Claim mismanagement and delay in repairs; denial of temporary accommodation, strata levies and contents storage cover
Text of the determination
Determination
|
Case number
|
12-25-205491
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-25-205491 19 September 2025
1 Determination overview
1.1 Complaint
The complainants are lot owners of an apartment (the apartment) in a building complex (the property) located in the state of Victoria. LO, the insurer, issued a residential strata insurance policy for the property to the owners corporation (the policy). The policy is underwritten by the financial firm. For the sake of convenience, unless otherwise indicated, both LO and the financial firm will be collectively referred to as ‘the insurer’.
The policy provides cover for physical loss or destruction of, or damage, to the property (including the apartment) caused by an insured event that occurs during the period of insurance. The relevant period of insurance is 16 January 2024 to 16 January 2025.
As lot owners of the apartment, the complainants are beneficiaries under the policy.
This complaint involves two separate but related claims:
· on 14 February 2024, the complainants lodged a claim for water damage to the apartment following a storm which occurred the previous day (the first claim)
· the complainants lodged a claim for additional water damage to the apartment following another storm which occurred on 26 November 2024 (the second claim).
After the first claim was accepted, delays in providing a remedy for the complainants developed as evidence indicated the roof plumbing became overwhelmed during the February 2024 storm event. The insurer determined maintenance was required to fix the roof plumbing before repairs to the apartment could be commenced. The parties agree this maintenance was the responsibility of the owners corporation and it did not form part of the first claim.
The maintenance work was completed in March 2024 and repairs to the apartment were commenced by AB, builders.
The works rendered the apartment unfit for habitation. The insurer therefore provided temporary accommodation for the complainants and their new baby.
Concerns about the quality of the repairs were raised in late July 2024. This led to further remediation work being required and a cash settlement concerning damaged contents, accommodation, and other expenses being paid to the complainants.
Another builder, SK, was then engaged by the insurer to undertake the repairs to the apartment. However, before the works could be completed, the November 2024 storm happened and caused further water damage to the apartment. The complainants then lodged the second claim. This further delayed repairs.
The repairs have not been completed. The complainants remain in temporary accommodation.
The complainants also say the insurer has mismanaged their claims. They now seek the following:
· completion of the repairs to the apartment without further delay
· an assurance the insurer will provide cover for further temporary accommodation until repairs have been completed and they can safely return to the apartment
· cover under the policy of their strata costs while they are unable to occupy the apartment
· cover under the policy for the costs associated with the storage of their contents
· non-financial loss compensation for the stress, delays, inconvenience and anxiety they have endured during the claim process as a result of the insurer’s claim mismanagement.
1.2 Issues and key findings
Should the insurer continue to fund temporary accommodation?
Yes. The exchanged material demonstrates it is fair and reasonable for the insurer to fund temporary accommodation on an ongoing basis until repairs have been completed and the complainants can return to the apartment.
Should the insurer cover the complainants’ strata levy costs?
Yes. The insurer should pay the complainants’ strata levies for the period they have been unable to occupy the apartment as a consequence of the damage caused by the February and November 2024 storms.
Should the insurer cover the costs of storage of contents?
Yes. The insurer should provide cover for the costs associated with the removal and storage of the complainants’ contents.
Has the insurer mismanaged the claims?
Yes. The exchanged material shows the insurer has, at times, mismanaged the claims.
Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay to the complainants the total sum of $5,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the insurer’s mismanagement of parts of the claim process contributed to avoidable delays which prevented the complainants from returning to their apartment in a timely manner
· cover for the complainants’ strata levies for the period they have been unable to occupy the apartment is consistent with the terms of the policy and the principles of fairness
· cover for the removal and storage of the complainants’ contents is consistent with the terms of the policy and the circumstances of this complaint
· the exchanged material shows the insurer has, at times, mismanaged the claims
· an award of non-financial loss compensation is reasonable and appropriate.
1.3 Determination
This determination is in favour of the complainants.
The complaint should be resolved in accordance with section 2.6, below.
2 Reasons for determination
2.1 Should the insurer continue to fund temporary accommodation?
Yes. The exchanged material demonstrates it is fair and reasonable for the insurer to fund temporary accommodation on an ongoing basis until repairs have been completed and the complainants can return to the apartment.
