Home / Youi / Determination 12-25-186871

Determination 12-25-186871

Dispute over whether storm caused structural damage to a shed and whether full replacement is required

FirmYoui
Decided2026-07-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed storm damage to his shed and sought full replacement; the insurer covered impact damage but said structural issues were poor workmanship. AFCA found the storm did not cause the structural damage but required the insurer to repair the impact damage, install the roller door and pay $1,000 for non-financial loss.

The engineer's evidence showed misalignment from poor construction, which is excluded, but the insurer unreasonably withdrew the roller door replacement for storm damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossreassess claimrepair or rectify

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-186871 | Financial firm | Youi Pty Ltd Case number: 12-25-186871 14 April 2026 1 Determination overview 1.1 Complaint The complainant holds a buildings and contents insurance policy for his residential home which is underwritten by the financial firm (insurer). On 25 December 2023, there was a storm event at the insured property. He made a claim for storm damage to the property. The insurer accepted and covered some of the damage to the property. There is a dispute about the extent and cause of damage to a shed on the property. The complainant says that the shed has structural damage which was caused by the storm. The complainant seeks a full replacement of the shed. The insurer has said that it will cover repairs or replacement to areas of damage to the shed that were caused by the storm. The insurer says that the shed was poorly constructed and the storm was not the cause of any structural issues. In this determination I will use the word ‘storm’ to refer to the event. That is only because ‘storm’ is a defined term in the insurance policy. The complainant uses the term ‘tornado’. I acknowledge and understand that there was an extreme weather event on Christmas Day 2023. In this regard, from 23 December 2023, extreme weather and winds impacted parts of Queensland and NSW. On 27 December 2023, the Insurance Council of Australia (ICA) declared a ’significant event’ (Catastrophe 233) for certain regions impacted by storms particularly around the Gold Coast and Scenic Rim areas. 1.2 Issues and key findings Did the storm cause structural damage to the shed? The complainant has not established that the storm caused structural damage to the shed. Is the complainant entitled to compensation? Yes, AFCA can award compensation for non-financial loss (stress, inconvenience, and delay). The insurer has not installed the roller door and withdrew the offer. This was unreasonable and caused stress and inconvenience to the complainant. The insurer must pay $1,000 compensation for non-financial loss in respect of the roller door. Why is the outcome fair? The outcome is fair because the insurer has assessed the loss caused by the storm and offered to pay or settle for the losses caused by the storm. The insurer has met its obligations under the policy. Damage which is due to poor workmanship or faulty design is excluded from cover under the policy. It would not be a fair outcome if the insurer was required to pay for damage that is excluded from the policy. 1.3 Determination This determination is partially in favour of the complainant. The insurer is not required to replace the shed. If the complainant accepts this determination, then the insurer should settle the claim and complaint in the following way: · The insurer has 4 weeks from the date of receiving the complainant’s acceptance to seek an updated scope of works and costs. · The insurer is required to pay to have the areas of damage to the shed repaired or replaced (the impact/debris damage previously assessed and accepted by the insurer). · The complainant can choose either to have the insurer do the works or accept a revised cash settlement based on the updated costs. · In respect of the roller door, the insurer provided a replacement shed roller door. It has not been installed. · The insurer is required to install the roller door, including any works required, so that it is operational again. · The insurer is required to pay non-financial loss of $1,000 in respect of the roller door. 2 Reasons for determination 2.1 Did the storm cause structural damage to the shed? Complainant has raised several arguments Section 3 contains further background of the claim. The insurer relies on engineering reports from CR to support its position that the storm did not cause the structural damage to the shed. The complainant has produced an engineer’s report (NJ) which he relies on. The complainant has raised several arguments challenging the insurer’s position, including but not limited to the below issues: · Refutes the wind speed data relied on by the insurer. · Disputes the engineer’s reports and prefers the LM report and NJ report. · Says that the damage to the shed is consistent with wind/storm damage and that there is no evidence that the shed was poorly constructed or structurally unsound prior to the storm. · By accepting premiums and insuring the shed, the insurer accepted the shed’s construction was appropriate and it was insurable. · Says that, on the balance of probabilities, the damage was caused by the storm and the shed should be replaced. Having carefully considered these arguments along with all the exchanged information, I note the following. Wind speeds were likely much higher than 89km/hr The insurer has relied on BOM data from stations at Canungra (a defence station) and from Beaudesert. The BOM data shows that wind speeds were recorded at around 89km/h. The complainant says that these stations are 17-19km away from the insured property and too far away to be reliable. The complainant refers to other information showing that the wind speeds at sites much closer, such as Mount Tamborine, recording wind gusts at 160km/h. He refers to and relies on other sources such as ‘Higgins Storm Chasing’. The complainant has provided photos of damage to properties in the vicinity of the property, within 500m to 1km away. He says that the damage is consistent with wind speeds of 160km/h and up to 200km/h. Issues have also been raised between the parties with respect to elevations and locations. The complainant also produced a report from NJ addressing the storm