Partial decline of water damage claim for Units 1, 3 and 6 under exclusions for gradual deterioration, plus loss of rent shortfall
Text of the determination
Determination
|
Case number
|
12-25-185995
|
Financial firm
|
Allianz Australia General Insurance Limited
Case number: 12-25-185995 24 April 2026
1 Determination overview
1.1 Complaint
The complainant is a company represented in this complaint by its director. The complainant held a business insurance policy underwritten by the financial firm (the insurer), which covered damage to business property (a multi-unit tenanted building) and loss of rent.
The complainant lodged a claim with the insurer for water damage to two residential units and the ground‑floor commercial unit. The complainant said the damage to the ground-floor unit was caused by a storm and the damage to the residential units was caused by a burst pipe.
The insurer partially accepted the claim. It accepted some of the damage to one of the residential units (Unit 6) resulted from a burst pipe and accepted some of the damage to the ground‑floor unit (Unit 1) was caused by a storm. It also paid some loss of rent benefits for these units. However, it declined the claim for damage and loss of rent for the other residential unit (Unit 3), saying that the damage was caused by policy exclusions.
The complainant disagrees with the insurer’s decision and seeks cover under the policy for all the claimed damage to all three units, and further loss of rent benefits.
1.2 Issues and key findings
Is the insurer required to pay the claim for damage to Unit 3?
No. I am satisfied that the proximate cause of the damage to Unit 3 was gradual deterioration of the waterproofing membrane, which is excluded under the policy.
Is the insurer required to pay more of the damage claim for Units 1 and 6?
No. I am satisfied that the insurer has shown that the additional claimed damage is not covered because it is excluded under the policy. However, it is required to pay the complainant’s costs of $1,694 for finding the source of the leak from Unit 6.
Is the insurer required to pay further loss of rent benefits?
Yes. It is required to pay the complainant an additional $1,840 for loss of rent for Unit 6, and $9,197.15 for Unit 1 (if it has not already paid this).
Is the insurer required to pay other compensation?
No. The insurer is not required to pay compensation for indirect or non-financial loss, or pay the complainant’s professional costs.
Why is the outcome fair?
It would not be fair to require the insurer to pay for damage excluded under the policy. It is fair for the insurer to pay additional loss of rent benefits for Units 1 and 6.
1.3 Determination
The determination is substantially in favour of the insurer. Within 14 days of being notified of the complainant's acceptance of this determination, the insurer is required to pay the complainant additional loss of rent payments of $1,840 for Unit 6, and $9,197.15 for Unit 1 (if it has not already done so), and the complainant’s leak exploration costs of $1,694 plus interest as set out in section 2.2 of this determination.
2 Reasons for determination
2.1 Is the insurer required to pay the claim for damage to Unit 3?
No. I am satisfied that the proximate cause of the damage to Unit 3 was gradual deterioration of the waterproofing membrane, which is excluded under the policy.
There is a claimable loss for the damage to Unit 3
The complainant has the onus of establishing it suffered a loss from an event covered by the policy. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
If the complainant can establish that it suffered a claimable loss, the onus shifts to the insurer to show, on balance:
· it is entitled to rely on an exclusion under the policy, or
· it is otherwise entitled to reduce its liability or decline the claim.
There is no dispute that Unit 3 has water damage. The exchanged material shows that water has damaged the bathroom of Unit 3 affecting the waterproofing membrane, services riser, internal finishes and the ceiling of the ground‑floor commercial unit (Unit 1) below.
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Policy Schedule.
Under the Commercial Property section of the policy, there is cover for accidental damage to the insured property. Page 23 of the PDS states:
Except as otherwise specified, We will pay up to the applicable Sum Insured or sublimit specified herein, subject to a maximum total amount per claim up to the Limit of Indemnity, in accordance with the Basis of Settlement for Property Insured that is accidentally Damaged at the Situation during the Period of Insurance
‘Damage’ is defined as ‘any physical loss of, destruction of or damage to the Property Insured so as to lessen its value or any physical loss’.
