Home / QBE / Determination 12-25-192640
Determination 12-25-192640
Insurer declined additional items outside settlement and not covered; complainant also sought further non-financial loss compensation
Summary
The complainant sought further payments for additional items, loss of rent, expenses and non-financial loss after a burst pipe claim and a signed settlement. AFCA found the settled items were final, the other items were not covered, and the $2,000 already paid was reasonable.
AFCA would not disturb the binding settlement, and expert evidence showed the remaining items were pre-existing or maintenance-related and excluded under the policy.
Issues
- Claim denial primary · not upheld“insurer has reasonably declined further items that were outside the scope of the insured event or otherwise not covered by the policy”
- Poor claim handling secondary · not upheld“changed assessors multiple times and made repeated requests for further inspections; $2,000 already paid considered reasonable”
- Delay secondary · not upheld“significant portion of the delays arose because many of the issues raised by the complainant were not related to the burst pipe”
Subjects and remedies
home or building damageno remedy
Related
Text of the determination
Determination
|
Case number
|
12-25-192640
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-25-192640 6 February 2026
1 Determination overview
1.1 Complaint
The complainant jointly owns a home unit, which is insured under a strata policy underwritten by the financial firm (insurer) and held by the body corporate. In March 2024, a claim was lodged under the policy for damage caused by a burst pipe, which resulted in significant water and mould damage throughout the complainant’s unit. The insurer accepted the claim, arranged demolition and restoration works, and made a number of loss of rent payments under the policy.
During the claim, the complainant raised a number of other issues. A settlement was ultimately reached between the insurer and the complainant and her husband, including building repairs, ceilings, contents, and a loss of rent component.
The complainant seeks further amounts for additional loss of rent payments, repairs, reimbursement of travel and accommodation expenses, and non-financial loss compensation for stress, inconvenience, and delays in the insurer’s handling of the claim.
1.2 Issues and key findings
Is the insurer required to pay more of the claim?
No. For the items within the scope of the settlement agreement, including final payments for building repairs, ceilings, contents, and loss of rent, the complainant has already agreed with the insurer that those items were fully resolved as part of the negotiated settlement.
For the claimed items that were outside the scope of the settlement agreement, I am satisfied that the insurer has shown that these other items are not covered by the claim because they were either pre‑existing, unrelated, or maintenance-related issues not covered by the policy.
Should the insurer pay non-financial loss compensation?
No. The insurer has already paid $2,000 in non‑financial loss compensation to the complainant, recognising the stress and inconvenience caused during the handling of the claim. I consider the amount paid reasonable in the circumstances.
Why is the outcome fair?
The outcome is fair because the insurer has reasonably declined further items that were outside the scope of the insured event or otherwise not covered by the policy. The insurer has also paid non-financial loss compensation to the complainant which was reasonable.
1.3 Determination
This determination is in favour of the insurer. It is not required to take any further action in relation to this complaint.
2 Reasons for determination
2.1 Is the insurer required to pay more of the claim?
No. For the items within the scope of the settlement agreement, including final payments for building repairs, ceilings, contents, and loss of rent, the complainant has already agreed with the insurer that those items were fully resolved as part of the negotiated settlement.
For the claimed items that were outside the scope of the settlement agreement, I am satisfied that the insurer has shown that these other items are not covered by the claim because they were either pre‑existing, unrelated, or maintenance-related issues not covered by the policy.
Circumstances of the claim
The complainant, together with her husband, owns a home unit within a strata complex. Their unit, as part of the strata complex, is insured under a strata building insurance policy issued to the strata body corporate and underwritten by the insurer. The policy is administered by an underwriting agent and claims manager acting on behalf of the insurer. For ease of reference, the policy administrator and the insurer will together be referred to as ‘the insurer’ throughout this determination, unless otherwise specified.
On 1 March 2024, a burst copper pipe within the complainant’s unit caused water to escape into the upper‑level ensuite and lower‑level kitchen, resulting in significant water and mould damage to ceilings, wall linings, flooring, cabinetry, and internal fixtures. There is no dispute that this insured event occurred or that it caused damage to the complainant’s unit requiring repair.
The complainant lodged a claim for the damage shortly after the incident. The insurer accepted the claim and arranged demolition, drying, mould remediation, and reinstatement works. The insurer also made a number of loss of rent payments while the property was uninhabitable.
During the claim remediation process, additional water ingress was discovered from separate, long‑standing roof defects unrelated to the burst pipe. These required investigation by the body corporate and contractors engaged to inspect the roof structure. The complainant also raised concerns about the extent of damage, delays, and the scope of repairs. The insurer engaged various experts to review the cause and extent of the damage. Their reports concluded that some items, such as the kitchen and living area tiles, were related to the burst pipe claim, while other issues, including balcony tiles, laundry tiles, and window moisture damage, were pre‑existing or maintenance‑related and were not accepted as being related to the claim.
