Partial decline of flood damage claim for houseboat decking on grounds of deterioration and wear and tear, and dispute over settlement of handrail and engine damage
Text of the determination
Determination
|
Case number
|
12-25-187896
|
Financial firm
|
Club Marine Limited
Case number: 12-25-187896 13 March 2026
1 Determination overview
1.1 Complaint
The complainants held a pleasure craft insurance policy with the financial firm (insurer) covering a houseboat moored on the Murray River at Mildura. During the October-December 2022 Murray River floods, the complainants say the vessel was subject to water over the deck, pressure against trees, and impact from submerged debris.
The complainants claimed for damage to the plywood decking, handrails and engine components (gearbox, swivel shaft and steering bracket). The insurer declined the decking claim on the basis of deterioration and wear and tear. It accepted the handrail damage but offered only the cost of straightening.
The complainants dispute the partial decline and the insurer’s settlement of the accepted damage. They also seek compensation for claims mismanagement.
1.2 Issues and key findings
Is the claim for damage to the decking covered?
Yes. The complainants have established a claim for accidental damage. The insurer has not discharged its onus to prove that deterioration or wear and tear was the dominant cause of the deck damage.
What is the reasonable cost of covered repairs?
APG’s most recent quote is a reasonable starting place for determining liability. However, I accept the insurer’s evidence that replacement of handrails is not required. The complainants are to obtain a fresh quote from APG for deck repairs, but excluding handrail replacement. The insurer should settle based on this quote plus its handrail straightening labour estimate.
Are the complainants entitled to compensation for claims handling?
No. The delays were largely due to the complexity of the claim and necessary assessments.
Why is the outcome fair?
The policy promises broad accidental damage cover, and responds to the claim for disputed damage. The insurer’s evidence is insufficient to exclude liability.
Regarding quantum, the determination accounts for the uncertainties in the evidence by requiring the insurer to settle based on a fresh quote with an adjustment for the handrail.
1.3 Determination
The determination is mostly in favour of the complainants.
If the complainants accept this determination, the insurer must settle the claim as outlined in section 2.2 below.
2 Reasons for determination
2.1 Is the claim for damage to the decking covered?
Yes. The complainants have established a claim for accidental damage. The insurer has not discharged its onus to prove that deterioration or wear and tear was the dominant cause of the deck damage.
Policy covers accidental damage
The policy covers the complainants’ houseboat for accidental loss or damage, which the policy defines as loss or damage that was unforeseen and unintended by the insured.
Relevant to this complaint, the policy excludes loss or damage caused by:
· delamination, deterioration, corrosion, or electrolysis
· wear and tear.
The complainants say the flood event caused engine damage and decking and handrail damage.
Engine and handrail damage not in dispute
The insurer does not dispute the flood caused limited damage to the handrails. The complainants say the handrails were in good condition before the flood, having been recently repaired by BB. The insurer has not disputed this.
Regarding engine damage, the parties disagree about causation but the insurer has accepted the engine damage is accidental. The insurer has also agreed not to charge a separate excess. Therefore, I do not need to determine the causation dispute. The insurer is to settle the engine damage based on the current SM quotes (quotes 896 and 897), without the application for a separate excess.
The key dispute on liability concerns the decking.
Complainants have a valid claim for accidental damage to decking
This is a broad-form accidental damage policy. The complainants must show, on the balance of probabilities, that the vessel suffered accidental loss or damage during the policy period. If a valid claim is established, the onus shifts to the insurer to prove an exclusion applies.
I am satisfied the complainants have established a valid claim. The complainants’ account is that the houseboat was moored during the floods, was inaccessible for about 9 weeks, and was subject to water on deck, pressure against trees, and debris impact. The insurer has not persuasively undermined the credibility of this account.
The surrounding evidence is consistent with the account. I note:
· the Murray River flooding is well documented and the damage appears to have manifested soon after the incident
· in his first report of 6 March 2023, the insurer’s assessor HM acknowledged the vessel appeared to have been damaged by impact during the flood
· HM accepted the handrail damage was plausibly caused by the vessel yawing into obstructions as mooring lines tightened and relaxed with the water level
· the complainants reported that the vessel would not track straight shortly after the flood
· a marine mechanic, BW, provided a statutory declaration that gearbox and steering bracket damage was more likely than not caused by impact with a submerged object. HM disputes this but he did not physically inspect the components and his reasoning is largely speculative
· HM acknowledged damage to the hull perimeter bumper rubber, and a small fracture to the outboard skeg directly below the propeller.
