Partial denial of storm water ingress claim for roof and bathroom damage as wear and tear, plus claim handling delays and mould
Text of the determination
Determination
|
Case number
|
12-25-193334
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-193334 14 October 2025
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under a residential strata insurance policy held by the owners corporation. The damage claimed included several areas of the property flooded after storms on or around 16 June 2024.
The insurer accepted the claim partially. It refused liability for the roof and bathroom damage on the basis these arose from causes excluded, including wear and tear.
The complainant seeks the insurer to accept the claim as the damage arose from the storms. She says the insurer should cash settle the claim based on her mould remediation specialist MP’s quote. This is because the property has deteriorated significantly from ongoing moisture and mould contamination. She is also suffering from a severe lung condition as a result.
1.2 Issues and key findings
Is the insurer’s settlement fair?
No. The exchanged information shows the property suffered water ingress from the storms. The insurer has not shown it has adequate grounds to deny the claim. The insurer is liable for the storm damage to the property and not for any maintenance related repairs.
Should the insurer pay non-financial loss compensation?
Yes. The insurer’s overall claim handling and delays caused severe stress and inconvenience to the complainant. The complainant resided at the mould contaminated property and fell sick. The insurer failed to arrange temporary accommodation despite the property’s condition.
Should the insurer pay indirect financial loss compensation?
Yes. The complainant is currently undergoing treatment for a lung condition caused by contamination and spread of mould at the property. It is fair the insurer reimburses the complainant for the medical expenses incurred directly relating to this condition.
Why is the outcome fair?
The parties are bound by the policy terms and conditions. It is fair the insurer covers a loss which falls within the scope of the policy. It is also fair the insurer should pay compensation for its claim handling.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to accept the claim, arrange settlement as detailed in section 2.1 and pay $6,300 non-financial loss compensation. It should also reimburse the complainant’s medical expenses incurred up to $6,300.
2 Reasons for determination
2.1 Is the insurer’s settlement fair?
No. The exchanged information shows the property suffered water ingress from the storms. The insurer has not shown it has adequate grounds to deny the claim. The insurer is liable for the storm damage to the property and not for any maintenance related repairs.
Complainant must establish a claimable loss
When making a claim, the complainant has the initial onus of establishing she suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim.
Policy cover is subject to terms and conditions
The policy covers damage to the insured property. It defines damage as any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded under the policy.
The policy does not cover damage caused by or arising directly or indirectly from lack of maintenance, rust, oxidation, corrosion, mould, mildew, wear and tear, fading, concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or gradual deterioration or, failure to maintain the insured property in a reasonably good state of repair. This includes when the damage to the insured property is caused by light, air, sand, the climate (which includes wind or rain) or the passage of time.
Parties provide different views on the cause of the damage
The complainant says:
· a storm event on 16 June 2024 caused significant damage to her home. The storms damaged the roof and as a result, excessive volume of rain entered the property
· she awoke to find her home flooded. The carpet in the corridor and master bedroom were saturated and the main bathroom was filled with water with additional water entering through the ceiling
· the bathroom did not have any leakage issues prior to the storms
· the roof gutters were cleaned around once a year from December 2017 to March 2024February 2025, and the complainant's roof cleaner provided a signed statement that he did not observe any noticeable changes or damage to the roof during that time
· the development of mould at the property was a result of the insurer’s delay in carrying out necessary repairs. After several months, the insurer denied the claim partially
· she was left without a habitable home. She was forced to remain in the property despite it being unsafe due to the significant mould infestation. As a result, she is suffering from a serious lung condition
· the insurer should settle the claim based on her quote and reimburse her expert costs and medical expenses.