A settlement was later agreed between the insurer and the complainant and her husband, covering building repairs, fire‑rated ceiling replacement, contents losses (paid on a goodwill basis), and a loss of rent component. This was documented in a formal settlement agreement.
Following this agreement, the complainant has continued to raise concerns with the insurer about additional items and her ongoing dissatisfaction with aspects of the repair process and settlement. The current status of these items is as follows:
· the insurer concluded that the issues raised by the complainant about the balcony tiles, laundry tiles, additional wall and ceiling defects, and window moisture damage were not covered under the claim because they were pre‑existing and/or not caused by the burst pipe and water leakage,
· the insurer said that ongoing roof leaks and water ingress were due to long‑standing building defects (also noting the age of the building, of around 35 years), not the burst pipe, and should therefore be managed by the body corporate,
· the insurer denied additional claims for minor scuffing, dents, and cosmetic marks identified during or after reinstatement on the basis that these were historic or unrelated to the claim,
· the insurer has not accepted items the complainant considered outstanding or inadequate, such as specific painting in areas, cabinetry details, and flooring concerns, because these were either already included in the agreed scope or required evidence or quotes for reimbursement, which the insurer says have not been provided, and
· the complainant remains concerned with aspects of the settlement, stating that she remains dissatisfied and believes the settlement did not fully cover the costs she has incurred.
Settlement agreement was executed
The complainant, her husband and the insurer entered into a formal settlement agreement on 14 April 2025 that stated that it resolved all matters arising from the burst pipe.
The agreement included payments made by the insurer to the complainant and her husband for building repairs, fire‑rated ceiling works, contents items (paid on a goodwill basis), and a loss of rent component. It also stated that these payments were made in full and final settlement of the claim.
The settlement agreement also included a clause confirming that it was final and binding on both parties, preventing either party from bringing further claims or seeking additional entitlements relating to the same insured event.
AFCA cannot overturn a settlement agreement
It is not AFCA’s role to overturn, amend, or set aside a concluded settlement agreement, nor can AFCA add terms to or reopen matters that the parties have already agreed to resolve. Once parties freely enter into a binding settlement, AFCA cannot disturb its finality unless there is evidence of duress, unconscionable conduct, or similar grounds, which has not been alleged or established here.
As such, the matters considered in this determination are limited to those additional items that were not within the scope of the settlement agreement, being:
· balcony tiles, laundry tiles, additional wall and ceiling defects, and window moisture damage,
· ongoing roof leaks and water ingress,
· minor scuffing, dents, and cosmetic marks, and
· specific painting areas, cabinetry details, and flooring concerns.
Complainant has onus to establish a claimable loss
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a claimable loss.
Whilst there is no dispute that the insured event (the burst pipe) occurred, the onus is on the complainant to show that the proximate cause of damage to the additional items was the insured event. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
If the complainant is able to establish this, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Policy Schedule. There has been no concern raised that the insurer failed to provide the policy documents to the body corporate, which is the policyholder. It follows the insurer is entitled to rely upon the contents of the documents.
The PDS (at page 19) states that the policy covers damage to the insured property, which includes the building. ‘Damage’ is defined at page 11 as:
any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy.
Exclusions under the policy include (at page 22 of the PDS):
lack of maintenance, rust, oxidation, corrosion, mould, mildew, Wear and Tear, fading, concrete or brick cancer, developing flaws, wet or dry rot, gradual corrosion or gradual deterioration or, failure to maintain Your Insured Property in a reasonably good state of repair. This includes when the damage to the Insured Property is caused by light, air, sand, the climate (which includes wind or rain) or the passage of time.
Satisfied that additional items claimed are not covered
Based on the exchanged material, on balance, I am satisfied that the additional items being claimed by the complainant are not covered under the policy.
The information provided by the insurer is persuasive in showing why the claimed damage to these additional items was not caused by the burst pipe. It appointed various experts, including:
· building consultant and engineer, CR, which conducted two onsite assessments of the property (one with a rope-access specialist, LU, to inspect the roof),
· property services group, OA, which attended the property multiple times to conduct moisture inspections, mould assessments, and drying process reviews, and
· builder CS, which conducted leak detection testing, inspections of the cabinetry, and liaised with other experts regarding structural and water ingress issues.
