Insurer denied storm-related structural damage to upper level as excluded (deterioration, defects); also delays and temporary accommodation beyond policy limit

FirmAllianz Australia
Decided2025-08-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$6,300
Amount claimed$428,340
SourceAFCA PDF

Summary

Insurer accepted a storm claim but later denied upper-level structural damage as gradual deterioration or defects. AFCA found the damage storm-related, ordered a cash settlement based on averaged quotes plus 15%, further temporary accommodation costs, and $6,300 non-financial loss.

The complainant showed a claimable storm loss, the insurer failed to prove the exclusions, and its claim handling delays exhausted the TA limit and warranted compensation.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterthird party authoritypay claimpay compensationpay interestpay non financial lossreassess claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-186973 | Financial firm | Allianz Australia Insurance Limited Case number: 12-25-186973 21 July 2025 Determination overview Complaint The complainant held home building insurance with the financial firm (insurer). On 30 January 2024, he lodged a claim for damage to his home from a severe storm on 25 December 2023. The insurer accepted the claim and started repairs. However, it later denied that the structural damage to the home’s upper level (disputed damage) was storm related. It says that damage was from excluded causes, including gradual deterioration, defects and maintenance issues. The complainant maintains the disputed damage was caused by the storm. He seeks a cash settlement based on his builder’s quote, temporary accommodation (TA) costs beyond the policy limit to cover the repair period, and compensation for stress and inconvenience. Issues and key findings Is the insurer entitled to deny the disputed damage? No. The complainant has shown a claimable loss for the disputed damage and the insurer has not established the exclusions it relies on apply. Each party is to obtain a repair quote from a builder not previously involved, based on a scope of works (SOW) from engineer CR. The insurer is to pay the average of the quotes plus a 15% uplift. Is the insurer to pay for more TA outside the policy terms? Yes. The insurer significantly contributed to the delays experienced, meaning the TA policy limit has been exhausted. The insurer is to pay for TA until the repair quotes are obtained. The quoting builders are to estimate how long the repairs will take. The insurer is then to cash settle the future TA aspect based on the average of the estimated time frames plus 15%. Is non-financial loss compensation payable? Yes. The insurer materially contributed to the delays experienced and should have better handled the claim. The complainant is elderly and vulnerable, and the insurer unreasonably caused him major stress and inconvenience. The insurer is to pay the complainant $6,300. Why is the outcome fair? The outcome is fair because it has been shown the disputed damage is covered under the policy terms. Given the issues with the insurer’s claim handling, including delays, it is also fair that the insurer pays for additional TA and pays non-financial loss compensation. Determination This determination is substantially in favour of the complainant. On the complainant providing written notice that he accepts this determination, the insurer is to: cash settle the cost to repair the disputed damage in accordance with section 2.1 below pay further TA costs in accordance with section 2.2 below within 14 days of receiving the notice, pay the $6,300 in non-financial loss compensation. Reasons for determination The complainant is represented by family member D. For brevity’s sake, the complainant and D will be referred to below as ‘the complainant’ unless context requires otherwise. Is the insurer entitled to deny the disputed damage? No. The complainant has shown a claimable loss for the disputed damage and the insurer has not established the exclusions it relies on apply. Each party is to obtain a repair quote from a builder not previously involved, based on a scope of works (SOW) from engineer CR. The insurer is to pay the average of the quotes plus a 15% uplift. Complainant must show a claimable loss under the policy terms ​​The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a loss claimable under the policy. This means he must show the loss was caused by a risk for which he is insured. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. ​​Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainant for loss or damage to his home caused by a listed insured event. Those events include ‘Storm, cyclone, rainwater or run-off’. The home building sum insured is $500,000, and the policy excess is $500. ​On 30 January 2024, the complainant notified the insurer that his home had been extensively damaged during a storm on 25 December 2023 that had involved very high winds. He said the damage included structural movement of the upper level, blown in a sliding door, blown out windows, water ingress damage, and fencing damage from toppled trees. The insurer initially accepted the claim and authorised repairs, which were partially completed. However, following receipt of additional expert