Home / IAG / Determination 12-25-186195
Determination 12-25-186195
Whether insurer must pay cost of a full re-roof rather than replacing only hail-damaged tiles
Summary
The insurer accepted a hail damage claim but offered only to replace damaged roof tiles (about $17,247). AFCA found a full re-roof was the only actionable settlement and ordered payment of $146,811.60 plus interest, with no non-financial loss compensation.
Under the policy the cash settlement must be available to or actionable by the insured, and since no builder would do a tile-only repair, a full re-roof cost with a 20% risk-transfer allowance was fair.
Issues
- Claim amount dispute primary · upheld“The only fair way for the insurer to settle the claim is by paying the cost of a full re-roof.”
- Poor claim handling secondary · not upheld“Overall, the insurer's handling of the claim was reasonable.”
- Product terms interpretation secondary · upheld“Policy says cost must be 'available to or actionable by' the complainant; no repairer would do tile-only repair.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
Text of the determination
Determination
|
Case number
|
12-25-186195
|
Financial firm
|
Insurance Australia Limited
Case number: 12-25-186195 28 November 2025
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (the insurer). She lodged a claim for damage caused by a hailstorm. The insurer accepted the claim.
There were several disagreements about what items were damaged and what repairs were needed. Most of the disagreements have now been resolved. The complainant has accepted settlement payments from the insurer for most of the damaged items. However, the parties disagree about how much the insurer should pay for the roof.
The insurer has offered to pay the cost of replacing only the tiles that were damaged by hail. The complainant says the entire roof needs to be replaced. She wants the insurer to pay for a full re-roof.
1.2 Issues and key findings
Is the insurer required to pay for a full re-roof?
Yes. The insurer’s builder says it would be very difficult to find a roof tiler to repair the roof without doing a full re-roof, as such work is ‘simply not financially viable’. The only fair way for the insurer to settle the claim is by paying the cost of a full re-roof.
Why is the outcome fair?
The insurer’s builder provided a quote to replace the damaged tiles without replacing the whole roof. However, the insurer’s builder was not willing to perform the work, and said it was unlikely that any other builder would be willing to perform the work. If would not be fair to rely on this quote to settle the claim.
1.3 Determination
This determination is in favour of the complainant.
The insurer must pay $146,811.60, plus interest at the rate determined under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 25 June 2025, for the cost of replacing the main house roof.
2 Reasons for determination
2.1 Is the insurer required to pay for a full re-roof?
Yes. The insurer’s builder says it would be very difficult to find a roof tiler to repair the roof without doing a full re-roof, as such work is ‘simply not financially viable’. The only fair way for the insurer to settle the claim is by paying the cost of a full re-roof.
Insurer offered to pay for roof repair
On 25 December 2023, the insured property was damaged by a hailstorm. On 10 January 2024, the complainant lodged a claim for the damage.
The insurer’s experts inspected the roof and said there was hail damage to 300-500 tiles. The insurer has offered to pay the cost of a roof repair, including replacement of about 350 tiles. The insurer assessed this cost as $17,247.38 ($10,980 plus 10% GST, 19% builder’s margin, and 20% contingency uplift).
The complainant’s roofer said there was visible damage to 220-250 tiles, but removing these tiles may reveal more damage. The complainant says all tiles need to be replaced.
Policy requires settlement payment to be actionable
The policy terms are set out in the product disclosure statement. Relevant policy terms are quoted in section 3.2 of this determination.
The policy says the insurer can settle a claim for building damage by arranging for its preferred repairers to repair the damage or by paying the complainant the cost of repairs.
The policy says that if the insurer pays the complainant the cost of repairs, it will pay a cost that is ‘available to or actionable by’ the complainant.
Insurer’s builder not willing to repair roof
The insurer says its builder was initially willing to repair the roof. However, the parties agreed to cash settle other parts of the claim, including the cost of replacing roof-mounted solar panels. This means the complainant will appoint builders to perform this work.
The insurer’s builder said it did not want to repair the roof if the complainant’s builder would be walking on the roof afterwards. This was because the complainant’s builder might damage the roof and blame it on the insurer’s builder.
No other builder willing to repair roof
In an email to the insurer on 18 June 2025, the insurer’s builder said:
Please note obtaining a qualified roof tiler willing to assist with Insurance works out in [the complainant’s region] is very difficult, as the majority of licensed roof tilers out that way only work on New Builds and not willing to assist with Insurance repairs and there rates are also not acceptable to [the insurer] in most cases.
