Determination 12-25-194219
Denial of flood damage claim on basis of wear and tear exclusion
Summary
The complainant claimed for flood damage to his holiday home, which the insurer denied as wear and tear. AFCA found in favour of the complainant, requiring the insurer to assess the damage, repair or cash settle, and contribute up to $5000 to his engineer's report.
On the balance of probabilities the complainant's more persuasive engineering evidence established flood damage, and the insurer did not establish any exclusion applied.
Issues
- Claim denial primary · upheld“The insurer has not established that any exclusions apply; the complainant established a claim for damage caused by flood.”
- Inadequate claim investigation secondary · upheld“A's scope focused on inundation inside the house; it should have focused on underfloor inundation and its impact on the stumps.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationrepair or rectify
Related
All Allianz Australia determinations · Find similar determinations
Text of the determination
Amended Determination
|
Case number
|
12-25-194219
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-25-194219 28 August 2026
1 Determination overview
1.1 Complaint
On 10 January 2024, the complainant claimed on his home insurance policy for damage he said was caused by flooding on 26 December 2023. He was using the home as a holiday house at the time so was not present at the time of the event.
The financial firm (the insurer) has denied the claim on the basis that the damage was not caused by flood but was the result of wear and tear, gradual deterioration and depreciation. This is excluded under the policy.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
No. Based on the expert engineering evidence, the complainant has, on the balance of probabilities, established a claim for damage caused by flood under the policy. The insurer has not established that any exclusions apply.
Is the insurer liable to contribute to the cost of the complainant’s engineer’s report?
Yes. The engineering report obtained by the complainant was central to the determination of the claim. It also raised clear deficiencies in the report relied upon by the insurer to deny the claim. It is fair that the insurer contributes to the cost of that report up to the sum of $5000.
Why is the outcome fair?
This outcome is fair. The complainant has established through his expert evidence that the likely cause of the damage was flood. The insurer’s expert accepted that conclusion as plausible but said more technical work was needed in order to be definitive. The insurer did not undertake that additional work. It is fair that the insurer be liable for the damage caused by the flood.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of this determination:
· the insurer is to engage an appropriate person to assess the repair cost of the damage caused by the flood based on actionable quotes and to pay the complainant a contribution to professional costs of up to $5000;
· the complainant is to cooperate as needed in the identification and assessment of damage;
· once the assessment is complete, within 7 days the insurer is to exercise its discretion as to whether to arrange the repairs or cash settle the claim and advise the complainant; and
· then it should execute its chosen option as soon as possible.
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
No. Based on the expert engineering evidence, the complainant has, on balance, established a claim for damage caused by flood under the policy. The insurer has not established that any exclusions apply.
The policy covers flood damage subject to exclusions
It is established insurance law that an insured must first establish, on balance, that the loss or damage claimed falls within the policy cover. If that is done, the burden then shifts to the insurer to establish, again on balance, the application of any exclusion in the policy should it want to deny the claim.
The policy cover is set out in two documents. The Product Disclosure Statement (PDS) which sets out the terms of the policy including optional elements. And the policy schedule, which sets out the details applicable to the complainant including what options have been taken up.
The PDS lists a series of specified events covered by the policy and the optional covers that can be taken up. One of the options is cover for loss or damage caused by flood or by flood water combined with runoff and rainwater. This specifically extends to loss or damage caused by or arising from soil movement or subsidence if it is directly caused by and occurs within 72 hours of a flood. The policy schedule makes clear that the complainant has taken up this flood cover.
The policy also contains general exclusions applicable to all events. These include loss or damage caused by or arising from wear and tear, gradual deterioration, depreciation or lack of maintenance.
The complainant’s claim
The complainant claimed on the basis the property was damaged by flood. The claimed damage is primarily:
· wall cracking in the kitchen and entry;
· doors catching or not closing properly; and
· floors being out of level.
Insurer relies on an engineer’s report
The insurer had a loss adjustor, C, attend and report on 23 January 2024. C found indications that a large portion of the dwelling had subsided, along most of the right-hand side of the dwelling. Whilst the sub-floor was difficult to access, where it was sighted it was damp. C concluded that a specialist was needed to confirm the floor levels and cause of any subsidence. Also, if possible, determine the length of time it had been there.
