Earthquake damage claim denied as caused by construction and age-related factors rather than the insured event
Text of the determination
Determination
|
Case number
|
12-25-193838
|
Financial firm
|
Insurance Manufacturers of Australia Pty Ltd
Case number: 12-25-193838 26 November 2025
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy covering defined events (policy) with the financial firm (insurer). On 29 May 2023, he lodged a claim for earthquake damage to the property that occurred the day before.
the insurer denied the claim based on two engineering reports attributing damage to long-term footing movement from poor drainage, reactive soil, and construction issues; not the earthquake. The complainant disputes this, arguing the earthquake caused new damage, citing unweathered cracks, level misalignment, and historical MM4 earthquake impacts as evidence of a sudden seismic cause.
He wants the insurer to accept the claim and repair the damage. The complainant also says the insurer mishandled the complaint.
A representative is assisting the complainant. Any reference within this determination to the complainant includes the representative unless otherwise stated.
1.2 Issues and key findings
Has the complainant established a valid claim?
No. The exchanged information shows, on the balance of probabilities (that is more likely than not), a valid claim for earthquake damage has not been established. The damage is due to causes not covered under the policy.
However, the insurer has offered a $2,000 ex gratia payment in recognition of the complainant’s longstanding customer relationship and claims experience.
Did the insurer mishandle the complaint?
No. The exchanged information shows, on balance, the insurer’s handling of the complaint was reasonable in the circumstances.
Why is the outcome fair?
The outcome is fair because it has been established, on balance, the damage was caused by construction and age-related factors and does not meet policy conditions. Without a valid claim, it would be unfair to require the insurer to accept liability. The $2,000 ex gratia payment is appropriate in the circumstances.
1.3 Determination
This determination is in favour of the insurer. The insurer is entitled to deny the claim.
Within 14 days of receiving notice the complainant accepts this determination, the insurer is required to pay the complainant $2,000 ex gratia.
2 Reasons for determination
2.1 Has the complainant established a valid claim?
No. The exchanged information shows, on balance, a valid claim for earthquake damage has not been established. The damage is due to causes not covered under the policy.
However, the insurer has offered a $2,000 ex gratia payment in recognition of the complainant’s longstanding customer relationship and claims experience.
Policy cover is subject to terms, conditions, and exclusions
The policy covers the period from 15 September 2022 to 15 September 2023. Coverage is defined in the product disclosure statement (PDS) and certificate of insurance (COI), which must be read together. Relevant terms are outlined in section 3.2.
There is no dispute the complainant received a copy of the policy documents. The insurer is entitled to rely on the terms of the policy in assessing the claim.
Policy covers insured events
The policy covers defined insured events. This means that not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events occurring during the period of insurance and not subject to the exclusions, is covered.
One of the insured events covered under the policy is ‘earthquake’ including landslide and subsidence that occurs immediately as a result. Cover is subject to the policy exclusions, including damage due to settling, shrinkage or expansion in buildings, foundations, walls or pavements and gradual loss.
The onus is on the complainant to establish the damage to the building is the result of an earthquake or other insured event under the policy during the period of insurance.
AFCA’s approach to proximate cause
The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause.
The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss.
If one cause causes loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause.
Insurer says no earthquake damage
The complainant lodged the claim on 29 May 2023; reporting damage first noticed by his tenant immediately after the 28 May 2023 earthquake. He maintains the damage was not pre-existing and provided three supporting statutory declarations to the insurer.
The insurer’s builder (PI) assessed the property on 13 June 2023. The claim was declined on 21 June 2023, citing pre-existing cracks visible in Google Street View (2019) and evidence of aged damage, such as debris and spider webs in the cracks. The insurer says the claim was declined in line with policy exclusions for settling, shrinkage, or expansion in buildings.
Following a complaint, an engineering review by HE reaffirmed PI’s conclusion. Specifically, HE found:
· property: 40-year-old brick veneer home on strip footings and timber/concrete stumps
· location: approximately 20 km from earthquake epicentre
· earthquake intensity: MM4 which is below damage threshold (MM5–MM7).
· internal damage:
> uneven and bouncy floors
> cracking in wall linings and cornices
> sagging ceiling in bathroom.
· external damage:
> cracked and displaced brickwork
> mortar deterioration and fretted bricks
> no articulation joints
> water ponding and nearby tree roots.
The report concludes the damage was not caused by the earthquake, rather by ongoing differential footing movement. This movement is attributed to reactive clay soil (Class H1/H2), poor drainage, tree root drying, inadequate construction, and footings, as well as brickwork growth and rising damp.
Two areas were identified as unsafe; the sagging ceiling in the bathroom and displaced brickwork at the northeast corner of bedroom one. No earthquake-related repairs were recommended, as all issues are considered pre-existing. The claim was formally declined again on 1 August 2023.
Complainant rebuts HE’s findings
The complainant has not submitted any independent expert evidence to support his position. While the property is leased, the tenancy is informal. Therefore, no regular inspections were conducted or condition reports prepared.
