Home / Youi / Determination 12-25-186106

Determination 12-25-186106

Claim for escaping water damage declined as repair cost below excess and insurer alleged prejudice from late lodgement

FirmYoui
Decided2025-09-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$49,704
Non-financial loss$2,000
Amount claimed$43,221
SourceAFCA PDF

Summary

The insurer declined a burst pipe water damage claim, saying repair costs were under the excess and that late lodgement prejudiced it. AFCA found for the complainant, requiring the claim to be settled on the DC quote plus 15% (or repairs arranged), $2,000 non-financial loss and up to $5,000 professional costs.

The insurer did not show on balance that damage was limited to the small scope or that it was prejudiced by the delay, so it could not fairly limit or refuse liability under the policy.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial loss

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-186106 | Financial firm | Youi Pty Ltd Case number: 12-25-186106 19 September 2025 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy (policy) with the financial firm (insurer). On 22 June 2024, a claim was lodged for water damage due to a burst pipe discovered on 1 August 2023. The insurer has declined the claim. The insurer says the cost of repairs assessed under the claim fall below the $2,500 policy excess. Also, that it is entitled to decline cover for any additional damage caused due to the delay in the complainant lodging the claim. The complainant is dissatisfied with the insurer’s assessment of its liability under the policy. 1.2 Issues and key findings Is the insurer’s assessment of its liability under the policy fair? No. The exchanged information does not show, on the balance of probabilities, that the damage to the bathroom is limited to the scope of works relied on by the insurer. Also, the insurer has not shown, on balance, that it has been prejudiced by the delay in the complainant lodging the claim. Accordingly, the insurer is to accept the claim in line with the policy and as set out in this determination. Is the complainant entitled to compensation? Yes. The insurer is to pay the complainant $2,000 in non-financial loss compensation (NFL). The insurer, subject to being provided with proof of payment, is to also reimburse the complainant for any professional expenses incurred in line with the AFCA Rules up to a maximum of $5,000. Why is the outcome fair? The outcome is fair because it is based on the policy and exchanged information. The insurer has not shown it is most likely that the resultant damage falls under the policy excess or that it has been prejudiced by complainant’s delay in lodging the claim. It would not be fair to permit the insurer to refuse or limit its liability under the policy. It is fair the insurer compensates the complainant in line with this determination. 1.3 Determination This determination is in favour of the complainant. The insurer is to accept the claim and settle the complainant for the damage in line with this determination. The insurer is to pay the complainant $2,000 in NFL. Further, subject to being provided with proof of payment, the insurer is to reimburse the complainant for professional expenses up to a maximum of $5,000 in line with the AFCA Rules. 2 Reasons for determination 2.1 Is the insurer’s assessment of its liability fair? No. The exchanged information does not show, on balance, that the damage to the bathroom is limited to the scope of works relied on by the insurer. Also, the insurer has not shown, on balance, that it has been prejudiced by the complainant’s delay in lodging the claim. The policy is an insured events contract of insurance The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Escaping water’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. The complainant has shown damage that triggers cover under the policy The complainant is required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. The exchanged information shows there is no dispute a burst pipe to the bath plumbing in the main bathroom of the insured building was found on or about 1 August 2023. Further, that the complainant arranged for emergency repairs to be completed by a plumber. This included removal of two wall tiles and cutting a hole to access the burst pipe. The exchanged information shows that the bath taps were not re-installed after these emergency repairs, and the bath has not been used since. The complainant lodged the claim on 22 June 2024 and has explained that the delay was because of a need to care for his father, who has since sadly passed away. The insurer maintains: · the complainant has not shown there exists any resultant damage from the burst pipe for which the cost of repairs exceed the policy excess of $2,500 · also, that the insurer is entitled to decline cover for any additional damage that arose due to the complainant’s failure to lodge the claim within a timely fashion. The insurer says it has been prejudiced by the delay in the complainant lodging the claim. Parties rely on the opinions and reports from appointed experts The parties have each sourced and rely on reports from their preferred experts. I have considered all these reports. These have been exchanged with the parties who each had the opportunity to review and respond. I do not intend on reiterating all the information from these reports and reference is limited to what I consider relevant in providing this determination. There is no dispute the complainant, on becoming aware of the escape of water event, has arranged an emergency plumber to attend and rectify the burst pipe. These repairs included removal of two tiles and cutting a hole in the wall to access the burst pipe. On completion of repairs the taps were not reinstalled i.e. it is fair to accept the bath has not been used since the repairs to the burst pipe. The insurer appointed consultants’ ‘DK’ to investigate the cause and extent of the damage, arrange any necessary make safe works and to provide quote for repairs. DK’s assessment on 26 June 2024 confirmed a burst pipe had resulted in escape of water and the removal of tiles and a section of the villa board. It provided a scope of works and repair quote totalling $1,065.53, which DK says represents the damaged area. This report includes a question as to whether further works were still required with the DK selecting ‘Yes’. These recommended works included removal of tiles to expose the timber framing for restoration works pending the insurer’s approval. The exchanged information indicates the insurer did not acknowledge or authorise this recommendation regarding further works. In a make safe report dated 17 July 2024, DK (through its appointed sub-contractor ‘RL’) confirmed moisture readings of the exposed timber beams and surrounding tiles were dry. Due to the small size of the hole cut, further investigation was not able to be completed to assess timber beams. Exposed areas were treated with