C arranged for an engineer, A, to inspect and report on the matter. A attended the property on 22 April 2024. A concluded there was no obvious indications of flood damage to the property which would have caused damage to the existing structure. In particular:
· no indication of water damage to internal floors or walls;
· floor levels were measured with no major changes observed. Variations were limited to approximately 10mm which is deemed to be within acceptable tolerance;
· while access was limited, no water marks or mud build-up under the floor or in the subfloor area and the sub floor was dry;
· some stumps had water marks due to rising damp;
· soil under the floor appeared dry without any depressions in the soil which would have allowed water to pool; and
· external areas of the property did not have any obvious signs of water accumulation or evident flooding marks around the base of the home, perimeter fence or sheds.
It was on the basis of this report that the insurer denied the claim on 13 July 2024.
Complainant also relies on an engineer’s report
The complainant contested the accuracy of A’s findings. In particular, he provided photo and video evidence which appeared to show a 40mm variation in the kitchen floor level within a two metre span. The insurer maintained its denial and A suggested that the complainant had selected the worst spot to measure. A noted that its own measurements were done on a best practice basis, although by this time A was acknowledging that the report was in error and the level of variation A measured was plus or minus 15mm.
Subsequently, after AFCA had provided its Preliminary Assessment of the matter, the complainant obtained his own engineering report. This was provided by S, who attended the property on 13 December 2025 and reported on 11 January 2026. S found:
· the topography of the area beyond the boundaries of the complainant’s property was a converging bowl like catchment that would have directed water towards the complainant’s property;
· this bowl like topography was repeated immediately adjacent to the house where the ground was 97mm above the top of the subfloor area;
· review of photographs of flooded areas on the day showed flooding of property at significantly higher elevations than the complainant’s property, strongly inferring flooding at the complainant’s property;
· there was water staining at a consistent level on all the stumps with consistent levels of degradation of the soil at the base of the stumps;
· this suggests inundation by standing water and is not consistent with rising damp where variation in the level of the staining and efflorescence would be expected;
· the floor levels had a maximum deflection of 47mm globally with maximum local deflection on shorter spans of 22mm, well beyond serviceability standards; and
· this was likely caused by inundation of the sandy soil reducing the bearing capacity and shear strength of the sandy soil resulting in non-uniform movement of the stumps.
S was critical of A’s report on the basis that:
· it did not include a review of the topography beyond the site, which in S’s view was a key contributor to the flooding;
· A measured the floor levels at a limited and inadequate number of locations (7 as opposed to the 30 done by S); and
· the report mischaracterised the stump staining as rising damp because the staining was to a uniform level, whereas rising damp would not create staining to a uniform level.
The report of the complainant’s engineer, S, is the more persuasive
I find S’s report to be the more persuasive of the two. It is much more detailed and thorough in its analysis. When asked to review and comment on it, A said:
· A’s own scope was focussed on water inundation and damage inside the house;
· S’s scope was expanded to include focus on the failure of the foundation system due to flood inundation;
· S’s report is well compiled, but the main conclusions require a more detailed analysis to be definitive; and
· a geotechnical report on the soil details and water table level and an inspection to determine depth of stumps and pad size are needed and a more detailed hydraulic model of the area may also be beneficial.
A did not seek to defend its own earlier report from the criticisms made by S. In particular it did not seek to refute S’s floor level measurements or interpretation of the staining on the stumps. It also acknowledged the benefits of greater consideration of the local topography.
I conclude from this that A largely accepted those criticisms and accepted that S’s report provides a plausible analysis of causation. More fundamentally, it indicates that A’s scope had been focused on possible water inundation inside the house. This is surprising. It should have been clear, from the nature of the claim and from C’s initial report, that the focus should have been on possible underfloor inundation and its impact on the stumps. Finally, A thought more work was needed to reach a definitive conclusion.