I can confirm that [we] utilised our roof tiler from [about 400km away] to complete our allocated roof tiling works throughout [the complainant’s region] however he went out there for a period at a time when we had multiple repairs to send him to make it worth his while.
I have spoken with our roof tiler and he has advised it is simply not financially viable for him to travel to [the complainant’s region] for 1 x job unless it is a full re-roof.
The insurer’s builder’s email indicates neither the complainant nor the insurer could appoint a repairer to replace only the damaged tiles. No quote would be ‘available to or actionable by’ the complainant, unless it was for a full re-roof, or cost as much as a full re-roof.
The insurer says the complainant is only entitled to the cost of a roof repair, not the cost of a full re-roof. However, the insurer’s builder’s email indicates the cost of a roof repair is the same as the cost of a full re-roof.
I have asked the insurer whether it would be fair to settle the claim based on a quote to replace only the damaged tiles, given its builder’s advice that it would be very difficult to find a qualified person to perform this work. The insurer has not provided an answer.
Complainant provided quotes for roof replacement
The complainant provided two quotes which included the replacement of all tiles on the main roof. The quotes include the following work relating to the main roof:
|
Item
|
Quote 1 (AR)
8 April 2025
|
Quote 2 (GC)
9 April 2025
|
Roof rail installed to facilitate roofing repairs
|
$3,850
|
$3,850
|
Remove and replace roof tiles (approx 525m2)
|
$68,250
|
$68,250
|
Remove and replace sisalation (sarking)
|
$7,875
|
|
Supply and install custom apron flashings
|
$1,530
|
|
Remove and replace cladding to facilitate apron flashing install
|
$10,500
|
|
Prepare and paint cladding
|
$2,500
|
|
Dropsheet to protect roof during painting
|
$800
|
|
Plywood to protect roof during painting
|
$600
|
|
Remove and replace battens
|
$7,875
|
|
Remove and replace skylight
|
$1,500
|
$1,500
|
Remove and replace sewer vent pipes and dektites
|
$500
|
$500
|
Skip bin
|
$12,600
|
$9,000
|
Subtotal
|
$118,380
|
$83,100
|
GST
|
$11,838
|
$8,310
|
TOTAL
|
$130,218
|
$91,410
Quote 1 totals $133,628 and Quote 2 totals $199,912.30. However, these amounts include repairs to other items (such as solar panels, canvas awnings, and garage doors) which the insurer has paid for separately.
The complainant previously obtained a quote (dated 7 September 2024) which included $100,651.32 ($91,501.20 plus GST) for roof plumbing. However, this included work on the shed and patio roof, which the insurer has paid for separately. The quote did not say how much of the cost was for work on the main roof. I have not considered this quote further.
Quote 1 and Quote 2 include the cost of installing a roof rail for safety. The insurer says safety harnesses would be sufficient, given the height of the roof. However, the insurer’s builder allowed for a roof rail in repairing the shed. The insurer has not provided information showing the shed roof is higher than the main house roof. In photographs, the roofs look similar in height. The insurer should pay this cost.
Quote 1 includes items related to the installation of custom flashings. The insurer’s builder’s quote included an allowance to ‘replace custom lead flashing’. Photographs of the roof show the custom flashing. The insurer should pay these costs.
Quote 1 includes the replacement of battens. The insurer’s assessor said the batten replacement was ‘a consequence of full roof replacement’. The insurer is required to pay for a full roof replacement, so it must pay for the batten replacement.
Quote 1 includes the replacement of sarking. The insurer’s building consultant said the sarking was damaged by a bird nest. The complainant has not provided information showing the sarking was damaged by the storm. The insurer is not required to pay for sarking.
The other items in the table above were also included in the insurer’s builder’s quote, though the insurer’s builder only allowed for the replacement of damaged tiles, not all tiles.
Insurer should pay 20% contingency for transfer of risk
When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. When the insurer settles a claim by paying the cost of repairs, it transfers this risk to the customer.
AFCA considers that if an insurer cash settles a claim, it should consider paying an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
The insurer offered to pay a 20% contingency on other settlement payments made under this claim. The complainant accepted this.
In my view, it is fair for the insurer to pay a 20% contingency for the transfer of risk on the settlement payment for the roof replacement.
Fair settlement payment is $146,811.60
The insurer should settle the part of the claim relating to the main roof by paying:
|
Item
|
Amount
|
Roof-related items in Quote 1
|
$130,218
|
Less allowance for sisalation (sarking)
|
($7,875)
|
Subtotal
|
$122,343
|
Transfer of risk (20%)
|
$24,468.60
|
TOTAL
|
$146,811.60
Insurer must pay interest
Section 57 of the Act says an insurer must pay interest on a claim settlement payment from the time it was unreasonable to have withheld payment. In the circumstances, I consider this to be 25 June 2025, one week after the insurer’s builder said it would be very difficult to find a roof tiler to repair the roof without doing a full re-roof.