The term ‘accidentally’ is not defined in this section of the policy, but is defined in another section as follows:
unexpected and unintended from Your standpoint
The claim information submitted by the complainant supports that the damage to Unit 3 was unintended and unexpected by them. As such, I am satisfied that the complainant has shown a claimable loss under the policy.
Parties do not agree on the cause of damage to Unit 3
Both the complainant and the insurer accept that water in the bathroom in Unit 3 caused damage to the waterproofing membrane, services riser, and areas below. However, the parties disagree about what caused this damage.
The complainant says the damage to Unit 3 was caused by one or more of the following:
· the same causes of damage accepted by the insurer in other parts of the property, including:
> escape of liquid from plumbing, including water escaping from plumbing associated with the other residential unit (Unit 6)
> storm‑related water damage to the ground‑floor commercial unit (Unit 1).
The complainant says that Unit 3 forms part of the same building system, services risers, and wet‑area construction as Units 1 and 6, and water from the burst pipe and/or the storm travelled through these shared pathways.
· the same causes as a claim lodged in 2021, where the insurer accepted a claim for water damage to other bathrooms in the building that the complainant says were:
> constructed in the same manner as Unit 3, and
> affected by water entering through the same riser and plumbing configuration.
The insurer does not agree. It says the damage to Unit 3 was caused by maintenance issues, wear and tear, and gradual deterioration, which are all excluded under the policy. The insurer says the mere existence of water damage, or similarity to damage elsewhere in the building or historical claims, does not establish that the proximate cause of the damage in Unit 3 was the same.
The insurer obtained reports from its appointed building assessor, TA, and plumber, TO, who both attended the property to assess the damage and report on its likely cause. Their reports recorded the following in relation to Unit 3:
· TO carried out plumbing testing within Unit 3 and did not identify any leaking pipes supplying the unit
· TO found that the waterproofing membrane to the Unit 3 shower/bath had failed, allowing water to pass through the wet area during shower use
· during shower testing conducted by TO, water was visually observed dripping into the ceiling of the ground‑floor commercial unit below, which it said indicated a failure of the waterproofing system
· TA observed that the damage showed signs consistent with ongoing or prolonged moisture exposure, rather than damage from a single, isolated water ingress event. TA said that if water from the Unit 6 burst pipe had caused the damage to Unit 3, there would have been indicators of recent, sudden water flow (such as moisture, staining, or water pathways in the ceiling or upper wall areas of Unit 3), which were not present.
The insurer relies on these findings to say that the damage to Unit 3 arose from maintenance issues, wear and tear, or gradual deterioration, rather than an insured event under the policy.
Proximate cause of damage to Unit 3 excluded under the policy
I have closely considered the exchanged information, and particularly the reports by TO and TA, to determine the cause of the damage to Unit 3.
Damage can have more than one cause. When deciding whether the policy responds, it is necessary to identify the proximate cause of the damage. This is a question of fact depending on the circumstances. The proximate cause is not necessarily the first, last or sole cause of the loss. It is the effective, dominant or operative cause of the loss.
The policy provides cover for accidental damage to the insured property. The complainant is not required to establish the precise cause in order to demonstrate that accidental damage has occurred.
However, the policy is subject to terms and conditions, including exclusions. If the insurer shows that the damage was caused by, or is attributable to, an excluded cause, then it is entitled to deny the claim.
The policy excludes loss or damage caused by maintenance issues, wear and tear, or gradual deterioration. These policy exclusions are as follows (at page 28 of the PDS):
3. We will not cover You for Damage caused by:
a. inherent vice or latent defect, wear and tear, gradual deterioration, fading, developing flaws, scratching, marring, normal upkeep or any gradual cause;
TO’s report is persuasive in its assessment of the condition of Unit 3 and showing how water entered the property. TO carried out plumbing testing within Unit 3 and did not identify any leaking pipes supplying the unit or signs of water escaping from plumbing above. Instead, TO found that the waterproofing membrane to the Unit 3 shower/bath had failed, allowing water to pass through the shower walls during normal shower use. During shower testing, water was also observed dripping into the ceiling of the ground floor commercial unit below, which TO considered consistent with waterproofing failure within Unit 3 rather than water travelling down from the burst pipe in Unit 6.