This establishes not only accidental damage to decking, but that the flood is a plausible cause. The onus shifts to the insurer to prove an exclusion applies to the decking.
The insurer relies mostly on HM’s opinion that the plywood decking damage is consistent with deterioration and delamination from extended exposure.
Deck was about 12 months old, installation not shown to be defective
Maintenance records do not show the boat was neglected and the complainants say the boat was fine before the incident.
More significantly, the complainants provided a letter from a builder, NA, confirming that new plywood decking was installed in October 2021. This was about 12 months before the flood. The letter says the work was done by a qualified tradesman experienced in houseboat fitting. The insurer has not established that this letter is not credible or that the installation did not occur. It seems unlikely that a relatively new deck would degrade from natural causes so rapidly.
HM suggests the deck work was defective as the ply likely lacked a protective sheath. The insurer relies on HM’s view that no professionally built houseboat would have plywood laid externally without fibreglass or cloth sheathing. HM describes this as the “standard” based on his 38 years of experience, though he accepts there are no written standards for houseboat deck construction.
I give this opinion limited weight. This is because:
· the view about the absence of sheathing does not appear in HM’s primary inspection reports. It was offered after further discussions with the insurer, based on photographs rather than an invasive inspection of the plywood
· HM accepted that plywood comes in various grades with different moisture resistance, and that without a more invasive inspection he could not determine the grade used
· neither HM nor any other assessor conducted a physical inspection or material test confirming that the plywood decking lacked sheathing or a protective layer. HM’s statements rely on an inference drawn from appearance in photographs and general expectations about marine construction, not on direct verification.
HM’s causal analysis is insufficient
HM concluded in his July 2023 report that the decking damage was consistent with deterioration and the flood “appears not to have contributed.” In his June 2024 report, he added that damage was mostly in areas exposed to the elements and the vessel’s design meant it would rise and fall with the water level.
I do not consider HM’s evidence sufficient to support the insurer’s position. First, this is because HM’s reasoning is largely conclusory. He states the damage is consistent with deterioration but does not explore with analytical rigor how the flood’s forces could have (or could not have) caused the deck deformation and splitting.
HM acknowledges an invasive inspection is needed to determine the plywood grade, including its moisture resistance. This is a factual gap in his causal analysis.
HM notes the damage is concentrated in areas exposed to weather. But those same areas are also the most exposed to water flows, debris and physical stress during a flood. HM does not consider this alternative explanation.
I accept BB, the repairer who slipped the vessel, found no structural damage to the hull or steel structure. HM relies on BB’s findings to suggest impact is not a plausible mechanism of damage. He says, in essence, that if a force damaged the decking, one would also expect damage to the structure or hull. He also notes the bow fendering and stepped-down platforms would absorb impact forces before they reached the main deck.
I acknowledge this is the strongest aspect of HM’s analysis. It is unclear why it does not appear in his formal reports but is instead produced in a supplementary email. In any event, I do not consider it determinative. The complainants’ causal account is broader than a forceful impact alone. As noted, they say the boat was wedged against trees in strong current, exposed to water, impacted by debris, and subject to physical strain over 9 weeks. These are various causal forces, not just one type of impact. Plywood is more vulnerable than steel to sustained flexing, water ingress and loading over weeks. HM does not consider how the materials might respond to the same forces in different ways.
Further, I note BB’s inspection was focused on structural hull integrity, not a forensic examination of every deck fastening point.
In addition, the fendering point is relevant to bow impacts but does not address the full damage pattern. The damage is not just confined to the bow area.
Finally, HM relies on the absence of internal flooding to argue water did not reach the deck. He notes the vessel has substantial freeboard and no internal water damage was reported. This is relevant but not conclusive. It is plausible that water reached the deck intermittently during the 9-week period without overtopping to the point of causing internal flooding. The insurer has not provided evidence, such as precise water level data against the vessel’s deck height, to rule this out.
HM’s analysis does not rule out flood as a likely cause or show deterioration was the dominant one.
Unsheathed plywood may have been more vulnerable
The insurer argues that the absence of sheathing left the plywood vulnerable to accelerated deterioration from weather exposure.
Even accepting this, the same point can be used to undermine the insurer’s position. Unsheathed plywood exposed to prolonged floodwater contact, physical force and debris impact over 9 weeks could deteriorate faster because it lacked a protective layer. The insurer’s evidence about the absence of sheathing does not rule out the flood as a significant cause. If anything, it may explain why the flood caused more severe damage to this deck than it might have to a properly sheathed one.