The outcome of the expert reviews, in relation to each of the additional items, is as follows:
· CR’s assessment of the balcony tiles showed that the damage to them was pre-existing and unrelated to the burst pipe, noting adhesive failures over time and the lack of expansion joints in the original 1989 tiling installation. Most persuasively, there was no water migration from the burst pipe to the balcony, nor was it subject to the same slow moisture migration that impacted on the other tiles (such as the kitchen, living and under-stairs areas) that were accepted in the claim. This is also supported by the findings of OA, which attended the property to conduct mould remediation and inspections, and did not find that the balcony tiles had been impacted by the burst pipe.
· CR’s assessment of the laundry tiles also showed that there was no water migration from the burst pipe to the laundry area, noting that they also sat on a raised topping compound. CR found that there was historical delamination of the topping compound which was the cause of the damage to them. OA’s report also indicates that the laundry was not impacted by the burst pipe, with no elevated moisture detected.
· in relation to the additional wall and ceiling defects, CR identified historical corrosion, long‑term water ingress, and prior poor workmanship, noting that the severity of deterioration indicated years of ongoing issues, not a sudden burst‑pipe event.
· CR and OA both found that the moisture staining and deterioration around the bedroom windows was caused by long‑standing window and building envelope defects, not the burst pipe. This was linked to ongoing leaks from external sources and deterioration, falling under body‑corporate maintenance rather than insured damage. CS also did not consider this part of the claimed event.
· CR, CS and OA all said that the ongoing roof leaks and water ingress were the result of long‑standing building defects and not the burst pipe. CR also specifically explained why these issues were not related to a sudden or isolated burst‑pipe event. These findings were supported by a supplementary roof inspection, undertaken with a rope‑access specialist, LU, who confirmed multiple points of roof‑sheet deterioration, capillary ingress at sheet laps, corrosion beneath screw fixings, and historical water pathways into the ceiling cavity. The location, direction and spread of moisture were consistent with external weather‑related ingress rather than the burst pipe.
· the assessment of the minor scuffing, dents and cosmetic marks showed that the vast majority of these were historical, pre‑existing, or unrelated to the burst pipe. CR observed numerous prior patch repairs, historical dents in plasterboard, long‑standing paint imperfections, and aged damage to cornices and linings, none of which aligned with the timing or nature of damage expected from a sudden escape of liquid
· the issues raised by the complainant in relation to the specific painting areas, cabinetry details, and flooring concerns are also not supported by information from any of CR, CS or OA that these were caused by the burst pipe or poor workmanship following the rectification work.
The complainant has not provided any technical information, expert report, or independent review contradicting any of these assessments about the cause of the claimed damage to these items. Whilst the complainant has made assertions and provided her opinion, this does not provide a sufficient basis for me to place less weight on the insurer’s expert material, which is supported by detailed on‑site inspections and professional analyses undertaken by qualified building consultants.
I am therefore satisfied that the insurer is not required to take any further action in relation to the claim.
2.2 Should the insurer pay non-financial loss compensation?
No. The insurer has already paid $2,000 to the complainant in non‑financial loss compensation, recognising the stress and inconvenience caused during the handling of the claim. I consider the amount paid reasonable in the circumstances.
AFCA can award compensation for non-financial loss
Under its rules, AFCA may award non-financial loss compensation (capped at $6,300) in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
Compensation for non-financial loss is not awarded by AFCA when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
Compensation is not warranted in the circumstances
The complainant says the insurer’s actions throughout the course of the claim have caused her inconvenience and distress. She also says the insurer caused unreasonable delays and failed to manage the claim effectively. In particular, she says that:
· the insurer changed assessors multiple times and made repeated requests for further inspections, which she found disruptive and unnecessary,
· the extent of delays, including ongoing investigations into pre‑existing defects and additional leaks, caused her frustration and uncertainty,
· she experienced stress because important items, such as flooring, tiling and cabinetry issues, were not promptly or properly addressed, and
· the handling of repeated roof leaks and associated investigations contributed to ongoing inconvenience.
The insurer has already paid the complainant $2,000 in non‑financial loss compensation to acknowledge the inconvenience she experienced during the claim process.
I am satisfied this payment was fair and reasonable in the circumstances, particularly given the complexity of the claim. I note that a significant portion of the delays arose because many of the issues raised by the complainant were not related to the burst pipe. It was reasonable for the insurer to rely on qualified experts (including CR, OA and CS) to determine whether these items formed part of the claimable loss.
Accordingly, I consider the $2,000 already paid by the insurer is appropriate compensation for the inconvenience associated with the claim process. No further non‑financial loss compensation is warranted in the circumstances.
2.3 Why is the outcome fair?
The outcome is fair because the insurer has reasonably declined further items that were outside the scope of the insured event or otherwise not covered by the policy. The insurer has also paid non-financial loss compensation to the complainant which was reasonable.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.