and wind speeds. I accept the complainant’s submissions that the wind speed was likely much higher than 89km/h on the day. The insurer was entitled to rely on BOM data and to prefer that information over unofficial sources. However, there is sufficient evidence about the severity of the storm available from official sources; as noted above, the Insurance Council of Australia declared Cat 233 on 27 December 2023; Catastrophe 233: Christmas and New Year Storms - Insurance Council of Australia In view of the information about the storm event, the other damage sustained to the complainant’s property and the photos of damage nearby, I accept that this is consistent with wind gusts exceeding 89km/h. However, no exact measurement at the insured location is, or can be, available. Insurer can choose to rely on CR’s opinion The insurer instructed LM to assess the structural integrity of the shed after the storm event. LM is a roofing and construction company. LM reported that the shed sustained cosmetic damage from debris impact. They also reported that the shed frame had twisted and moved. They recommended different methods of repair. One option was to ‘re-skin’ the shed and try to straighten the frame. The other option was a full replacement for warranty purposes. The insurer instructed an engineer (CR) to inspect the shed. CR produced a report and also responded to the complainant’s responses. The complainant disputed the expertise of the engineer. The CR engineer was a civil engineer. The engineer was sufficiently qualified and experienced to report on the shed and give an opinion on structural damage. The report was peer reviewed by a senior structural engineer. The report and the subsequent reports are detailed and well-reasoned. LM is a shed builder and I acknowledge that they are experienced in their field. The insurer was entitled to seek a second opinion. The insurer is able to rely on the opinion from the engineer and to prefer a differently qualified expert. Accepting insurance premiums still allows insurer to rely on policy terms The complainant said the insurer accepted premiums and insured the shed for several years and must have accepted it was insurable. I do not accept this argument. This is because the payment and acceptance of a premium is not acceptance by an insurer about the condition or workmanship of insured property. The policy covers insured events. The insurer is entitled to consider whether or not a claim or loss arises from an insured event and to assess the event against the policy terms and conditions, including whether any exclusions are triggered. The storm did not cause the structural damage The issue in dispute comes down to a question of whether or not the storm caused structural damage to the shed. The complainant says that if the engineer did not properly investigate the available information about the weather and wind speed, then this calls into question the soundness of the conclusions about structural damage to the shed. The complainant says that the wind caused the shed to twist and lean and that it is structurally compromised. It was not built to withstand wind forces exceeding 144km/h. The complainant’s engineer, NJ also addressed wind speeds at the insured location. I accept that wind speeds at the insured location likely gusted in excess of the speeds recorded at Canungra and Beaudesert. However, it is not possible to determine the speeds or make any finding on the actual speed. The relevant issue is whether or not the storm caused structural damage to the shed. Considering all of the information exchanged between the parties, I am not persuaded the storm caused the structural damage. Based on the information to hand, there were issues with the workmanship and construction of the shed which caused it to be out of alignment. For example (but not a complete list), the photos and report showed that the ridge line of the shed, portal frames and rafters were out of alignment. The rafters were not secured centrally in the ridge frame. The purlins were of different lengths and certain areas not compliant with the code in force at the time. I have considered the NJ report. It refers to the CR report and the issues with the portal frame being off plumb. However, the NJ report does not adequately address the construction alignment issues such as the rafters and purlins. The NJ report does not offer an alternative explanation for these issues. Having considered the evidence, these are compelling factors supporting CR’s engineer’s opinion and I accept CR engineer’s opinion on this issue. It follows I am not persuaded the storm in question caused the structural damage to the shed. Roller door was damaged by the storm The complainant reported that the door worked before the storm (when he secured the property). It was bowed and making a screeching noise after the storm. The roller door issue was identified in the initial JL report in January and the subsequent JL variation report. JL said that the damage may have been caused by the wind on Christmas Day. Replacement was recommended. The roller door damage does not appear to have been addressed by CR. I have seen no evidence to show that the roller door was damaged by anything other than the storm. As such, the available evidence and information rests with the JL report. I accept the complainant’s evidence about the roller door. If the complainant accepts this determination, the insurer is required to have the door installed so that it is operating again. 