Home / QBE / Determination 12-25-202357

Determination 12-25-202357

Whether insurer must separately arrange and pay for a structural engineering inspection of the concrete slab after cash settling the claim

FirmQBE
Decided2025-11-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a fire, the insurer cash settled the building claim including a $2,650 engineering allowance. The complainant wanted the insurer to arrange the inspection; AFCA found in favour of the insurer.

The engineering allowance was itemised in the quote given before acceptance and the policy allows cash settlement, so the insurer need not arrange the inspection.

Issues

Subjects and remedies

broker or intermediaryhome or building damageno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-202357 | Financial firm | QBE Insurance (Australia) Limited Case number: 12-25-202357 6 November 2025 1 Determination overview 1.1 Complaint The complainant held accidental damage insurance for building and contents with the financial firm (insurer). The insurer accepted and cash settled a claim for fire damage to the insured building. The dispute concerns whether the insurer must separately arrange and pay for a structural engineering inspection of the concrete slab. The complainant says the insurer never told him the cash settlement included $2,650 for this inspection. He says he accepted the settlement on the basis that the insurer would arrange the engineering inspection after demolition was complete. The insurer says the cash settlement included the engineering allowance. It says the detailed quote showing this cost was provided to the complainant before he accepted the settlement. The insurer says the complainant has received the benefit of the engineering allowance and it is now his responsibility to arrange the inspection at his own cost. 1.2 Issues and key findings Was the engineering allowance adequately disclosed in the offer? Yes. The insurer provided the complainant with a detailed quote which itemised the $2,650 engineering cost within the demolition scope of works. While the parties had different understandings about the terms of the settlement, the engineering allowance itself was clearly disclosed to the complainant before he accepted the cash settlement. Is the insurer required to arrange the engineering inspection? No. The complainant requested a cash settlement and the insurer provided one. The insurer discharged its obligations by including a reasonable allowance for engineering fees in the cash settlement. The policy does not require the insurer to arrange the inspection itself. The complainant has not established the allowance is inadequate. Why is the outcome fair? The insurer disclosed a reasonable engineering allowance in its cash settlement, which the complainant accepted. Therefore, it would not be fair to require the insurer to arrange the inspection. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this claim or complaint. 2 Reasons for determination 2.1 Was the engineering allowance adequately disclosed in the offer? Yes. The insurer provided the complainant with a detailed quote which itemised the $2,650 engineering cost within the demolition scope of works. While the parties had different understandings about the terms of the settlement, the engineering allowance itself was clearly disclosed to the complainant before he accepted the cash settlement. Policy provides additional benefits for fees and debris removal The policy provides cover for additional benefits beyond the building sum insured, as set out below at section 3.2. The relevant benefits are for ‘fees’ and ‘removal of debris’. The engineering inspection relates to assessing whether the concrete slab requires removal. This falls within the scope of fees incurred in relation to repair or replacement of the home, and also relates to the removal of debris. The insurer was entitled to include an engineering allowance in the cash settlement under these additional benefits. Detailed quote clearly showed the engineering cost The insurer's loss adjuster emailed the complainant and his broker on 28 May 2024 at 3:11pm. This email attached: · a cash settlement fact sheet · the builder’s complete quotation dated 22 April 2024. The builder's quote included a detailed scope of works. Under the "Demolition" section, it itemised: - Item 1.1.1: Full demolition down to concrete slab level… Note concrete slab to remain and engineer to provide a report on the condition after demolition - $31,800.00 - Item 1.1.2: Protect concrete surfaces during demolition - $2,650.00 - Item 1.1.3: Engineering: “Engineer Inspect Provide report on the structural integratory of the concrete slab" - $2,650.00 The quote specified the engineering inspection as a separate line item with its own cost. This was not hidden or obscured in the documentation. The total of these three demolition items was $37,100.00, which with margins and GST became the final cash settlement amount of $43,579.25. The cash settlement fact sheet described the settlement as "Building - removal of debris based on quotation provided by [PB]" for $43,579.25. While this description did not explicitly mention the engineering component, it expressly referred to the PB quotation as the basis for the settlement. The complainant was provided with both documents together. Parties had different understandings but allowance was disclosed The parties had different understandings about the terms of the cash settlement. The complainant understood the insurer would separately arrange the engineering inspection after demolition. The insurer understood it had included the engineering cost in the cash settlement and the complainant would arrange the inspection himself. However, this dispute about the parties' understandings is separate from whether the engineering allowance was disclosed. The documentation provided to the complainant before he accepted the settlement clearly itemised the $2,650 engineering cost. The allowance was adequately disclosed. The complainant says he was never informed verbally or in