Parties provided a brief history of the claims
In relation to the first claim, one of the complainants reported:
Our unit flooded on February 13, 2024. Luckily, my husband and I were home, finishing my son’s nursery. I was 34 weeks pregnant. I heard rain that sounded too loud, so I checked to see if our bedroom windows were open. Instead, I saw water coming in through our ceiling, onto our bed and carpet. I yelled for my husband and he came. We were cycling buckets to collect the water. It wouldn’t stop. I got photos and videos and we called our Body Corp Management to send a plumber. This took hours. My husband had to move all our water damaged furniture alone, as I was too pregnant to help. I slept on the couch, and my husband on the floor of my son’s nursery. This was the case for a while…
On the day the first claim was lodged, the insurer engaged PC, loss adjusters, to assist with claim management.
SR, plumbers inspected the property on 25 March 2024. SR reported:
The downpipe above [the apartment] picks up a significant catchment from the upper-level roof. [This point loading upon the lower-level box gutter] is causing the overflow into the apartment.
SR also:
· noted that part of the plaster ceiling in the apartment had collapsed
· believed the box gutter above the apartment would not have been compliant when the property was constructed
· recommended the downpipe that terminates on the level above the apartment be altered so that it terminates directly into the rain head, and the overflow provision be upsized so that the box gutter does not overflow.
SR concluded that, once the ‘volume’ has been removed from the roof above the apartment, the roof plumbing would be able to cope ‘even in the largest storm event’, notwithstanding it remains non-compliant.
At this juncture, the complainants stated:
The insurer did not require the roof plumbing to be brought to code before moving forward with our bedroom repairs. The “fix” suggested by SR was enough to satisfy them despite being aware that it would not be brought to code.
Accordingly, on 28 May 2024, PC confirmed that maintenance works had been completed and that remedial works on the apartment could be commenced by AB, the insurer’s builders.
Following advice that these works would make the apartment unfit for habitation, particularly given the complainants’ newborn baby, temporary accommodation was arranged.
The complainants and their baby vacated the apartment on about 26 June 2024.
On about 25 July 2024, the complainants raised concerns regarding the quality of work which had been completed by AB. PC then attempted to engage a second builder, but the complainants did not agree after reading online reviews.
A third builder, SK, was then engaged by the insurer to complete the repairs. The complainants were informed about SK’s engagement on 4 September 2024 and immediately agreed. However, before SK could complete the works, the November 2024 storm happened and caused further water damage to the apartment. The complainants then lodged the second claim.
Subsequently, LV, leak detectors, inspected the apartment on 5 December 2024. LV noted:
· water damage in various locations in the apartment
· examination of the external wall revealed openings around penetrations that did not appear to be fully sealed
· some rain heads are not sealed to the wall in the same area
· external wall linings appear to have been installed in front of the floor slab on each level. In theory, water getting behind the linings from above may flow all the way to the ground floor as there is no slab to stop the water flow.
The insurer then extended its funding for temporary accommodation for the complainants and their baby for the period 30 January 2025 to 18 February 2025.
In a letter dated 24 February 2025 the insurer stated:
The claim relates to storm damage to [the apartment]. At this point in time, we are arranging the necessary experts to attend your property to confirm the cause of water entry…
Due to the absence of information confirming the cause of the property damage, we are currently unable to finalize our policy decision or response. We have engaged our own specialists to conduct leak detection testing to ascertain whether the damage falls under the policy's coverage. We will provide further updates once we receive information from [PC].
Around this time, the insurer extended funding for temporary accommodation until 31 March 2025, on a without prejudice basis.
However, the complainants took issue with the insurer’s claim that additional trades needed to be engaged to determine the cause of the water ingress. In March 2025, the complainants said:
Causation report confirms water ingress coming in through the corner wall. I had explicitly stated that this was where water was coming in to every single person that attended our unit in Feb 2024. It was not looked into in 2024. [The insurer] neglected to investigate properly…
We were told that our insurer would not approve [temporary] accommodation until a cause was determined. We had to fight this. Now, they say they will not approve accommodation until maintenance work is done. This is on the building, not on us. We have no control over this. This goes against the recommendation of our broker, claims adjuster, and medical professionals. They have changed their terms with no basis, just to prevent us from having stable accommodation for our family.