commentary, the insurer revised its position. It concluded that the disputed damage was not from the storm but was the result of excluded causes. ​​Insurer denied the disputed damage The insurer’s appointed builder MK inspected the home on 2 February 2024. Relevant to the disputed damage, MK said that: the upper level’s back wall had shifted about 30mm out of place, with a gap to the cornices concrete roof tiles had been moved during the storm, resulting in gaps the damage was caused by strong winds and heavy rain during the storm the damage was unrelated to any defects or maintenance issues. The insurer also obtained a report dated 13 February 2024 from roofer SC. According to SC, the roof was in average condition, but the storm had moved multiple tiles and had damaged ridge capping. The roof structure appeared to have shifted during the storm, with an entire course of tiles out of position. On 9 February 2024, engineer ME inspected the home. Relevantly, ME told the insurer the minor distortions to the wall cladding and internal linings on the eastern end of the upper level, and the gap between the cornice and eastern wall lining, were due to the storm. The movement had resulted in cosmetic damage only and did not affect structural integrity. On 15 May 2024, ME reinspected the home. Noting the gaps between roof tiles as well as the indications of movement it previously observed, ME said there may have been some structural framing movement. That could be confirmed by removing linings and roof covering. After the upper level wall and ceiling linings were partially stripped out, engineer EC inspected the home on 24 October 2024. EC reported to the insurer that: the observed truss and roof tile movement was due to a failure of a timber post supporting the home’s deck. This pulled the deck roof down, bringing the connect rafter with it the post would have deteriorated gradually, and at the time of inspection the downward slope of the deck was noticeable. That and the addition of propping under the deck within the past 12 to 24 months indicated the complainant was aware of the deterioration the tie down rods for the upper level’s timber framing had loose nuts and in one case no nut at all. Had the tie down rods been properly installed and fastened, the movement damage would have been lessened it is not possible for nuts to be rattled loose if they were properly tightened. If they were not properly tightened, vibrations can cause a nut to rattle loose but typically only over time there was no evidence conclusively showing that the storm caused the observed movement observed truss and roof tile movement if the storm had caused the movement, it would have been spread across the entire area, instead of being isolated to the location directly in line with the post failure ‘Therefore, the movement noted to the upstairs living area has been attributed to long term deterioration of the structural components due to a lack of consistent home owner maintenance and poor installation techniques’. In reports dated 15 May 2025 and 25 June 2025, EC said: while the deviation of the truss and walls exceeded the applicable building standard, such movement is only deemed a defect if it compromises structural adequacy, allows water ingress, or poses a health and safety risk. There is no evidence those factors are present the movement to the east and west walls was due to localised forces. If the high winds had caused that movement, it would have also affected the other walls which had not moved the causes of the movement were as it had previously described while the local council had approved the frame in 1992, the inspection would have been a visual check rather than detailed testing and measurement of each element while the complainant contended wind speeds reached 204km/h, which could cause structural damage, that was not supported by the official readings available (the insurer refers to recordings of 150km/h and 106km/h by the Bureau of Meteorology (BOM)) if the roof had lifted from the tie down rods, that would damage the rods rather than loosened the nuts. Relying on EC’s reports, the insurer says the complainant has not established a claimable loss for the disputed damage under the Storm insured event. Rather, the disputed damage is from excluded causes because the PDS says on page 54 that there is no cover under the policy for loss or damage as a result of, caused by or arising from: gradual deterioration, wear and tear, or lack of maintenance structural defects or poor workmanship. The insurer has offered to pay the complainant $41,927.16 as a cash settlement for the damage it has accepted. That is the amount quoted on 7 February 2025 by builder AA. Complainant says insurer should accept the disputed damage The complainant’s engineer CR inspected the home on 25 June 2024. CR reported that: there was significant movement of upper level walls and structure, with cracking and gaps between walls and cornice. The eastern wall was 30mm out of plumb, the northern wall was 15mm out and the western wall had a 10mm bow there was movement and separation of roof tiles up to 15mm the northwestern corner external wall cladding had moved and separated by 9mm the damage was typical of that caused by an intense high wind event while the framing