Insurer has not established exclusions
The context of my causation analysis is the broad-form nature of this accidental damage cover and the insurer’s onus to prove the policy exclusions. Weighing all the evidence, I am not satisfied the insurer has shown that deterioration or any other of the excluded factors was the dominant cause of the deck damage.
Deterioration may well have played a role in forming the observed damage. But this is not enough to make the insurer’s case.
I also acknowledge the precise mechanism by which flood could cause all the damage is not entirely clear. But it is not the complainant’s responsibility to establish this.
The deck was only about 12 months old. The houseboat endured a significant and prolonged flood event. The complainants’ account of the damage mechanism is plausible and is consistent with the surrounding evidence, including the accepted handrail damage, bumper and the engine damage. HM’s analysis does not adequately explore or rule out the flood as a cause.
For these reasons, the insurer must cover the flood damage to the decking.
2.2 What is the reasonable cost of covered repairs?
APG’s most recent quote is a reasonable starting place for determining liability. However, I accept the insurer’s evidence that replacement of handrails is not required. The complainants are to obtain a fresh quote from APG for deck repairs, but excluding handrail replacement. The insurer should settle based on this quote plus its handrail straightening labour estimate.
Handrails: straightening is an adequate repair method
There is no dispute that the handrails suffered damage during the flood. HM accepted this was plausible. The dispute is about the repair method and cost.
The complainants seek full replacement of all handrails, partly on the basis that partial repairs would leave a visually inconsistent result. The policy provides that the reasonable cost of repairs will not include extra costs purely to create a uniform appearance to match undamaged portions of the vessel. The insurer is entitled to rely on this.
HM concluded the deformation was minor, with no major kinks or indentations, and that the steel rails could be satisfactorily straightened. He initially allowed $3,000 for in-situ straightening, based on a discussion with an unnamed alternate repairer.
The complainants say multiple local repairers confirmed the rails cannot be repaired in situ. The complainants obtained quotes for full replacement: $14,357.90 for supply and install from APG (plus removal costs) and $18,590 from EK.
The insurer later accepted that dry docking is necessary and increased its offer to include slipping and one week of hardstand.
HM is the only expert who has opined in writing, based on a physical inspection, that straightening is adequate. The complainants have not provided a written report from an expert contradicting this. On this basis, I accept HM’s view that the observed deformation was minor and that straightening is sufficient to restore the handrails to their pre-loss condition. Full replacement goes beyond what is necessary for the damage described.
Insurer to settle based on fresh APG quote, with handrail adjustment
The parties have proceeded on the basis that the claim should be cash settled.
The only detailed, actionable quote for the deck work is from APG, as updated on 23 July 2025. The insurer declined the deck claim entirely and did not obtain an alternative quote. I accept the APG quote as a reasonable starting point for determining liability.
Regarding the handrail component, as noted, I accept straightening is an adequate repair method. In addition, HM’s estimate for labour appears broadly reasonable. Because the vessel will be dry docked for the deck repairs, the dry dock costs should not be duplicated. The handrail straightening can occur during the same dry dock period.
The complainants are to obtain a fresh quote from APG for the deck repair scope, including slipping, dry dock, and all associated works, but excluding handrail replacement.
Once this quote is obtained then, within 14 days, the insurer is to cash settle the APG quote plus $3,000 for handrail straightening, plus a 10% uplift on the total. The uplift is to account for the transfer of risk to the complainants.
The insurer may deduct the policy excess of $1,000, to the extent it has not already been applied.
No interest is to be paid on the deck and handrail amount as the quote will be current. However, the insurer is to pay statutory interest on any unpaid amounts for engine damage from 7 July 2024 until the date of payment.
2.3 Are the complainants entitled to compensation for claims handling?
No. The delays were largely attributable to the complexity of the claim and necessary assessments.
No compensation for claims handling is warranted
The claim has been ongoing since early 2023. I accept this has caused the complainants stress and frustration. The claim involved multiple components, competing views on causation and the need for the vessel to be slipped. Three assessor reports were commissioned as new evidence emerged. The insurer increased its offer over time.
The complainants’ submissions do not provide compelling evidence of claims mismanagement. While the process has been lengthy, I am not satisfied the insurer handled the claim unreasonably in terms of the timeline. The delays were largely attributable to the complexity of the claim and the time needed for proper assessment. I do not award compensation for claims handling.
2.4 Why is the outcome fair?
The policy promises broad accidental damage cover, and responds to the claim for disputed damage. The insurer’s evidence is insufficient to exclude liability.
Regarding quantum, the determination accounts for the uncertainties in the evidence by requiring the insurer to settle based on a fresh quote with an adjustment for the handrail.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.