2.2 Is the complainant entitled to compensation? Yes, AFCA can award compensation for non-financial loss (stress, inconvenience, and delay). The insurer has not installed the roller door and withdrew the offer. This was unreasonable and caused stress and inconvenience to the complainant. The insurer must pay $1,000 compensation for non-financial loss. Insurer has mostly handled the claim fairly The complainant has raised a number of points in response to the insurer. These were well-researched and thorough. The insurer has responded to these and has also sought further input from the engineer. The insurer has offered to settle areas of damage (mainly impact damage) which were said to be caused by the storm. The remediation offered by insurers has been fair and has been based on the information they were entitled to rely on. While it has taken some time from the storm on Christmas Day 2023, I do not consider that the time taken has been unreasonable. The complainant has had a fair opportunity to raise all of the points and the insurer has responded within reasonable time frames. There have been some changes of people handling the matter at the insurer and at JL which caused delay to the progress and frustration for the complainant. Overall, however, the claim has been handled reasonably and fairly. In respect of the roller door though, the insurer ordered a replacement roller door. There was an issue over storage and costs of the door. Later, the insurer said that the door was a ‘goodwill’ gesture and withdrew the roller door offer. The complainant said that the insurer had not properly dealt with this aspect of the claim. The complainant felt pressured and bullied over this issue. In the absence of any other evidence, it was not reasonable or fair to characterise this as a goodwill gesture. Further, in the absence of any other evidence or information, the threat of withdrawing the offer was not fair treatment. This has been delayed unreasonably, causing inconvenience and stress to the complainant. In the circumstances, it is fair to order non-financial loss of $1,000 in respect of the roller door. 2.3 Why is the outcome fair? The outcome is fair in all the circumstances because: · The insurer has relied on the available evidence with respect to the structural damage to the shed. · The complainant has responded and sought its own expert report. · All of the information has been exchanged and considered by the parties. · The insurer has settled, or offered to settle, the damage shown to be caused by the storm. It is entitled to rely on the evidence and the policy terms and conditions in settling the claim. Due consideration has been given to the issues in dispute and the AFCA approach has been objective and consistent with the facts and based on the law. 3 Supporting information 3.1 Background I have set out a summary of the background to this matter because the complainant has raised a range of different matters. In addition, this matter has taken some time to resolve and the delay since the event should be acknowledged. This is, however, only a summary of the main points and is not a complete, detailed history. The complainant’s home was in the path of a storm which impacted the region on Christmas Day 2023. On 27 December 2023, the complainant lodged a claim with his home insurer. The insurer instructed JL who attended site on 3 January 2024 and provided an assessment report on the damage. They considered that all damage was consistent with the storm that impacted the property. There were multiple areas of damage to the property, which the insurer cash settled. Those issues are not the subject of this complaint. With respect to the complainant’s shed, at the time of JL’s report, it was identified that the shed roller door was not operating correctly, barge capping was impacted and damaged and some wall sheets were impacted and damaged (by debris). At that point, no issues were raised or identified with structural issues to the shed. On around 8 July 2024, JL raised a variation report relating to the shed. The issue, in summary, was in relation to the roller door bowing. JL said the damage may have been caused by the wind on Christmas Day. Replacement was recommended. JL also engaged LM to report on the shed. LM provided a report dated 16 August 2024. They concluded that the shed frame had twisted and moved, the flashing, capping and roof sheets were bent and twisted. They said that the portal frame needed to be straightened or the shed re-built for warranty purposes. In view of the LM report, the insurer engaged an engineer to assess the shed. Their notes recorded that they had to engage an engineer to confirm the method of repair as a full replacement may be required and to determine if the damage was consistent with the event. The insurer instructed engineers, CR, to inspect the shed. On 2 October 2024, CR provided a causation report. CR reported, among other things, that: · The shed was leaning in and out at certain points. · The front frame leans slightly forward. · The purlins have different lengths by 80mm in some sections. · The shed ridge meanders along the shed length. · Roof sheets were raised or misalinged (saw toothing). · The barge capping was not fixed at 500mm spaces in accordance with the code. · The rafters were not centred in the portal frame. CR reported that there were indentations to various sheets, which were attributed to flying debris impact from the storm. The whirly bird was damaged, also due to storm debris impact. They recommended replacement of those sections of the shed which were damaged by the storm. As to the structure, CR said that the shed did not show deformation to the frame caused by the storm. The misalignment issues were due to poor construction methods and non-compliance with the building code in place at the time. In short, the shed was not built plumb in the first place. Between October and December 2024, the complainant complained about the report and the assessment and sent a comprehensive written response to the engineer’s report (29 November 2024). The complainant concluded that the structural damage was due to the extreme wind speeds which exceeded the building’s design threshold of 144km/h. BOM data from nearby stations supports the conclusion. The complainant sought full reconstruction of the shed. On 11 December 2024, CR provided a supplemental report to the complainant’s letter of 29 November 2024. CR addressed matters such as the qualifications or expertise of the engineers and wind speed data. CR concluded that the shed was misaligned due to its installation, not wind loading. There was no damage identified which was consistent with excessive shear force/wind load. In December 2024, the complaint was referred for internal dispute resolution by the insurer. That did not resolve the complaint. In January 2025, the complainant lodged a complaint with AFCA. The complaint did not resolve through conciliation or offers. There has been some delay and additional time incurred in reaching this determination. The delays were unfortunate but not undue. The most recent hiatus arose due to the complainant seeking his own expert engineering report. I acknowledge the difficulty of engaging an expert but overall, the delay has not been deliberate or of any parties’ making. 3.2 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.