LV inspected the property again on 3 March 2025. It concluded:
The cause of the [ongoing] damage [to the apartment] is water ingress through external wall penetrations. Plumbing pipe penetrations and poorly installed gutter chutes and rain heads that have not been adequately sealed are allowing water into the wall cavity and units below.
LV recommended further maintenance works, including sealing all pipe and rain head penetrations and privacy screens, and the installation of flashing to cover the top of the gutter chute penetration through the wall.
On 12 March 2025, PC emailed the complainants regarding a deadline which the insurer had set for any outstanding maintenance to be completed. At this juncture, the insurer was still insisting that the maintenance was completed prior to the resumption of further repairs in the apartment. PC stated:
If the deadline of the 31st March is not met, the Insurer has advised they will not pay further accommodation until maintenance has been completed.
Maintenance works were said to have been completed on 15 April 2025. However, following review by SK, it was discovered that the maintenance repairs had not been performed as recommended and further works were required.
In its additional response dated 21 May 2025, the insurer stated:
In order to get the [complainants] back in their home, [the insurer] had agreed to complete the required works on their unit without these maintenance works being completed, on the basis that [the insurer] would not be liable for any damages which occurred as a result of the maintenance works being left incomplete as per their recommendations. The [complainants] confirmed that they did not want to be liable for any damages.
Indeed, in an effort to resolve the claims, the insurer put the following settlement cash offer to the complainants on 26 May 2025:
Total repairs as currently quoted - $12,792.35
Add: 10% contingency for unforeseen costs: $ 1279.24
Add: Temporary accommodation for 3 weeks x $284/night - $5,964
Add: 2-week contingency for unforeseen delays x $284/night - $3,976
Total: $24,011.59 less $2000 excess = $22,011.59.
Given the history of the claims and the many delays that had occurred, the complainants rejected the offer. In an email dated 3 June 2025 the complainants stated:
The offer was insufficient in both funds and time for temporary accommodation, and required us to accept liability for the repairs… Considering [the insurer’s] history of getting everything done incorrectly, this was a not a liability that was reasonable for us to accept.
Repairs have not been completed
The repairs have not been completed. The complainants say the insurer has mismanaged their claims. As indicated, they now seek the following:
· completion of the repairs to the apartment without further delay
· an assurance the insurer will provide cover for further temporary accommodation until repairs have been completed and they can safely return to the apartment
· cover under the policy of their strata costs while they are unable to occupy the apartment
· cover under the policy for the costs associated with the storage of their contents
· non-financial loss compensation for the stress, delays, inconvenience and anxiety they have endured during the claim process as a result of the insurer’s claim mismanagement.
Indeed, in an email to the insurer dated 7 March 2025, the complainants stated, amongst other things:
You are granting and denying our accommodation on a basis of prejudice. There is no way that we will be reinstated in our home on March 31. The maintenance works, testing, and reinstatement of our property will not be competed in this time. If this is not possible, how is it not with prejudice that you are denying stable accommodation to a young family with a baby, whom you have been asked by the brokerage, loss assessment, and medical professionals to grant? There is no reasonable explanation for not allowing us to stay in one place until we can return home. You have cost us suitable accommodation multiple times now despite professional recommendations. This is prejudice.
The complainants’ difficulties and concerns are also captured in the complaint they lodged with AFCA on 20 February 2025:
Our insurance company… has breached our policy terms, used intimidation tactics against us, and has delayed our repairs to safely return home, whilst causing immense stress for the last 50 weeks, to the point where I have had to seek professional mental health assistance due to their treatment. This has been a nightmare for our family.
Policy provides cover for damage and loss caused by insured events
The policy provides cover for loss and damage caused by various insured events. Included in such cover is physical loss, destruction or damage to property (including the apartment) caused by, for instance, storms.
Page 16 of the PDS states:
Section 1
Property: Physical Loss, Destruction or Damage
1. Cover
This Section covers:
Physical loss or destruction of or damage to Insured Property caused by an Event occurring during the Period of Insurance and not otherwise excluded.