antimicrobial solution given a positive reaction for mould and concern regarding possible mould contamination. The complainant appointed building consultants’ ‘AB’ who have provided a report dated 18 July 2024. AB says the burst pipe had been leaking for some time resulting in rot of the timber stud and that there is clear evidence of rot to other wall timbers below the taps. AB says it cannot guarantee integrity of the external wall frame until the bottom of the timber frames are accessible for inspection. The complainant has provided a repair quote from ‘DC’ dated 15 July 2025 in the amount of $43,221.20. DC says due to the existing water damage, and potential for further damage, a minor repair will not be sufficient. DC has provided a detailed scope of works for the bathroom repairs. The exchanged information supports the presence of further damage I am satisfied it is fair to accept the following based on the experts’ information: · due to a lack of invasive investigations by the experts, a detailed assessment of the extent of the damage from the escaping water is yet to be completed · it is most likely that there is going to be further damage present to the timber structure once the tiles have been removed · it is more likely than not there exists mould contamination within the wall structure consistent with the complainant’s concerns. For these reasons, I am not satisfied the insurer has been able to show, on balance, that it is entitled to limit liability to the cost of the two tiles and villa board removed by the emergency plumber. It is fair to accept there is further damage and mould remediation works that fall within cover available under the policy. The insurer has not shown it has been prejudiced I acknowledge the insurer’s view that it has been prejudiced due to the complainant’s delay in lodging the claim. Further, that the extent of this prejudice equals the full extent of any further/additional damage to the bathroom (other than that caused by the emergency plumber). I am not satisfied the insurer has shown, on balance, it has suffered any prejudice due to the complainant’s delay in lodging the claim. I accept the complainant has provided a reasonable and persuasive reason for the delay in lodging the claim. Further, the exchanged information shows: · the bathtub has not been used since the emergency repairs were completed for there to have occurred any further damage due to an escape of liquid · moisture testing completed by the insurer found the area in question to be dry · it is most likely the leak had been occurring for some time causing further damage below and that this occurred before the emergency repairs were completed · the complainant was not aware of the presence of the burst pipe until such time water was noted escaping through the rear external wall · that the insurer, having had the opportunity, elected not to complete any invasive or reasonable investigations into the possibility of additional damage from the escape of water · the insurer, other than alleging prejudice, has not provided any persuasive reasons or supporting information to establish such prejudice. Given the above, I am not satisfied it would be fair to permit the insurer to decline or limit its liability on the basis it had been prejudiced by the complainant’s delay in lodging the claim. Insurer is to accept the claim in line with the policy Within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer at its discretion is to either: · settle the claim based on the scope of works and repair quote from DC in the amount of $43,221.20. If this is the preferred mode of settlement, the insurer is to increase the settlement by a further 15% to allow for contingencies; or · alternatively, confirm that it intends to arrange and manage the repairs to the bathroom · if option two is the insurer’s preferred option, it is to ensure that the repairs are commenced within 21 days of receiving notice of the complainant’s acceptance of this determination (subject to the complainant providing reasonable access and co-operation). 2.2 Is the complainant entitled to compensation? Yes. The insurer is to pay the complainant $2,000 in NFL. The insurer, subject to being provided with proof of payment, is to also reimburse the complainant for any professional expenses incurred in line with the AFCA Rules up to a maximum of $5,000. AFCA Rules allow for an award of compensation The AFCA Rule D 3.3 allows for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. An award of NFL under the Rules is based on an unusual degree or extent. This would not encompass the normal degree of inconvenience a person would suffer when lodging an insurance claim or in a dispute with their insurer. Insurer is to pay the complainant $2,000 in NFL I am satisfied it is fair that the insurer be required to pay the complainant NFL. This is because the insurer’s failure to fairly assess its liability under the policy has caused the complainant to experience undue levels of stress, anxiety and delays. The exchanged information also indicates the insurer failed to clearly communicate its position over the life of the claim which has also negatively impacted on a subsequent claim lodged by the complainant for damage in the bathroom from a separate event. I accept this will have only further added to the undue levels of stress and anxiety experienced by the complainant. I am satisfied it is fair that the insurer be required to pay the complainant $2,000 in NFL within 14 days of receiving notice of his acceptance of this determination. Insurer to reimburse professional expenses The AFCA Rules allow for the insurer to be required to contribute towards professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. These costs include legal or other professional costs. When considering whether to require an insurer to make a costs contribution, AFCA considers the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. I am satisfied that the expert reports, scopes of work and repair quotes sourced by the complainant in support of his position have been helpful in considering this complaint. Also, that this information has assisted the complainant in successfully establishing his position under the policy and this complaint. Therefore, within 14 days of receiving notice of the complainant’s acceptance of this determination, and subject to being provided with proof of payment, the insurer is to reimburse the complainant for such professional expenses. 2.3 Why is the outcome fair? The outcome is fair because it is based on the policy and exchanged information. The insurer has not shown it is most likely that the resultant damage falls under the policy excess or that it has been prejudiced by the delay in the complainant lodging the claim. It would not be fair to permit the insurer to refuse or limit its liability under the policy. It is fair the insurer compensates the complainant in line with this determination. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.