Rather, by email in May 2024, the complainant submitted a rebuttal to HE’s report with two repair quotes and statutory declarations stating the damage was not present before the earthquake.
The rebuttal was prepared by the complainant’s representative assisted by the complainant’s relative who is a civil engineer.
The complainant says:
· damage to the north east external brick wall and adjacent bedroom plaster occurred immediately after the earthquake. The damage includes eight bricks split in half and cracking consistent with lateral roof movement
· supporting evidence includes:
> three statutory declarations affirming no prior damage
> photographs showing level footings and fresh cracks
> spirit level readings indicating no subsidence.
He critiques HE’s report and:
· disputes conclusions of differential movement and subsidence
· highlights contradictions in HE’s observations (e.g. dry sub-floor, no stump distress)
· argues that lack of articulation joints and solid construction made the wall vulnerable to seismic stress
· the building met the code at the time of construction. However, its solid construction without articulation joints made it prone to cracking from lateral earthquake forces
· challenges PI’s report and:
> claims spider webs and debris are not reliable indicators of age
> notes that the crack being claimed is not the one visible in 2019 Google Street View.
The complainant references the 2021 earthquake (MM4) which caused damage in Melbourne. He emphasises the 2023 earthquake was shallower (1 km depth), making it potentially more damaging.
He also says he has been a loyal customer of the insurer for over 40 years and has never lodged a claim until now. The claim denial has caused him and his wife distress and trauma.
Complainant also relies on 1995 engineering ‘White Paper’
In addition, the complainant says a 1995 White Paper, prepared after the 1989 Newcastle earthquake to address gaps in understanding the seismic performance of unreinforced masonry, proves the building was earthquake damaged.
He says HE’s report describes the building as ordinary workmanship with average mortar, not designed for lateral force. The complainant argues this aligns with the type identified in the White Paper as vulnerable to seismic damage. He says the White Paper shows the damage matches the expected cracking pattern of unreinforced brickwork from an earthquake.
HR rejects complainants’ rebuttal submission
The insurer acknowledged the complainant’s concerns and referred them back to HE for further review. In its supplementary report, HE says:
· the engineer reaffirms the original conclusion; damage is not caused by the 2023 earthquake
· damage caused by differential footing movement, brickwork growth, lack of articulation joints, and age-related deterioration
· the 2023 earthquake (MM4, magnitude 3.8) is considered too weak to cause the observed damage, especially to brick veneer walls which typically require MM7 intensity
· comparisons to the 2021 earthquake (MM5.9) are deemed not relevant due to its significantly higher energy and different structural failure mechanisms
· cracks observed in Google Street View images from years prior to the earthquake support the conclusion of pre-existing structural issues
· the residence likely met standards at the time of construction. However, its footings no longer comply with current codes, particularly AS2870, which now prohibits stump-type footings on Class H soil.
Complainant’s submission not persuasive
I acknowledge the complainant disputes HE’s engineering reports, arguing the inspection was inadequate and the damage, supported by technical evidence and statutory declarations, appeared immediately after the earthquake.
He references the 2021 earthquake event to support MM4 damage potential and highlights inconsistencies in HE’s reports, while also emphasising his long-standing customer history.
However, I am not persuaded by the complainants’ submissions. This is because:
· the complainant has not submitted any independent structural testing and relies on visual observations and expert opinion without soil or material testing
· attention is focused primarily on the north east brick wall and adjacent room, without a full structural assessment of the property
· the 2019 Google image shows step cracking to an external brick wall, indicating structural changes and building movement since construction and prior to the 2023 earthquake
· the lack of any routine inspection reports and/or images to show the condition of the property pre-earthquake and prove the damage was not pre-existing
· the statutory declarations, are subjective accounts and do not carry the technical weight of independent expert opinion
· the two builder quotes do not establish causation or confirm the damage was earthquake related. A quote is not a substitute for an engineering assessment
· while the assumption of earthquake damage is plausible, causation is inferred rather than conclusively proven
· the submission relies on news articles and anecdotal evidence to support technical claims, which may lack engineering rigor.
White paper does not assist complainant
HE reviewed the White Paper. It says it confirms unreinforced masonry, including brick veneer construction, is considered suitable for low-seismic regions such as Australia when designed and built in accordance with AS1170.4 and related standards.
Analysis of the 2023 earthquake indicates an intensity of MM4 at the subject property. This is significantly below the MM7 threshold typically required to cause damage to brick veneer walls.
In contrast, the Newcastle earthquake referenced in the paper was far more severe (approximately 63 times greater in amplitude and 512 times greater in energy than the 2023 earthquake). It occurred under different soil and proximity conditions, making its effects irrelevant to this claim.
The east wall is longer than its height and shows a vertical V-shaped crack, wider at the top than the base. HE says this pattern is not consistent with cracking from horizontal earthquake loading on unreinforced brickwork.