Unless stated otherwise in this Section 1, the most We will pay per Event is the Sum Insured.
‘Event’ is defined in the PDS as:
Event
An occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to Insured Property.
I am satisfied the storms of February and November 2024 are ‘events’ as per the policy provisions.
Additional policy benefits are set out at pages 18 to 23 of the PDS. Relevantly, these include:
5. Additional Benefits B
Following physical loss, destruction or damage covered under this Section 1 of the Policy (or in other circumstances described in any of the Additional Benefits B below), We will also pay, in addition to the Sum Insured, the following amounts, costs and expenses incurred in consequence of the physical loss, destruction or damage
[…]
5.16 Costs of Losses Incurred by the Lot Owner
We will also pay the following amounts, costs and expenses incurred by a Lot Owner in consequence of physical loss, destruction or damage covered under this Section 1:
[…]
b) Loss of Rent, and Temporary Accommodation
[…]
ii) Temporary Accommodation
Where the Lot Owner occupies the Lot, the reasonable cost of:
a) immediate emergency accommodation and meals up to $2,500; and
b) Temporary Accommodation, necessarily incurred by the Lot Owner if the Lot is made unfit to be occupied for its intended purpose.
We will pay an amount of money for temporary accommodation calculated on the basis of similar accommodation located in the vicinity of the Location.
We will pay from the time of the physical loss, destruction or damage until the time the Lot Owner re-occupies the Lot following completion of reinstatement or replacement of Your Insured Property.
Insurer says delays were related to maintenance works
The insurer addressed the claim delays and disputes regarding the ongoing funding of temporary accommodation in its additional response dated 3 April 2025:
There are a number of reasons for this, and some of these issues would fall with [the insurer]. This claim has been going on for a considerable amount of time, and there are some instances when further proactivity could have assisted in the claim progressing more efficiently.
However, these instances are not the reason for the stalling in progress of the claim, or in the approval of temporary accommodation. These are a result of maintenance works not being completed at the Insured’s property and lay with the Owners Corporation to arrange. These have been outstanding for some time, and we are aware of the Applicant’s efforts for this to progress [emphasis added].
I disagree. I am satisfied the exchanged material shows that a substantial delay came about in about mid-2024 because the repairs to the apartment undertaken by AB were not of an acceptable standard and had to be completed again by SK. This is important. Had the insurer ensured that AB completed the repairs in an acceptable and timely manner, the complainants would have returned to the apartment in August or September of 2024.
Moreover, at that juncture, the initial maintenance works to the roof plumbing had been completed. SR concluded in March 2024:
Once the volume has been taken off the roof above [the apartment], even though it is non-compliant, it would be able to cope even in the largest storm event.
It is therefore reasonable to conclude that, had the complainants returned to a fully repaired apartment in, say, September 2024, with a maintained roof plumbing system able to cope ‘even in the largest storm event’, the November 2024 storm may not have caused the additional damage it did cause. The insurer has presented no persuasive evidence to displace this conclusion.
I note there is no evidence to suggest the apartment was previously damaged by the many severe storms that had occurred in the period since construction of the property was completed up until the February 2024 storm event.
In addition, a second substantial delay occurred in the months of September to November 2024. In its report dated 22 November 2024, PC stated:
[SK] have confirmed the unit owner and Insured have completed the required documentation and they are scheduling works to be undertaken the week starting 25 November 2024 and expect to complete the works within seven days.
The storm which led to the second claim occurred on 26 November 2024. SK was originally engaged by the insurer on 4 September 2024. The insurer has provided no explanation as to why there was a delay in excess of 80 days before SK could commence the necessary repairs.
Once again, had SK commenced and completed the repairs to the apartment in a more timely manner, the November 2024 storm may not have caused the extent of additional damage it did cause.
These delays are significant. Moreover, the complainants played no part in causing them. Yet the need for temporary accommodation on an ongoing basis is required in large part because of the delays.
It follows it is fair and reasonable for the insurer to fund temporary accommodation on an ongoing basis until the repairs to the apartment have been completed and the complainants can safely return to their home.