writing that the settlement included the engineering cost. However, he has provided little information to support his assertions about what happened. In addition, the information shows he was provided with the detailed quote which clearly showed this cost. The onus was on the complainant to review the quote before accepting the cash settlement. He had ample time to do so and support from a broker. Parties’ communication did not vary settlement terms The complainant's email of 6 November 2024 accepting the settlement stated: I accept the terms for the rubbish removal a demolition of house down to slab level on the basis that a structural engineer will then be inspecting the house slab. The insurer did not respond to correct the complainant's understanding that it would arrange the inspection. However, by this time, the detailed quote showing the engineering allowance had been provided months earlier. The insurer was entitled to rely on the documentation it had provided. I am not persuaded the insurer’s silence in response to his statement was sufficient to vary the settlement agreement, particularly given the clear terms and disclosure of the engineering allowance noted above. Such a variation would require very clear language from both parties, which was not present in this case. I consider the insurer’s silence was consistent with its interpretation of the complainant’s email that he would arrange the engineering assessment himself. The interactions between the parties do not establish the terms of the settlement agreement should be interpreted in the complainant’s favour, particularly given the insurer’s interpretation was supported by the settlement documentation. 2.2 Is the insurer required to arrange the engineering inspection? No. The complainant requested a cash settlement and the insurer provided one. The insurer discharged its obligations by including a reasonable allowance for engineering fees in the cash settlement. The policy does not require the insurer to arrange the inspection itself. The complainant has not established the allowance is inadequate. Insurer entitled to cash settle The complainant preferred to engage his own trades for the demolition work. The insurer agreed to cash settle the debris removal claim. This reasonable approach accommodated the complainant's preferences. Nothing in the policy requires the insurer to arrange repairs or associated work itself rather than cash settling. The policy states the insurer will either repair, replace or rebuild the home or cash settle the cost of doing so. The cash settlement fact sheets provided to the complainant explained he could choose between repair or cash settlement as alternatives. By accepting the cash settlement, the complainant accepted the transfer of responsibility for arranging the work. Engineering allowance is adequate The insurer included $2,650 for the engineering inspection in the cash settlement. The allowance, on its face, represents a reasonable commercial estimate of the cost. The complainant has not provided any evidence to establish this allowance is inadequate. The complainant has not obtained a quote for the engineering inspection. He has not provided information about what such an inspection would cost. The complainant has not shown the $2,650 allowance is insufficient to engage a structural engineer to inspect and report on the concrete slab condition. In the absence of evidence that the allowance is inadequate, I am satisfied the insurer has discharged its obligations under the additional benefits provisions by including this amount in the cash settlement. No basis to require insurer to arrange inspection The complainant seeks to have the insurer arrange the engineering inspection separately, rather than using the allowance already paid. However, there is no basis in the policy for this outcome. The policy requires the insurer to pay reasonable fees for work incurred in relation to repair or replacement of the home. It does not require the insurer to arrange such work itself when a cash settlement has been provided for this purpose. The engineering inspection allowance was properly paid as an additional benefit. The insurer has met its obligation under the policy. The complainant's argument appears to be that, because he misunderstood the terms of the settlement, the insurer should now arrange the inspection. However, the misunderstanding does not change the fact that the insurer provided adequate disclosure of the engineering allowance and included it in the cash settlement. The complainant accepted and received payment of the settlement. As noted above, the policy entitled the insurer to cash settle the engineering fees rather than arranging the inspection itself. The insurer has discharged its obligations by providing a reasonable allowance for this work. 2.3 Why is the outcome fair? The insurer disclosed a reasonable engineering allowance in its cash settlement, which the complainant accepted. Therefore, it would not be fair to require the insurer to arrange the inspection. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Key policy extracts Additional benefits: fees and removal of debris Additional benefits We give you the following Additional benefits. For any Additional benefits to be payable, you must suffer or incur the relevant loss, liability or damage during the period of insurance. The Additional benefits will be paid in addition to the sum insured as listed on your Policy Schedule. … 2. Fees If this Policy insures your home, and: it is damaged as a result of an event insured under this Policy; and your claim is accepted, we pay any reasonable fees which we have approved and which are incurred directly in relation to repair or replacement of your home. 3. Removal of debris If this Policy insures your home, and: it is damaged as a result of an event insured under this Policy; and your claim is accepted, we pay the reasonable costs of demolition and removal of debris from the site to the nearest authorised facility.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.