/h (48.9m/s) at the complainant’s location · an alternative calculation approach suggested a maximum potential range of 142.6km/h (39.6m/s) to 166.7km/h (46.3m/s). In response to the information the complainant has provided, the insurer relies on several further reports of SW. In summary, SW said: · based on DC’s site-specific calculations, it accepted that 147.6km/h (41m/s) was a reasonable and appropriate value for the design site wind speed · there was no reliable evidence to show wind speeds had approached that value · T’s report lacked detail and was prepared too long after the storm to be reliable · the complainant’s reasoning in arriving at the claimed wind gust estimates, including use of the F scale, was not clear or objective · aerial images of the property taken on January 2024 and January 2025 suggested trees around the home and the shed were generally intact and undamaged · the failed transmission towers were 157km from the property and up to 80m tall. While it was unclear where the 175km/h wind speed referred to in E’s press release dated 9 July 2025 was recorded, it was unlikely to be relevant to the claim · SB’s conclusions were ‘not categorical or location-specific but rather comprise general statements about the prevailing atmospheric conditions, and the potential results of these conditions’ · in contrast, it had made these direct, categorical observations pertaining to the property: > the home adjacent to the claimed shed had not sustained visible damage to structure or cladding > the trees around the property were largely intact and undamaged · ‘Regardless of any damage to trees or structures in the surrounding areas, our direct observations are inconsistent with the property having been subject to localised wind gusts capable of causing structural damage to a compliant building’. Insurer is not entitled to partially deny the claim Based on the exchanged information, I am not satisfied that the insurer has established it is entitled to deny the claim. This is because: · SW’s position the home had not sustained damage is contradicted by BB’s repair estimate dated 12 June 2024 · SW’s position the trees around the property were largely intact and undamaged is based on a review of aerial images and is contradicted by numerous photos submitted by the complainant, BB’s repair estimate, Y’s email, and T’s report · I do not accept SW’s criticisms of the reports of T and SB and the reasoning of the complainant · to the contrary, having regard to the totality of the information the complainant provided, I consider those reports and the complainant’s reasoning to be strongly supported · as a weather and climate expert, SB is better qualified to comment on wind speeds likely experienced than SW, which is an engineer · the information the complainant has provided persuasively indicates that it is more likely than not that the wind speed experienced well exceeded 147.6km/h (41m/s), which SW said was a reasonable and appropriate value for the design site wind speed · therefore, the proximate cause of the disputed damage was the storm rather than any defects that may have been present. 2.2 Is the insurer to reimburse professional costs? Yes. The expert reports the complainant obtained have assisted it to establish an entitlement to indemnity for the disputed damage. AFCA may require an insurer to reimburse professional costs ​​The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. ​​When determining whether to require an insurer to make a costs contribution, AFCA considers matters such as the complexity of the complaint and whether the complainant needed to incur costs to understand or establish their claim. Insurer is required to reimburse costs I am satisfied that this complaint has involved complex engineering and meteorological issues. It is apparent that the complainant’s expert reports have assisted it to establish an entitlement to indemnity for the disputed damage. Therefore, the insurer is to reimburse the expert costs the complainant proves it incurred, subject to a maximum total cap of $5,000. 2.3 Why is the outcome fair? The outcome is fair because the complainant has established a loss claimable under the policy terms and the insurer has not shown the exclusion it relies on applies as the proximate cause of the disputed damage. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.