appeared structurally sound, it considered the upper level’s structural integrity had been compromised due to the short term high wind loads the framing was defective under the applicable building standard the structural adequacy of the wall and roof framing connections should be checked. After partial removal of the internal linings, CR reinspected the home on 29 November 2024. It reported that: the timber framing and connections appeared to be structurally sound, but the tie down rods should be tightened prior to straightening and relining the structure it agreed with EC on the condition of the deck and its roof. However, the deck movement would not have notably affected the upper level structure given the manner in which the deck and its roof was attached to the home if the deck roof movement had caused the roof framing movement, there would be similar wall and gable framing movement. Such movement was not present the wall movements and blown out door and windows had damaged the integrity of the home’s external envelope (cladding) which protects the structure from the elements due to the storm damage, all upper level cladding, flashings and seals needed to be replaced. The separated roof tiles should be removed, the framing checked and tiles replaced, fixed and sealed the deck and its roof were heavily deteriorated and required urgent maintenance. This was not due to the storm. The complainant has provided photos and a video of the significant damage caused by the storm to his home and to the local area. He has also provided photos showing areas with structural separation after the storm were undamaged before it. The complainant maintains that wind speeds reached 204km/h. He says the BOM data the insurer relies on was from weather stations more than 20km away. He notes his home is at the top of a ridge and was directly in the storm’s path. The wind was so strong that his bed was sucked out and found some distance away. The complainant was in the home during the storm and thought it would be destroyed. The upper level was lifting and rattling. He submits that it is likely the tie down bolts lifted due to the wind pressure but managed to stop the upper level blowing away. He notes the bolts were almost all an equal distance off the frame bottom and top plates. The complainant has obtained a quote dated 7 April 2025 totalling $428,340 from builder CA. He has also obtained a quote dated 14 April 2025 from builder SS totalling $457,600. The complainant seeks to be cash settled based on CA’s quote. Insurer is not entitled to deny the disputed damage Based on the exchanged information, the panel is satisfied that the complainant has shown a claimable loss for the disputed damage and the insurer has not established the exclusions it relies on apply. This is because: the storm on 25 December 2023 was a severe weather event involving very high winds it is clear from the complainant’s photos and video that the storm had a devastating impact on the home and the surrounding area photos provided by the complainant establish that upper level walls did not have structural separation before the storm but did immediately after it CR’s reports are well reasoned and logical, and its conclusions are generally supported by MK, SC, and ME in contrast, EC’s findings contradict those of the other experts without satisfactorily disproving the storm as the proximate cause of the damage in the circumstances, CR’s reports are more persuasive than EC’s, and the panel finds CR’s rebuttal of EC’s conclusions convincing. The panel is satisfied that it is reasonable that the damage claim is resolved through a cash settlement. ​​A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then typically applied to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. The panel is not satisfied that the quotes supplied by the parties can be relied upon to determine a fair cash settlement. AA’s quote does not allow for the disputed damage. CA’s quote contains limited detail and itemisation. SS’s quote is more detailed but includes items that may not be claim related – for example, work on the downstairs area. If the complainant accepts this determination, the following steps are to be taken: the complainant is to obtain from CR an SOW for repair of the claim related damage if CR charges for preparation of the SOW, the insurer is to pay that cost once CR’s SOW is available, the complainant is to provide a copy to the insurer the insurer and the complainant are each to obtain an actionable quote for the current retail cost of the claim related repairs based on CR’s SOW within 14 days of the quotes becoming available, subject to the sum insured and the policy excess, the insurer is to pay the complainant the average of the two quotes plus a 15% contingency uplift if the complainant has attended to any claim related repairs (as confirmed by CR in its SOW) and those repairs represent a permanent rather than temporary fix, on the complainant providing supporting invoices, the insurer is to reimburse the complainant the cost of the repairs and pay interest under section 57 of the Insurance Contracts Act, 1984 (Cth) on each invoiced amount from the date it was paid. The amount reimbursed, but not the interest, is to be deducted from the cash settlement. The panel accepts