The insurer says:
· it relies on its structural engineer LO’s and builder TSG’s findings which show that water escaped from the shower due to wear and tear and gradual deterioration
· it accepts the contents insurer’s (AL) experts IP’s and SM’s findings contradict with LO’s and TSG’s findings
· it denied the claim for maintenance related repairs but accepted liability for the resultant damage. It increased the settlement offer to $62,254.41 which includes a 15% uplift for contingencies
· should the complainant complete the maintenance works, it is willing to complete the resultant damage repairs
· given the extensive repairs and discrepancy between quotes, it proposes to engage a building consultant and engineer to attend the property and provide a new Scope of Works (SOW) and quote, including any mould remediation to restore the property back to its pre-damage condition
· the complainant can then choose for it to conduct repairs or cash settle the claim based on the new quote.
Experts provided different views on the cause of water damage and mould
QBE and AL engaged several trades and experts to attend the property and provide causation reports. The report findings contradict each other.
TSG attended the property on 26 June 2024:
We then safely accessed the roof and could see the a roof tile has slipped from position at the top of the ridge, as well as the concrete bed for the ridge tiles dislodging as well. Next, we conducted a spray test of the roof to 100% confirm this was the cause. After some time of doing this and battling the high winds we had water ingress into the roof cavity below. (sic)
TSG’s report dated 27 June 2024 states:
they gained access upstairs into the roof and found the ductwork has still got water ingress and felt damp. The roof wood truss also feels damp. The gas heater has got water residue, and the electrical pc board may also had some water going through. The ductwork from the evaporator has also got some water damage. The first-floor ceiling plaster still feels damp. The whole upstairs ductwork will need to be replaced. The gas unit will also need replacing. The register supply for evaporator and the return for the gas heater. There are 4 x small registers for gas heating. 1 x return. 1 x supply register for evaporation…As there was damage to the electrics throughout, we organized our electrician to attend nad make sur everything was safe (sic).
SM attended the property on 20 October 2024. SM conducted detailed tests and concluded:
In conclusion the bathroom seems unrelated to the stains within the home due to the good condition of the wet area.
On 12 November 2024, LO attended the property. LO concluded:
· plumbing investigations confirm water escape from the shower causing moisture damage to the ceiling below
· inspection of the moisture damage to the ceiling in the meals area indicates deterioration of the plaster consistent with ongoing ingress issues rather than a one-off ingress event.
IP attended the property on 5 December 2024. IP observed:
· there was no loss of pressure or evidence of visible leaks over a 20-minute observation period
· flow tests and dye tests were performed on all bathroom fixtures, including the bath, toilet, shower, and basin. These tests were supplemented with thermal imaging, which showed no evidence of moisture accumulation, water leakage, or hotspots, even when hot water was introduced into the system. No visible leaks or abnormalities
· a spray test was conducted on the shower cubicle for 15 minutes. This test revealed no water escape, seepage, or leakage from the rear or adjacent sides of the shower cubicle The results confirmed that the shower enclosure is watertight and functioning as intended
· based on the various tests performed, there is no evidence of water escape, pressure loss, or burst pipes within the bathroom that could account for the extent of water damage and loss reported by the complainant.
Concerned with the mould in her home, the complainant engaged MP to report on the property’s condition. MP concluded the mould has developed from the roof leak, water ingress and resultant damage to the property. MP found the master bedroom had an elevated spore count and recommended no people should occupy this room until remediation has been completed.
Storms caused the water and mould damage to the property
The panel accepts the water damage from the storm event and delayed repairs caused mould infestation at the property.
LO indicated the property may have suffered from pre-existing water ingress issues. The panel is not satisfied LO presented persuasive evidence showing the home had water ingress issues prior to the storm event. The insurer’s claim notes record that LO was unable to determine the cause of water damage to the master bedroom and the first floor landing.
The panel acknowledges the various experts who assessed the property have provided contradicting findings. While there were no extensive rains recorded in the weather data around the date of the loss, it shows the recorded wind speeds were high. Given:
· TSG’s initial assessment, within two weeks after the date of the loss, observed the roof tiles had dislodged – this allowed a large amount of water ingress into the property and resulted in water damage to the roof timbers
· SM observed the storm damage to the roof caused damage to several areas of the home. He concluded the bathroom was unrelated to the water damage to the remaining home, given the good condition of the wet area
· IP’s observations that there was no evidence of water escape, pressure loss, or burst pipes within the bathroom that could account for the extent of water damage and loss seen at the property
· the extent of water ingress to the property
the panel is satisfied the dominant cause of the water ingress to the property is from the storms in June 2024. The water ingress appears to have occurred at a point in time (typical of a storm) and not gradually (typical of wear and tear).