2.2 Should the insurer cover the complainants’ strata levy costs?
Yes. The insurer should pay the complainants’ strata levies for the period they have been unable to occupy the apartment as a consequence of the damage caused by the February and November 2024 storms.
Complainants unable to return to the apartment
The insurer denied the claim for cover of the complainants’ strata levies related to the period following lodgement of the first claim. In its letter dated 24 February 2025, the insurer stated:
The owners of [the apartment] presented two strata levy invoices for evaluation in accordance with the policy. [PC] confirmed that the invoices relate to levies that would be paid regardless of the event. Furthermore, [PC] indicated that the levies were not explicitly imposed as a direct result of the event or damage being claimed.
Pages 18 and 19 of the PDS states:
5. Additional Benefits B
Following physical loss, destruction or damage covered under this Section 1 of the Policy (or in other circumstances described in any of the Additional Benefits B below), We will also pay, in addition to the Sum Insured, the following amounts, costs and expenses incurred in consequence of the physical loss, destruction or damage
[…]
5.7 Maintenance Fees and Strata Levies
The maintenance fees and strata levies required to be paid by the Lot Owner to You during the period the Lot is unfit for occupation following physical loss, destruction or damage.
I am satisfied the insurer should provide cover for the complainants’ strata levies for the period they have been unable to occupy the apartment. This is because:
· the complainants were unable to occupy the apartment as a consequence of the physical, loss and damage caused by the storms of February and November 2024, as well as the avoidable circumstances set out above
· strata levies are included as an additional benefit in section 5.7 on page 19 the PDS.
Moreover, whilst the insurer says the levies were not explicitly imposed as a direct result of the event or damage being claimed, it is difficult to imagine a situation in which strata levies would be imposed as a direct result of an insured event.
The inclusion of the strata levy additional benefit in the policy implies that that specific provision has work to do. Failing to pay the strata levy additional benefit in this instance would therefore render the provision redundant.
In any event, given the matters raised herein, the principles of fairness dictate that, in this particular instance, the insurer should provide cover for the costs of the complainants’ strata levies for the period during which they have been unable to occupy the apartment.
The insurer should resolve this part of the claim in accordance with section 2.6, below.
2.3 Should the insurer cover the costs of storage of contents?
Yes. The insurer should provide cover for the costs associated with the removal and storage of the complainants’ contents.
Insurer’s denial of claim for storage costs was erroneous
The insurer denied the complainants’ request for cover for the removal of their contents to protect their personal items from potential water ingress. In its letter dated 24 February 2025 the insurer stated:
[PC] confirmed that the lot owner’s contents are not needed to be moved because of the event or to allow for the reinstatement works to proceed.
Pages 20 to 21 of the PDS state:
5.16 Costs of Losses Incurred by the Lot Owner
We will also pay the following amounts, costs and expenses incurred by a Lot Owner in consequence of physical loss, destruction or damage covered under this Section 1:
[…]
f) Removal and Storage of Lot Owners’ Contents
Costs reasonably incurred by the Lot Owner in:
i) removing undamaged Lot Owners’ Contents to the nearest place of safe keeping;
ii) storing undamaged Lot Owners’ Contents at that place or other equivalent place; and
iii) returning undamaged Lot Owners’ Contents to the Location(s) when occupancy of the Lot is permitted.
I am satisfied the complainants’ contents should have been removed from their apartment and stored and the insurer should fund the costs of such removal and storage. This is because of the following considerations.
First, by February 2025, the insurer was already aware of the severity of the damage to the apartment, including the collapse of the bedroom ceiling, because of storm water ingress. Moreover, in its report dated 5 March 2024, PC noted some contents had already been damaged:
As a result of the event, the unit owner has advised their master bedroom carpet, bed and chest of drawers have been damaged.
Second, in its letter dated 24 February 2025, neither PC nor the insurer adequately explain why the complainants’ contents did not need to be removed from the apartment.
Third, in its report dated 28 May 2024, after maintenance works had been completed, PC noted:
Upon starting the works [on the apartment] further mould was discovered, and additional remediation was required.
