Home / Allianz Australia / Determination 12-25-203752

Determination 12-25-203752

Dispute over cash settlement amount for hail damage repairs; complainant sought builder's higher quotes

FirmAllianz Australia
Decided2026-06-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$84,947
SourceAFCA PDF

Summary

The complainant disputed the insurer's cash settlement for hail damage to roofs, seeking the higher quotes from his builder. AFCA found the insurer's offer was largely adequate, required only that the contingency uplift rise to 20%, and rejected non-financial loss.

The complainant did not show the insurer's builder quote was inadequate to cover the reasonable cost of repair, though a 20% contingency uplift was fair for passage of time and unforeseen costs.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-203752 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-203752 8 May 2026 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). On 21 October 2024, the complainant lodged a claim for damage to the roofs at the property following a hail storm on 23 December 2023. The complainant requested a cash settlement. The insurer accepted the claim and offered to cash settle the repairs, relying on builder, IG’s, scope of works (SOW) and quote of $55,561.64 less excess of $700. The complainant says the insurer’s offer is insufficient to meet its policy obligations. It has provided SOWs and quotes from its own builder, CC. Most recently, this includes a repair quote of $71,577.07 for repairs of the main roof, shed and verandah and a liability quote for the carport and patio for $13,369.95. The insurer says CC’s quotes are excessive and do not represent the reasonable cost of the repairs. The complainant disagrees. He seeks the amount of CC’s quotes. The complainant is represented in this complaint. Unless otherwise stated, I have referred to the complainant and his representative as ‘the complainant’ in this determination. 1.2 Issues and key findings Is the insurer required to increase its offer? Substantially, no. The insurer’s offer covers the damage attributable to the claimed hail storm. However, the insurer is required to increase the contingency uplift on the settlement amount to 20%. Is non-financial loss compensation payable? No. I am not satisfied that the insurer caused unreasonable delay or otherwise mishandled the claim. Why is the outcome fair? The outcome is fair because the insurer has covered the damage attributable to the hail storm. The complainant has not shown that further repairs or higher amount is required to meet the insurer’s obligations. It is fair that the insurer increases the contingency uplift to 20%. 1.3 Determination This determination is in favour of the insurer. If the complainant accepts this determination, within 14 days of being notified of the complainant’s acceptance, the insurer to is cash settle the damage by paying: · $55,661, less $700 excess, plus 20% uplift in recognition of the transfer of risk and loss of insurer’s warranty on the repairs 2 Reasons for determination 2.1 Is the insurer required to increase its offer? Substantially, no. The insurer’s offer covers the damage attributable to the claimed hail storm. However, the insurer is required to increase the contingency uplift on the settlement amount to 20%. Onus on complainant to establish a valid claim The complainant is required to show, on the balance of probabilities (that it is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. The home building policy is made up of the product disclosure statement (PDS) and the certificate of insurance (COI). There is no dispute the insurer sent these documents to the complainant. The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events and not subject to exclusions, is covered. Damage due to hail is an insured event and covers loss or damage caused by storm, cyclone, rainwater or runoff. Complainant lodged claim for hail damage The complainant says the insured property was damaged by a hail storm on 23 December 2023. He lodged a claim for the damage on 21 October 2024. The insurer has accepted the claim. However, a dispute has arisen relating to the repair costs. The insurer offered to pay $55,661.64 less $700 excess for repair of the hail damaged parts of the roof, based on SOW and repair quote from the insurer’s panel builder, IG, dated 21 November 2024. On 25 September 2025 the insurer increased its offer to include a 10% contingency uplift. The complainant provided a number of SOW and repair estimates from builder, CC. The most recent is dated 5 December 2025 and includes: · repair quote of $71,577.07 for the main roof, verandah and shed · liability quote of $13,369.95 for repairs to the patio and carport. Insurer offered to cover the damage and says repairs correctly assessed The insurer appointed builder, TT, who inspected the roof on 23 October 2024. TT said that minor hail damage had occurred to the house roofs, patio roof, shed roof and carport