TA also did not identify indicators of recent or sudden water flow that would ordinarily be expected if water from the Unit 6 burst pipe had been the cause of the damage to Unit 3.
I have also considered TA and TO’s reports about why the waterproofing membrane may have failed. I accept their explanations that it failed due to deterioration over time. In particular:
· TA’s testing showed that water passed through the wet area during normal shower use, which I accept is consistent with an aged or deteriorated waterproofing system
· the condition of the services riser and surrounding materials showed signs of prolonged moisture exposure over time (more than a year), consistent with gradual deterioration of the membrane as well. The photos provided by TA show wood swelling and rot, extensive peeling and other age-related deterioration.
· the photographs and descriptions of the overall condition of the bathroom was consistent with an older system failing through wear and tear or gradual deterioration.
The complainant has not persuasively overcome the conclusions reached by TO and TA regarding the cause of the damage to Unit 3. In particular:
· the complainant has not shown water pathways, moisture staining, or damage within the ceiling or upper wall areas of Unit 3 that I accept would be expected if water had travelled downward from Unit 6. I am also not persuaded that the existence of shared building components, of itself, establishes this, nor that the stormwater ingress that damaged Unit 1 also damaged Unit 3.
· I am not persuaded that the previous claims accepted by the insurer in 2021 for water damage in other units means the insurer should also accept the current claim for damage to Unit 3. These claims arose in different factual circumstances. They do not displace the specific findings made by TO and TA based on inspections, testing, and observations undertaken in relation to Unit 3
· most critically, the complainant has not shown that the waterproofing membrane within Unit 3 was intact or performing as intended, or that it had not been deteriorating over time. They have also not provided any alternative explanation for why water was observed travelling downward from Unit 3 during testing.
I am therefore satisfied that the water damage in Unit 3 (plus the water damage to the ceiling of the ground floor unit) was caused by the failure of Unit 3’s waterproofing membrane. This falls within the policy exclusions for maintenance issues, wear and tear, and gradual deterioration. As a result, the insurer is not required to provide cover for the damage to Unit 3.
2.2 Is the insurer required to pay more of the damage claim for Units 1 and 6?
No. I am satisfied that the insurer has shown that the additional claimed damage is not covered because it is excluded under the policy. However, it is required to pay the complainant’s costs of $1,694 for finding the source of the leak from Unit 6.
Insurer partially accepted claim for damage to Units 1 and Unit 6
The insurer partially accepted the claim for damage to Units 1 and 6 as follows:
· in relation to Unit 6, the insurer accepted that water damage in the bathroom area arose from a burst pipe in the shower/bath walls. The insurer also accepted other resultant damage from the burst pipe (including damage to areas directly affected by the escape of water such as finishes and other building parts). However, it excluded broader claimed damage to Unit 6 which it said was ongoing, pre‑existing, or maintenance‑related
· in relation to Unit 1, the insurer accepted that water ingress from a storm caused damage to parts of the ground floor commercial unit (including parts of the ceiling, internal walls, and internal finishes). However, it excluded other damage including:
> the damage to parts of the ceiling that flowed from the bathroom failed waterproofing membrane in Unit 3, as outlined above
> damage it assessed as maintenance‑related, including damage associated with roof defects and box‑gutter issues
> other damage it considered ongoing or gradual in nature
· for the damage it accepted for Units 1 and 6, the insurer offered and paid the complainant a cash settlement of $35,891.08.
Complainant says there is further damage to Units 1 and 6 that should be covered
The complainant says that the insurer has:
· underestimated both the scope and cost of the required repairs, and
· improperly excluded damage to Units 1 and 6 that, in the complainant’s view, resulted from the storm and burst pipe.
In relation to Unit 6, the complainant says that the burst pipe in the shower/bath walls caused more extensive damage than allowed for by the insurer. The complainant says that the damage caused by the burst pipe needs a full replacement of the bathroom and related affected areas. The complainant also says that all of the damage was caused by the burst pipe, and was not pre-existing, ongoing or maintenance-related.