Fourth, in early 2025 there was persuasive evidence about the extent of damage to the apartment. This includes, but is not limited to:
· both of LV’s reports, which contain depictions of thermal imaging that clearly shows dampness caused by water ingress in several separate locations throughout the interior of the apartment
· a spray test conducted by LV during its second inspection of the apartment. The test was ceased to avoid further damage as soon as water ingress was detected.
Fifth, the removal of the contents from the apartment and their storage is consistent with the terms and conditions of the policy.
Finally, the denial for this part of the claim appears particularly unusual, given it was made during February 2025, and mould had already been detected in the apartment as early as May 2024. It is common knowledge that February is one of the most humid months in Melbourne. It is therefore reasonable to conclude that the potential for damage to contents by continuing water ingress and related humidity and mould growth is particularly high.
The insurer should resolve this part of the claim in accordance with section 2.6, below.
2.4 Has the insurer mismanaged the claims?
Yes. The exchanged material shows the insurer has, at times, mismanaged the claims.
Insurer did not account for avoidable delays it caused
In its letter dated 13 March 2025 the insurer stated, amongst other things:
Firstly, we are sorry for the issues which you have experienced over the course of the First Claim and Second Claim. We can see that this has been going on for longer than anticipated and appreciate that the process has had a significant impact on your family…
We have reviewed the claim file for both the First Claim and Second Claim and can see there have been several obstacles which have led to the claim being delayed in progressing. In summary:
a. There was a delay in clarifying causation for the First Claim;
b. The quality of the works completed by [AB] for the First Claim was not up to standard. This led to remediation work being required and a cash settlement concerning damaged contents, accommodation, and other expenses; and
c. The Second Claim further delayed repairs.
We appreciate the impact these delays have had, and the frustrations given the work should have been completed following the first set of repairs in May 2024.
We can see as well that over the course of the claims you have had significant issues with arranging temporary accommodation. We acknowledge the difficulties this has caused, particularly with a baby involved. While it is never the intention to cause additional stress, we can see that the process followed has not been up to standard. We apologise for how this has been handled…
Temporary accommodation remains a priority whilst the works are completed, and this will be monitored under the Second Claim. Please let us know if after the approval of the additional temporary accommodation you have any further concerns, though we do understand a further complaint has been raised which addresses some of these issues.
Unfortunately, the content of this letter does not accord with PC’s email to the complainants the day prior (that is, 12 March 2025) regarding the aforementioned deadline which the insurer had set for its funding of temporary accommodation. PC advised:
If the deadline of the 31st March is not met, the Insurer has advised they will not pay further accommodation until maintenance has been completed.
It is difficult to reconcile the insurer’s letter and its loss adjuster’s email. This leads to the reasonable conclusion the claims were still being mismanaged to some extent in March 2025.
Moreover, an email to AFCA from the complainants dated 17 March 2025 adds detail and colour to the picture painted by the insurer’s letter dated 13 March 2025. The complainants say:
Please, I implore you, can you get a case officer assigned to our case as soon as possible? We have a baby. His whole life has been spent in unstable turmoil due to our insurer's negligence in dealing with our claims. Our first claim occurred 6 weeks before he was born. He will turn 1 next week. This is supposed to be a joyous time for us. Instead we are worried about having a roof over our heads.
It took [the insurer] three months before they got someone in to determine the cause of our second claim, and they’re taking it out on us. We have done everything in our power to move this claim along, and nothing to hinder its progress. We will be homeless as of March 31st…
[The insurer] has denied us multiple aspects of our claim. These are things we are owed as per our policy. They are blatantly disregarding their own policy, without any substantive reason. They have now threatened to cut off our accommodation at the end of this month, on March 31st, if maintenance works aren’t completed by our building before then. They have not given the building a fair amount of time to arrange this… They are holding this against us personally, as we have pushed them to provide us with what we are owed as per their own policy, and they have fought us tooth and nail every step of the way. They have denied us further accommodation against the recommendations of our loss adjuster, broker, and medical professionals. Our policy states that we are to be provided with accommodation until our unit is reinstated and we re-occupy. They have decided that they don’t want to do this. It’s a breach of policy.