roof. The insurer said that it was unable to warrant repairs because the curved verandah, patio and carport roofs are underpitched. The insurer appointed roofer, IR, to attend the property on 31 October 2024. IR said that: · hail damage had occurred to approximately 5% of the main roof and verandah roofing, 20% of the patio roof and 10% of the garage roof · hail damage has occurred to approximately 20% of the rear patio · approximately 5% of the main roof and verandah roof is hail damaged · the carport roof is made with second hand trimdek, is under pitched and has dents all over it · foot traffic creases were found on the rear patio, main roof, lower skillion roof of the garage and main gable of the garage · dents were visible on two whirly birds · the patio, curved verandah carport is underpitched. The insurer appointed electrician, EE, to attend the property on 30 October 2024. IR reported random hot spots on the solar panels consistent with the storm event. It said that the solar system required replacement. The complainant requested the claim be cash settled. The insurer arranged for its panel builder, IG, to provide a scope of works (SOW) and repair quote for the accepted damage. Since providing that quote in November 2024, IG has gone into liquidation. The insurer offered to cash settle the claim for $54,961.64 ($55,661.64 less $700 excess) in accordance with IG’s SOW and quote. The complainant says cash settlement offer is insufficient The complainant says that IG’s quote, which underpins the insurer’s cash settlement offer, is inadequate and fails to include several essential items required to reinstate the property to its pre-loss condition. In particular, he says: · IG’s quote undervalues the necessary repairs and fails to cover the following costs: > provision of additional battens necessary to meet National Construction Code (NCC) requirements > replacement of hail-damaged solar panels > rectification of under‑pitched structures > scaffolding/edge protection in accordance with SafeWork Queensland guidelines · as the insurer has said that its builder cannot warrant the repairs due to the incorrect roof pitch of the veranda, patio and carport, IG’s quote should not be relied upon · the complainant says its quotes represent current market rates and like-for-like reinstatement required for the insurer to meet its policy obligations. The complainant also relies on CC’s supplementary report that was provided in September 2025. It says: · approximately 50% of the main roof is damaged, with 29 of 50 roof sheets requiring replacement, along with associated cappings and flashings. · approximately 50% carport roof is damaged, including roof linings, cappings, and flashings · approximately 87% of the patio is damaged, with 7 of 8 roof sheets requiring replacement · both whirlybirds are damaged beyond repair and require replacement · damage has occurred to 12 of 24 front shed roof sheets · the solar panels sustained hail impact damage and require replacement · Queensland Building and Construction Commission (QBCC) guidelines require that where more than 20% of a roof is damaged, building codes and engineering standards require full roof replacement, not partial repair to ensure structural integrity and compliance with applicable building and engineering standards · as the hail damage to the main roof, patio, carport, and shed exceeds the 20% threshold, the requirement for full roof replacement is triggered · the work is subject to final certification by a licensed building certifier upon completion and CC considers certification would not be issued for partial roof replacement where engineering standards cannot be met. Partial replacement would leave the property non‑compliant and uncertified. The complainant provided a number of SOW and repair estimates from builder, CC. The most recent is dated 5 December 2025 and includes: · repair quote of $71,577.07 for the main roof, verandah and shed · liability quote of $13,369.95 for repairs to the patio and carport. It says it is unable to warrant those repairs because the patio and carport are underpitched. The complainant says, full roof replacement and the higher amount set out in CC’s quote is required to meet the insurer’s obligation to reinstate the property to its pre-loss condition, including meeting engineering, certification, and compliance obligations. The complainant says that CC’s quote is higher but comprehensively accounts for all required works, reflects current market rates, and includes mandatory costs such as scaffolding and QBCC Home Warranty Insurance. He says CC’s pricing is supported by industry benchmarks and regulatory requirements, whereas IG’s pricing is considered inadequate and non‑compliant. Complainant has not shown IG’s quote is insufficient to complete the repairs The policy provides that: Buildings claims If we agree to cover the claim for loss of or damage to buildings, we will pay the reasonable cost of repairing or rebuilding the