In relation to Unit 1, the complainant says that the stormwater ingress caused wider damage than the insurer accepted, including damage to ceilings, walls and finishes in multiple internal areas. The complainant also disagrees with the insurer’s position that some of the damage to Unit 1 flowed from the failed waterproofing membrane in Unit 3 or from maintenance issues.
Insurer not required to pay for additional claimed damage to Units 1 and 6, but is required to pay Unit 6 leak exploration costs
The insurer has the onus of showing, on the balance of probabilities, that it is entitled to rely on an exclusion under the policy to limit or decline the claim.
The insurer’s expert material is persuasive in showing why the additional claimed damage arose from excluded causes such as maintenance issues, wear and tear, or gradual deterioration. I note that:
· For Unit 6:
> TO’s plumbing testing identified a burst pipe in the shower/bath wall area which allowed water to escape during the use of the shower/bath into areas in and near the bathroom. The insurer accepted damage to the bathroom itself and other areas directly affected by the escape of water from the pipe, as shown by TO’s testing
> TA reported that much of the broader damage claimed in Unit 6 showed signs consistent with prolonged or ongoing moisture exposure
> in particular, TA noted deterioration to waterproofing systems, finishes and building materials that was consistent with pre‑existing issues and maintenance‑related wear and tear. TA provided photographs to explain the signs of long-term deterioration such as discolouration, degradation of materials, and different moisture patterns than those that would be caused by a more recent burst pipe in the shower/bath area
> TA also said that this deterioration was primarily due to continuous water ingress caused by ongoing leaking from the roof, including broken tiles, deteriorated pointing, and an ineffective box gutter.
Notwithstanding this, I note that the insurer’s cash settlement for Unit 6 was based on TA’s SOW and quote, which extended to works to ‘remove and reinstate bathroom finishes and waterproofing to current compliant standards where required as part of the rectification of the insured damage’. For this reason, it covered repairs to some of the broader excluded damage too, as a necessary part of fixing the damage caused by the burst pipe.
The complainant has provided a quote for works to Unit 6 that is significantly higher than the insurer’s cash settlement. The insurer however says that the complainant’s quote covers the same scope of works as TA’s quote and is simply more expensive. I have compared the quotes and am also satisfied they include the same items. As such, I am satisfied that the insurer has correctly and sufficiently assessed the damage caused by the burst pipe (including the additional consequential repairs), and settled the complainant for this.
I have also considered the complainant’s claim for $1,694 for the exploratory and investigation expenses incurred in identifying the extent of the damage to Unit 6. I am satisfied that these costs were reasonably and necessarily incurred by the complainant, noting that the policy provides cover for this in these circumstances. The insurer is therefore required to pay this to the complainant (together with interest calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 25 June 2024 (14 days after date the complainant provided the insurer with the invoice), until the date of settlement.
· For Unit 1:
> I acknowledge that both the accepted and excluded damage to Unit 1 involved water entering the building via the roof and box‑gutter system. However, I am satisfied that the insurer and its experts have shown why not all the damage is covered
> in particular, TA explained that the storm water affected specific areas of the unit, including parts of the ceiling, internal walls and finishes directly below known storm entry points (which were via the roof and box‑gutter system above it)
> TA explained that the other areas of damage in Unit 1, in contrast, were located away from these storm entry points and was different in nature. For example:
‒ the staining and discolouration throughout the unit was uneven, rather than concentrated beneath the storm entry points
‒ there were visible moisture pathways down internal wall and ceiling linings consistent with the gradual and ongoing entry of water over time
‒ the materials showed signs that these areas had been wet for a long time and had deteriorated due to repeated water entry
‒ when TA attended the premises, it observed water dripping from the box gutter during the inspection
> Damage to the ceiling of Unit 1 was caused by the leaking of the water from Unit 3. As outlined at 2.1 above, I have already accepted that the failure of the waterproofing membrane in Unit 3 is excluded under the policy.