The panel however accepts the extent of the insurer’s liability is limited to the water/mould damage and does not include any maintenance works required to the property. The insurer is not liable for the repairs to the bathroom membrane (if it is found to be leaking due to maintenance issues), fixing other unrelated leaks and any roof maintenance works.
Insurer should settle the claim based on current and actionable SOW and quote
The insurer should also reimburse the complainant for temporary roof make safe works.
MP completed a comprehensive assessment of the mould contamination at the property. The complainant seeks the insurer to pay MP’s remediation and rebuild quote amounting to $262,317. While the panel acknowledges the property requires extensive remediation and repairs, the panel is not satisfied MP’s quote sufficiently details the SOW and the costing for the remediation and rebuild works.
The roof restoration quote from RR amounts to over $20,000. The panel accepts the storms damaged the roof. While the SOW includes storm damage repairs and mould remediation to the roof, it also includes other maintenance works including cleaning and painting. It is also unclear if any mould remediation works of RR may be duplicated within MP’s quote.
The insurer is liable for any storm damage to the roof including water damage to the timber support to the valley flashing plus mould remediation (including but not limited to the two roof valleys boards).
The panel accepts the insurer’s SOW should include storm damage and mould remediation to the property. This includes the replacement of the ducted heating and evaporative cooling systems. It should also include a complete check of the electricals at the property given the ongoing ingress and deterioration of the property’s condition over time.
The panel acknowledges the complainant’s concerns and that she does not wish to allow the insurer to complete any further assessments at the property. This is because there is a breakdown of relationship between the parties.
However, given the above, the panel does not accept the exchanged information enables it to ascertain a fair amount or scope of works. Given this, and to progress the matter, the panel agrees the insurer must engage either an independent engineer or an independent building consultant to prepare a detailed SOW.
The panel acknowledges the insurer has offered to conduct repairs. However, given the breakdown of the relationship between the parties and long history of the matter, the panel considers it is fair that the claim be cash settled.
Regarding the building damage, the panel is satisfied the insurer should settle the claim as follows:
Within 7 days of being notified of the complainant’s acceptance of this determination, the insurer is required to provide a list of three experts, who are independent and who have not previously been involved with the complaint, to the complainant. Each expert must be either an engineer or building consultant.
Within 7 days of receiving the list of experts, the complainant is required to communicate their choice to the insurer.
Within 7 days of being notified of the complainant’s chosen expert, the insurer is required to engage them to provide a scope of works.
Within 7 days of receiving the scope of works, the insurer is required to engage a builder to provide an actionable quote. The quote should also confirm the reasonable period required for repairs and mould remediation.
Within 7 days of receiving the quote, the insurer is required to cash settle the complainant with a 20% uplift for transfer of risk, contingencies and the loss of a guarantee on repairs.
Insurer should reimburse the complainant for expert costs incurred
The complainant incurred $195 in obtaining a copy of the building occupancy certificate from the council after the insurer raised concerns about roof installation at the property.
The insurer should reimburse the reasonable costs incurred in obtaining expert report costs including the roof report, mould report and the cost of the building occupancy certification up to $5,000. This is because AFCA may require the insurer to pay or contribute to professional costs, which are generally capped at $5,000, if those costs assisted the complainant to understand or establish their claim. The panel accept that is the case here.
Insurer must cover removal and storage of contents
The policy extends cover for lot owner’s removal and storage of contents. The insurer should cash settle the complainant for the cost of removal and storage of contents based on the complainant’s quote from H, amounting to $17,432.50.