They have put limitations on us in the past to pressure us into less than we are owed. They have done this in violation of our policy. Our policy also keeps them from denying us any part of our claim due to actions or failure to act by our body corp manager. They are breaching policy on both accounts. They are betting on the building not getting the repairs done so they can stop paying for our accommodation.
We have done all we can to help expedite this claim. I have put in countless hours following up with everyone involved for 13 months. I have done more work than anyone employed to deal with our claims. I have found a plumber and done my strata manager’s work. I am granting access where I can. I cannot make this go faster…
We cannot afford to pay for accommodation, draining our funds, and pay our bills and mortgage, without getting reimbursed for our costs.
In addition, the avoidable delays set out in section 2.1, above, show claim mismanagement. I also note the concessions made by the insurer in several letters to the complainants.
2.5 Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay to the complainants the total sum of $5,000 in non-financial loss compensation.
Complainants suffered due to claims process
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
I accept the complainants in this matter have suffered an unusual degree of physical inconvenience and interference with their expectation of enjoyment and peace of mind.
For instance, recurrent disputes about ongoing temporary accommodation benefits and the quality of the repairs and remedial works undertaken by the insurer’s trades have caused a significant degree of stress, anxiety, inconvenience and delay for the complainants.
Moreover, the manner in which the claims have been mismanaged, at times, has taken a serious toll on the health and wellbeing of the complainants. Medical evidence of the stress and anxiety and associated psychological problems suffered by the complainants has been exchanged with the insurer, so there is no need to detail it again in this determination. Suffice to say, the lengthy duration of the claims, the manner in which they have at times been mismanaged by the insurer, and the imposition of these stressful situations upon the complainants during which time they welcomed their first child, have all combined to cause a substantial interference with their ‘expectation of enjoyment or peace of mind’.
Understandably, the complainants feel aggrieved.
Given these considerations, the insurer should pay to the complainants, jointly, the total sum of $5,000 in non-financial loss compensation.
2.6 Complaint should be resolved this way
Time is of the essence
Within 14 days’ notice that the complainants accept this determination, the insurer must:
· undertake to fund temporary accommodation on an ongoing basis in accordance with the terms of the policy until repairs have been completed and the complainants can return to the apartment
· pay to the complainants, jointly, the total sum of $5,000 in non-financial loss compensation
· upon production of suitable evidence (such as accounts, receipts, or the like), accept the claim insofar as it relates to coverage of the complaint’s strata levies and process it in accordance with the terms and conditions of the policy and the matters set out in this determination. At a minimum, the insurer must cover the complainants’ strata levies for the period they have been unable to occupy the apartment following the February 2024 storm event
· accept the claim insofar as it relates to the removal and storage of the complainants’ contents, and process it in accordance with the terms and conditions of the policy without delay. Moreover, the complainants are entitled to lodge a separate claim for cover of any contents damaged by water ingress (and/or humidity and associated mould). The insurer must also cover the costs associated with the disposal of any such damaged contents
· if the complainants have already paid for temporary accommodation, the strata levies and/or the contents removal and storage costs referred to above, upon production of suitable evidence (such as accounts, receipts, or the like), refund such amounts to the complainants, together with interest on the amounts in accordance with section 57 of the Insurance Contracts Act 1984 from the date such monies were paid by the complainants until the date settlement is paid
· provide to the complainants an explanation, and breakdown, of how the interest has been calculated.
Finally, should the complainants accept this determination, upon completion of the repairs and works to the apartment and before the complainants return to (re-occupy) the apartment, the insurer must:
· arrange for the apartment and the repairs to be inspected by a suitably qualified building inspector to ensure the repairs have been completed to a reasonable and acceptable standard
· ensure the apartment has been thoroughly cleaned and decontaminated.
2.7 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the insurer’s mismanagement of parts of the claim process contributed to avoidable delays which prevented the complainants from returning to their apartment in a timely manner
· cover for the complainants’ strata levies for the period they have been unable to occupy the apartment is consistent with the terms of the policy and the principles of fairness
· cover for the removal and storage of the complainants’ contents is consistent with the terms of the policy and the circumstances of this complaint
· the exchanged material shows the insurer has, at times, mismanaged the claims
· an award of non-financial loss compensation is reasonable and appropriate.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.