I also note that the complainant was aware, following earlier inspections and a previous claim in 2021, that there were ongoing maintenance issues with the roof and box guttering which required attention. The reports by the insurer’s roofing expert RO and builder AD both pointed out roof damage that required maintenance. The insurer’s claim outcome letters from 2021 advised the complainant of this as follows:
In summary, the builders roof report confirms the cause of the water entry to the direct result of a broken roof tile/s. The roof is in excess of 50 years of age and the roof report highlights general wear and tear and movement cracking to bed and pointing of the tiles and there are previous attempts at silicone repairs on the roof. There are eight broken roof tiles which are pre-existing due to silicon sealant previously applied to the breaks.
Furthermore, whilst repairs have been attempted to the vent pipe penetrations the associated roof flashing requires further repair to eliminate the water ingress and is a maintenance issue, not a storm created opening.
These issues were not fixed. I accept that this allowed water to enter the building repeatedly over time.
The complainant has not provided information to show that the insurer’s findings are incorrect. In particular, the complainant has not:
· pointed to any material that explains why the observed signs of prolonged moisture exposure and gradual water migration were not caused by ongoing issues
· shown that the relevant roof and box gutter maintenance issues had been fixed since 2021, or that they were no longer capable of allowing water ingress
· provided information demonstrating that the affected areas were previously free from water damage or deterioration
I am satisfied that the insurer has shown, on the balance of probabilities, that the additional claimed damage was caused by wear and tear, gradual deterioration, and other gradual causes (resulting from continued entry of water from the roof), all of which are excluded under the policy. Accordingly, it is not required to pay any further amounts for the additional damage claimed for Units 1 and 6.
2.3 Is the insurer required to pay further loss of rent benefits?
Yes. It is required to pay the complainant an additional $1,840 for loss of rent for Unit 6, and $9,197.15 for Unit 1 (if it has not already paid this).
Policy provides cover for loss of rent shortfall
Each of Units 1, 3 and 6 were occupied by tenants at the time of the claimed damage. Unit 1 was occupied under a commercial lease, and Units 3 and 6 were occupied under residential tenancy arrangements.
The policy provides cover for loss of rent where rent received or receivable during the period of accepted damage falls short of what would reasonably have been received if the damage had not occurred. The PDS states (at page 59):
We will pay the amount by which rent and amount by which rent and amounts for services rendered and/or recoverable expenses received or receivable during the Indemnity Period falls short of the amount that it may be reasonably estimated would have been received during that period had the Defined Event not occurred
The complainant says the water damage made the units partially or wholly untenantable. It says that, as a result, the commercial tenant in Unit 1 paid reduced rent, and the residential tenants in Units 3 and 6 vacated the premises and stopped paying rent.
Insurer has paid loss of rent for Unit 1 and offered a further payment
The insurer accepted that there was a loss of rent resulting from the insured damage to Unit 1 and assessed the period of reduced rent that was paid. It paid loss of rent for this unit (totalling $8,186.16, based on a four-week repair period) and later offered a further payment of $9,197.15 to account for reduced rent that was paid by the tenant after the damage. The complainant says this is insufficient for Unit 1.
The insurer also initially paid the complainant $1,840 to cover a shortfall in rent in Unit 6 (also calculated by the four-week repair period). The complainant says this was not sufficient because the tenant vacated the unit and rent was not paid for a longer period of 12 months.
The insurer did not accept that there was a loss of rent payable under the policy for unit 3, on the basis that the damage to that unit was not covered under the policy (as outlined at 2.1 above).
Insurer required to make additional loss of rent payments for Unit 6 and 1
I am satisfied that the insurer has not correctly assessed the loss of rent claim for Unit 6, but has correctly assessed the claims for Units 1 and 3.
For Unit 1, the insurer initially assessed the loss of rent based on a four‑week repair period (based on information from TA). The complainant has not shown this is not a reasonable period for the repair of the accepted damage.