that in early 2025, the insurer offered to arrange a dual engineering assessment involving CR to resolve the dispute on causation. The complainant declined the offer. The insurer says in doing so the complainant acted unreasonably and caused delay. The panel is not satisfied the insurer’s position is correct. The insurer already had enough information to determine causation without a dual assessment. In addition, as discussed further below, by then the insurer’s delays and inconsistent claim handling had caused the complainant to lose faith in and mistrust it. Is the insurer to pay for more TA outside the policy terms? Yes. The insurer significantly contributed to the delays experienced, meaning the TA policy limit has been exhausted. The insurer is to pay for TA until the repair quotes are obtained. The quoting builders are to estimate how long the repairs will take. The insurer is then to cash settle the future TA aspect based on the average of the estimated time frames plus 15%. Insurer had paid TA costs beyond the policy limit The PDS says on page 28 that if the insured building is damaged by an insured event to the point where it cannot be lived in, the insurer will pay for TA for the period it reasonably takes to repair the damage. The maximum amount payable is 10% of the building sum insured (so, in this case, $50,000) and the maximum period of cover is 12 months. The insurer provided TA for the complainant and his wife until 14 June 2025, well beyond the maximum 12 month policy limit. Insurer is to pay for more TA outside the policy terms The panel is satisfied that the insurer has mishandled the claim process and unreasonably caused delays because: the claim has been ongoing for 18 months with no resolution the insurer initially approved repairs, later withdrew approval, and asked for further engineering review EC’s report contradicted the earlier findings of MK and MC, and caused confusion the insurer required the complainant to arrange his own engineer, then proposed a dual assessment after the claim had been on foot for 12 months the insurer’s documents confirm multiple site visits occurred, and that its SOW changes caused confusion and delay the insurer reversed an initially approved SOW which included structural rectification the insurer did not provide clear reasons for rejecting elements of the claim until well after the initial approval. Noting the relatively consistent conclusions of MK, SC, ME, and CR, the panel considers that by mid 2024, the insurer had enough information to correctly determine indemnity and to commence the true claim related repairs. The panel notes the only builder that has provided a repair timeframe is SS who suggested 20 weeks (five months). As SS appears to have included non-claim related repairs in its quote, it is likely the claim related repairs will take less than that period. This means that had the insurer handled the claim in a better and more efficient fashion, the claim related repairs would have been completed within the 12 month TA policy limit. It is therefore reasonable to require the insurer to continue to pay for TA until the repair quotes referred to in section 2.1 above are obtained. The quoting builders are also to be asked to estimate how long the repairs will take. The insurer is then to cash settle that additional future TA aspect within 14 days of the quotes becoming available based on the average of the estimated time frames plus 15%. Is non-financial loss compensation payable? Yes. The insurer materially contributed to the delays experienced and should have better handled the claim. The complainant is elderly and vulnerable, and the insurer unreasonably caused him major stress and inconvenience. The insurer is to pay the complainant $6,300. AFCA can award compensation for non-financial loss ​​​Under paragraph D.3.3 of its Rules, AFCA may award up to $6,300 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind. Insurer is required to pay non-financial loss compensation For the reasons set out in section 2.2, the panel is satisfied that the insurer materially contributed to the delays experienced and should have better handled the claim. The complainant and his wife are both in their 80s and vulnerable. They have multiple health issues and require regular in home aged and health care support. The fact that they have been out of their home and forced into TA for 18 months has complicated obtaining the support they rely on. The panel is satisfied that the insurer’s unreasonable claim handling and delays have caused the complainant major stress and inconvenience. This would have been compounded by observing the impact of the insurer’s conduct on his wife. The panel considers it fair to require the insurer to pay the complainant $6,300 in non-financial compensation. Why is the outcome fair? The outcome is fair because it has been shown the disputed damage is covered under the policy terms. Given the issues with the insurer’s claim handling, including delays, it is also fair that the insurer pays for additional TA and pays non-financial loss compensation. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: an ombudsman a member with significant experience in consumer and small business advocacy a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.