Observed cracking patterns and severity do not align with earthquake-induced damage, supporting the conclusion that construction deficiencies, rather than seismic forces, are the likely cause. Accordingly, previous engineering opinions remain unchanged.
I am not persuaded the White Paper assists the complainant. This is because the paper is research based on the Newcastle earthquake, irrelevant to the complaint and not direct evidence of causation at the insured property. To assess causation, assessment must be based on observable physical evidence and seismic data.
HE’s report is more persuasive
On balance, HE’s reports are more persuasive. I am satisfied the reports show the damage to the building was not caused by an earthquake, or any other insured event.
This is because:
· the reports apply engineering standards and seismic data, referencing the Modified Mercalli Intensity Scale and Australian Standards
· the rebuttal response directly refutes the complainant’s claims, reinforces the original findings, and confirms the damage was not caused by the 2023 earthquake
· geological and seismic data, including shake maps and soil classification (Class H1/H2) support the likelihood of differential movement due to reactive clay
· site observations document cracking, mortar deterioration, and structural displacement, with photos
· HE identified construction issues including lack of articulation joints, rotted stumps, and inadequate footings
· MM4 intensity is below the level typically required to damage brick veneer structures (MM7)
· HE reviewed the findings of the White Paper and found it irrelevant to this complaint. This is due to differences between the two earthquake events in terms of:
> magnitude
> soil conditions, and
> proximity.
On balance, no valid claim has been established
I have carefully considered the exchanged information. Without persuasive expert evidence to the contrary, I am not satisfied, on balance, the earthquake on 28 May 2023 was the proximate cause of the damage to the building.
The exchanged material shows the damage is the result of ongoing differential footing movement caused by reactive clay, poor drainage, tree roots, inadequate construction, brickwork expansion, and rising damp.
A valid claim has not been established. Therefore, it is not necessary to determine if any policy exclusions apply.
The insurer is entitled to deny the claim.
Insurer’s offer of $2,000 ex gratia is fair
The insurer acknowledges the complainant’s loyalty and, in good faith, has offered a $2,000 ex-gratia payment without admitting liability.
As a valid claim has not been established, I consider the insurer’s offer is fair in all the circumstances. Within 14 days of receiving notice the complainant accepts this determination, the insurer is required to pay the complainant $2,000 ex gratia.
2.2 Did the insurer mishandle the complaint?
No. The exchanged information shows, on balance, the insurer’s handling of the complaint was reasonable in the circumstances.
Complainant says insurer mishandled complaint
The complainant says the insurer failed to meet industry standards by not providing timely updates or resolving the complaint within the required 30-day timeframe, leaving him and his authorised representatives without communication for months. The ex-gratia offer came 21 months after the original denial, highlighting significant delays and poor complaint handling.
On balance, the insurer did not mishandle complaint
I have carefully reviewed the exchanged information. On balance, I am not persuaded the insurer mishandled the complaint.
The complaint was posted on 23 February 2024. However, the complainant waited three months before following up on 21 May 2024 to confirm receipt.
The insurer lodged the complaint on 22 May 2024. It then promptly advised the need for an independent engineer’s report, followed up through June 2024 – July 2024, and closed the complaint on 26 July 2024 when no report was provided. The complaint was reopened on 29 January 2025, following lodgement of the AFCA dispute.
I acknowledge the delay in actioning the original complaint letter. However, I am satisfied it was fair for the insurer to request an independent engineer’s report. This is because it had relied on expert assessments. Closing the complaint was reasonable since reassessment could not proceed without new expert evidence.
2.3 Why is the outcome fair?
The outcome is fair because it has been established, on balance, the damage was caused by construction and age-related factors and does not meet policy conditions. Without a valid claim, it would be unfair to require the insurer to accept liability. The $2,000 ex gratia payment is appropriate in the circumstances.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Policy terms
|
Page
|
Description
|
25, 27
|
The events we cover
We cover your home or contents when certain things happen. These are known as 'listed events'. You can make a claim if a listed event takes place and causes loss or damage to your home or contents during the policy period.
You can add options to your Home Insurance policy to cover you for extra events. For more details, see Section 5.
We cover the listed events as shown in Table 3.1 under:
· Buildings Insurance
· Contents Insurance
Table 3.1 – Listed events
…
Earthquake
Buildings Insurance
Contents Insurance
If loss or damage is caused by an earthquake.
Covered
· earthquake
· landslide or subsidence that happens immediately as a result of an earthquake
…
|
66, 68
|
General exclusions for all covers and benefits
The exclusions set out in this section apply to all covers and benefits under your policy.
What we don't cover
Loss, damage, injury or death arising from:
· rust, corrosion, gradual deterioration, depreciation, wear or tear
…
· subsidence or landslide unless it happens immediately as a result of:
> an earthquake or explosion
…
· the settling, shrinkage or expansion in buildings, foundations, walls or pavements
…
|
99, 100
|
Definitions
The following words have special meaning.
…
incident is a single occurrence, or a series of occurrences arising out of the one event
…