For Unit 1, the insurer also offered the complainant a payment of $9,197.15 to reflect the reduced rent paid by the tenant over a longer period following the damage (from June 2024 until December 2024, when reduced rent was paid by the tenant). The complainant has not shown that there were rent reductions after this time or the reductions were greater than calculated by the insurer, also noting that the insurer has paid an additional loss of rent amount for Unit 1 for a four-week repair period. As such, I am satisfied that the insurer’s calculation of $9,197.15 for the further loss of rent period is correct, fair and reasonable.
For Unit 6, I have considered that the damage to the unit included damage caused by the burst pipe as well as other damage not covered under the policy. While the insurer says that the tenant vacated for reasons unrelated to the claim, I am satisfied that the complainant has established a sufficient connection between the insured damage and the tenant’s departure. While it may not have been the only reason for the tenant’s leaving, the timing of this shortly after the burst pipe satisfies me that it was the main reason for the tenant leaving.
For this unit, the complainant say it suffered loss of rent from 5 May 2024, when the tenant vacated, until approximately 5 May 2025. However, I do not consider it is reasonable for the insurer to pay loss of rent for the entire 12 month period. The complainant has not shown that the unit was not able to be re-let due to the insured damage alone, nor has it shown that it made efforts to obtain a new tenant during that 12 month period, nor shown that any new tenant would have paid a lower rent amount just because of the insured damage.
As such, I consider it is fair and reasonable in the circumstances for the insurer to pay the complainant an additional amount of $1,840, representing a further four-week loss of rent period for unit 6 after the tenant vacated.
For Unit 3, I accept that the damage was not covered under the policy, as set out at 2.1 above. Therefore, any loss of rent is also not covered.
2.4 Is the insurer required to pay other compensation?
No. The insurer is not required to pay compensation for indirect or non-financial loss, or pay the complainant’s professional fees.
Complainant seeks other compensation
The complainant says it has suffered additional financial loss as a result of the insurer’s handling of the claim, including holding costs (such as utilities) and professional expenses, and seeks compensation for stress, inconvenience and disruption associated with the ongoing dispute. The complainant also seeks reimbursement of architectural and consultant fees, which it says were necessary to plan and coordinate the repair works.
Insurer is not required to pay compensation for indirect financial loss
I note that the policy excludes cover for consequential or indirect financial loss, other than where benefits are expressly covered under the policy (such as loss of rent, which I have already considered at 2.3 above).
In any event, I am not persuaded that the exchanged information shows that the additional costs claimed by the complainant were caused by the insurer’s conduct. While the complainant disagrees with the insurer’s decisions about the cause of the damage, the material before me shows that the insurer appropriately assessed the claim, made payments where it accepted liability, and reviewed its position when further information was provided.
I am therefore satisfied that the insurer is not required to pay the complainant any compensation for indirect financial loss.
Insurer is not required to pay the complainant’s architectural and consultant fees
The complainant also seeks reimbursement of architectural and consultant fees, which it says it incurred to plan and coordinate the repair works.
However, I note that the insurer’s scope of works did not require architectural design or consultant involvement. Rather, the complainant has organised this itself.
I am not persuaded that the complainant has shown that the architectural or consultant fees it incurred were necessarily and reasonably incurred as a direct consequence of the damage I have accepted as covered under the policy. Rather, these costs appear to relate to the complainant’s broader approach to remediation (including other damage I have not accepted was covered). This does not require the insurer to pay or contribute to its costs.
Compensation for non‑financial loss
The complainant also seeks compensation for stress, inconvenience and disruption associated with the handling of the claim.
However, AFCA cannot award compensation for non-financial loss to a corporate entity. The complainant (and policyholder) is the company and AFCA’s rules do not extend this remedy to corporate entities or their directors or other representatives.
In any event, as I have already outlined above, I am not satisfied that the insurer’s conduct amounted to unreasonable delay, poor claims handling or maladministration of a kind that would warrant compensation in these particular circumstances.
2.5 Why is the outcome fair?
It would not be fair to require the insurer to pay for damage excluded under the policy. It is fair for the insurer to pay additional loss of rent benefits for Units 1 and 6.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.