Insurer did not take up its expert’s suggestions for further analysis
The insurer did not seek to undertake any of the work, suggested as needed by A. Rather it relied on three arguments to maintain its denial of the claim.
First, the fact that the onus is on the complainant to establish damage within the policy and A’s view that more work was needed before S’s conclusions on causation could be considered definitive. I do not accept this. The complainant is required to establish a loss within the policy terms on the balance of probabilities. The complainant is not required to do so definitively. Considering the two engineers reports, A’s acknowledgment of the plausibility of S’s conclusions and A’s more limited focus, I consider the complainant has met that burden of proof. It would not be fair or reasonable to allow the insurer to put the complainant into the position of having to do the further work that the insurer’s own expert has suggested is necessary.
The insurer’s second argument is based on statements in A’s response to the report of S as follows:
there was no evidence of wall or ceiling cracking in the plaster at the time of [A]’s inspection, which was completed approximately 4 months after the claimed flooding event. There was new unpainted plaster in one room but unless the remainder of the house was repaired post flooding, we would expect to see some cracking in the walls and / or ceiling for the noted floor movement. This could be an indication of longer-term floor settlement where any cracking has been historically repaired.
I have a few observations on this. A’s report after its inspection was very brief with less than two pages of text. It is not clear from the report how thoroughly the walls and ceilings of the house were examined. The focus was on the absence of evidence of internal inundation. Beyond this, the complainant has consistently raised concerns about the walls and ceilings being damaged, including at the point of claim lodgement. Thus, it would seem he had observed damage. Finally, A has not said that an absence of cracking rules out the stump and floor movement being caused by flood. If A had thought that, it would not have made sense for A to suggest that all of the additional technical work was needed to check the veracity of S’s conclusions.
The third argument is that C says that on its inspection on 16 January 2024 the uneven floor levels were obvious and there were signs of ongoing renovations. From this it concludes that the uneven floor levels pre-dated 26 December 2023 flood event. There are two problems with this. Firstly, the denial of the claim was based on absence of significant unevenness in the flooring. It is inconsistent with that to now say it was obvious that the floors were uneven. Second, acknowledging that the complainant has been doing renovations, the fact of those renovations does not preclude damage, including uneven flooring, being caused by the flood event.
I remain satisfied that the complainant has met the burden of proof and it is more likely than not that the house was damaged by the flood event on 26 December 2023. The insurer has raised no issue with whether the 72 hour condition is met. Nor has it established that any exclusions apply. The insurer is liable for the damage caused by the flood.
Co-operation necessary to determine what damage was caused by the flood
I have accepted that the variable movement of the stumps and uneven flooring was caused by the flood and the insurer is liable for the damage caused. As the insurer has denied liability from the outset, no assessment has been done of what damage was in fact caused. The process of assessing that is now more difficult due to the passage of time and potentially the ongoing renovation of the house. For example, during the dispute the insurer considered problems with the kitchen cabinetry to be central to the complainant’s concerns. However, the complainant clarified with AFCA on 6 May 2025 that that is not the case.
Thus, the parties now need to cooperate to determine what damage was caused by the flood.
2.2 Is the insurer liable to contribute to the cost of the complainant’s engineer’s report?
Yes. The engineering report obtained by the complainant was central to the determination of the claim. It also raised clear deficiencies in the report relied upon by the insurer to deny the claim. It is fair that the insurer contributes to the cost of that report up to the sum of $5000.
AFCA has power to award a contribution to costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply.
Complainant’s engineer’s report was central to the outcome
The engineering report the complainant obtained from S was central to the determination of the dispute. It established the likely cause of the loss and identified some inadequacies in the expert report the insurer had been relying on. It is appropriate that the insurer contribute to the cost of the report. I am not aware of what the cost was. The insurer should pay either the cost of the report or $5000, whichever is the lesser.
2.3 Why is the outcome fair?
This outcome is fair. The complainant has established through his expert evidence that the likely cause of the damage was flood. The insurer’s expert accepted that conclusion as plausible but said more technical work was needed in order to be definitive. The insurer did not undertake that additional work. It is fair that the insurer be liable for the damage caused by the flood.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.