Insurer must cover temporary accommodation costs
There is no dispute the home is uninhabitable in its current state. The complainant should move into temporary accommodation as soon as possible.
The insurer should cash settle the complainant for temporary accommodation cost pursuant to the policy terms and conditions until the insurer offers a cash settlement plus the reasonable period required for mould remediation and repairs. This period should be based on builder’s estimate set out above.
Complainant can lodge a new complaint
Should the complainant have any concerns about the insurer’s SOW, the actionable quote, the period of repairs, mould remediation or the settlement for temporary accommodation, she should raise her concerns initially with the insurer.
AFCA encourages the parties to work together in finalising this claim and complaint. However, if the parties are unable to resolve the concerns, the complainant may lodge a new complaint with AFCA for its review and consideration.
2.2 Should the insurer pay non-financial loss compensation?
Yes. The insurer’s overall claim handling and delays caused severe stress and inconvenience to the complainant. The complainant resided at the mould contaminated property and fell sick. The insurer failed to arrange temporary accommodation despite the property’s condition.
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of:
· physical inconvenience
· time taken to resolve the situation
· interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events.
Insurer should pay non-financial loss compensation
The complainant says the insurer’s claim delays and extensive mould contamination at the property resulting her in contracting a serious lung condition. She has had several tests, chest infections and visits to the hospital as a result. Her home smells of mould.
This insurer does not dispute this and offered to waive the policy excess and pay $1,000 non-financial loss compensation.
The complainant’s treating doctor’s letter dated 19 March 2025 states:
I am writing regading regarding above mentioned patient who is on antifungal treatment for Aspergilosis Mould infection in her lung. I advise her to evacuate the house immidiately. I would appreciate your understanding and consideration regarding her situation (sic)
The insurer’s unreasonable claims handling included delays and refusing to consider the compelling evidence from AL’s experts. This caused severe stress and frustration to the complainant.
The complainant remained at the property while its condition deteriorated with ongoing moisture ingress and mould contamination. The complainant is vulnerable and on a disability pension after sustaining permanent multiple spinal injuries. Her home is her only investment. The insurer failed to take any timely action to provide a suitable temporary accommodation to the complainant.
The panel acknowledges the insurer waived the policy excess of $2,000. However, the panel accepts the insurer did not handle the claim appropriately and this caused a severe and unusual extent of stress, delay and inconvenience to the complainant.
Given the above, it is fair in all the circumstances the insurer pays $6,300 non-financial loss compensation to the complainant.
2.3 Should the insurer pay indirect financial loss compensation?
Yes. The complainant is currently undergoing treatment for a lung condition caused by contamination and spread of mould at the property. It is fair the insurer reimburses the complainant for the medical expenses incurred directly relating to this condition.
Indirect financial loss compensation
Under the AFCA Rules, AFCA can award compensation for indirect financial loss.
Many insurance policies exclude cover for indirect loss. If this is the case, AFCA will not award this type of compensation for loss caused by the event giving rise to the claim. However, if the complainant suffered an additional loss because the insurer mishandled the claim, AFCA may require the insurer to compensate the complainant for the additional loss.
AFCA may reduce the amount of compensation it awards if the loss was partially caused by the complainant’s own actions, or by factors outside the insurer’s control.
Insurer’s offer to reimburse the complainant’s medical expenses is fair
The complainant presented several invoices for specialist consultation and tests performed in diagnosing and treating her lung condition. She is required to seek regular review and treatment for the condition in the near future.
It is fair the insurer agreed to reimburse the complainant’s medical expenses incurred. Given the insurer’s actions contributed to the complainant’s deterioration in health, it is fair the insurer reimburses the complainant for reasonable and necessary ongoing medical review and treatment directly related to her lung condition, up to the total of $6,300. The insurer is not required to pay more than $6,300 because:
· the panel considers this is an indirect financial loss because it is not a loss that most people insured under this type of policy would likely suffer, and
· AFCA has a compensation cap of $6,300 for this type of loss.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive insurance experience
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.