The insurer must settle the part of the claim relating to roof damage by paying $146,811.60, plus interest at the rate determined under section 57 of the Act from 25 June 2025.
No compensation for non-financial loss
Under the AFCA Rules, we can award up to $6,300 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. We will only award this type of compensation if there has been an unusual degree of stress, inconvenience, or delay. We will not award compensation for the usual amount of inconvenience involved in making a claim. We will not award compensation for delays caused by a complainant, or other factors outside the insurer’s control.
The complainant says dealing with the claim has been the worst experience of her life. She says the insurer should pay the maximum amount of compensation for her inconvenience and time spent dealing with the claim.
The claim gave rise to many disputes. The complainant spent significant time and effort in dealing with the claim. However, this was not due to any misconduct by the insurer. The insurer engaged in negotiations with the complainant and agreed to settle most of the issues in dispute. The insurer has paid the complainant for the accepted items. Overall, the insurer’s handling of the claim was reasonable.
I have concluded the complainant is entitled to the cost of a full re-roof. The insurer has not paid this. This means the complainant has not received money she is entitled to. However, this determination awards interest from the time the payment should have been made. AFCA considers that if a complainant is entitled to money, and there is a delay in receiving payment, an award of interest will usually be sufficient to compensate for the delay.
For the above reasons, the insurer is not required to pay compensation for non-financial loss.
2.2 Why is the outcome fair?
The insurer’s builder provided a quote to replace the damaged tiles without replacing the whole roof. However, the insurer’s builder was not willing to perform the work, and said it was unlikely that any other builder would be willing to perform the work. If would not be fair to rely on this quote to settle the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
3.2 Relevant policy terms
|
Claims and what we pay (pages 69 – 88)
|
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home and any 'other benefits' in one of the following ways. Our choice will have regard to the circumstances of your claim and consider any preference you may have.
1. Arrange for repairers, builders or suppliers to repair or rebuild your home
If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your home. We may enter into a contract with our selected repairer, builder and/or supplier on your behalf.
2. Pay you the reasonable cost to repair or rebuild your home
We can choose to:
· pay you
· pay your nominated repairer, supplier or builder, or
· provide you with store credits from one of our nominated suppliers.
How we calculate the amount if we choose to pay you
If your building is repairable, in some circumstances we will choose to settle your claim by deciding to pay you. We will pay you the reasonable costs of what it would cost us provided that cost is available to or actionable by you.
What are some examples of when we do this?
· when you decide not to repair or rebuild your home
· if you don't start repairing or rebuilding your home within 6 months of the loss or damage, or within any longer period we agree to in writing
· if not all the damage to your building is covered by this policy - you can find examples of these under 'Not covered' or 'General exclusions and your responsibilities' in this policy
· your building may have had some damage that existed prior to the event you are claiming for
· your building cannot be repaired until other work that is required to be done by you is completed, or
· when it is the only way to settle your claim.
Calculation of the amount
· we may ask you to obtain a quote or we will obtain a quote for the repairs from our builder or repairer
· If we obtain the quote, we will provide you with details of the work that has been included:
‒ this will be detailed in the quote, or
‒ for larger claims we may include a scope of works
· we will confirm that the builder who has provided the quote is prepared to undertake the work - provided you have completed any work that is required to be done by you first
· the amount we will pay you will not be more than the Buildings sum insured.
We will use this method to calculate your settlement provided we have not chosen to settle your claim under '3. Pay you the Buildings sum insured'.
3. Pay you the Buildings sum insured
…
4. Pay for other benefits
…
|
How we settle certain things
When we pay your claim, we settle certain things in line with the information shown in this section.
Matching materials
Under Buildings Insurance
· we only repair the damaged part(s) of your home. We don't pay for materials to match the undamaged parts of your home to create a uniform appearance.
· In the event of repairs, we will make a fair and reasonable attempt to match the repairs to undamaged areas, using the closest match available
· If you are not satisfied with the closest match, you are able to:
> pay the extra cost of repairing undamaged areas to achieve a matching appearance, or
> we will pay you what it would have cost us to repair the damaged area.
Carpet, vinyl, tiles or floorboards
Under Buildings Insurance and Contents Insurance
· we only repair or replace the carpet, vinyl, tiles or floorboards in the part of your
· home that was damaged
· we don't pay for any adjoining rooms, or your entire home.
…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.