damage part of the building to the same condition as when it was new. At our discretion (acting reasonably), we may: · enter into a contract with a builder to repair or rebuild your home, or · pay the reasonable cost of repairing or rebuilding your home in cash or cash equivalent. Having considered the exchanged information, on balance, the complainant has not established that the insurer’s offer is insufficient to cover the repairs in accordance with its policy obligations. That is because: · I give limited weight to CC’s supplementary report. It provides no photos and limited data to supports its conclusions · limited information has been provided by the parties about the extent of the hail damage. The exchanged information does not show that more than 20% of the roof sheeting on any of the structures was damaged by the hail storm · in any event, am not persuaded by the complainant’s position that roof replacement is required where more than 20% of the roof is damaged. The QBCC guidelines say replacing more than 20% of a roof requires building approval. That is not a requirement that the roof be replaced. The exchanged information does not show that a certifier will not certify the repairs carried out in accordance with IG’s SOW and quote · I am not persuaded by the complainant’s position that the policy requires the insurer to cover insulation and sarking in circumstances where it is not part of the current build. The exchanged information does not show it is needed for certification of like for like repairs · the exchanged information does not show that the allowance for scaffolding provided in IG’s SOW and quote is inadequate or does not meet regulatory requirements · I am unable to accept the complainant’s submission that IG’s quote does not provide allowances for certification and QBCC Home Warranty Insurance. Those costs are included in IG’s quote · I am not persuaded by the complainant’s position that CC’s higher quote does necessarily reflect the current market rates for roofing and solar works in Queensland. This is not supported by the exchanged information · The exchanged information does not show that IG’s allowance of $7,474.07 for solar panels is inadequate. While the CC’s allowance is greater, it does not identify a particular system or explain why that amount is required · the exchanged information does not show that higher rates apply than those provided for in IG’s quote due to the property’s rural location · the complainant has not shown that temporary accommodation is required for the repairs to be completed · while IG’s quote is lower than CC’s, considering the information overall, I am not persuaded that it was inadequate for the repairs to be undertaken at the time it was offered. I have considered the complainant’s position that the insurer is not entitled to rely on IG’s quote because the insurer’s builders were unwilling to undertake the work as they could not warrant it. In circumstances where the complainant sought a cash settlement and both parties agree that some of the repairs cannot be warranted, it is fair that the insurer cash settle the claim. As the complainant has not shown the IG quote does not cover the reasonable cost of repairing the home, I am satisfied the insurer is entitled to settle the claim for that amount, subject to an uplift as set out below. Insurer is required to increase contingency uplift to 20% The insurer chose to cash settle the claim using the quote from IG ($55,661.64 less $700 excess). The insurer’s settlement offer includes IG’s quote of $55,661.64 less $700 excess plus 10% contingency uplift. It is fair that the insurer increases its contingency uplift to 20% to recognise the passage of time since IG issued its quote and as contingency for unforeseen costs. Accordingly, I am satisfied that is a reasonable settlement of the claim. 2.2 Is non-financial loss-compensation payable? No. I am not satisfied that the insurer caused unreasonable delay or otherwise mishandled the claim. Insurer is not required to pay compensation AFCA may decide that the insurer is to compensate the complainant for non-financial loss if the insurer's conduct caused an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the complainant’s expectation of enjoyment or peace of mind has occurred. The complainant initially claimed $5,000 non-financial loss but later withdrew his claim. I have considered the exchanged information, and I am satisfied the insurer handled the claim reasonably overall and within a reasonable timeframe, and I do not consider payment of non-financial loss compensation is warranted in the circumstances 2.3 Why is the outcome fair? The outcome is fair because the insurer has covered the damage attributable to the hail storm. The complainant has not shown that further repairs or higher amount is required to meet the insurer’s obligations. It is fair that the insurer increases the contingency uplift to 20%. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.