Home / QBE / Determination 12-24-183519
Determination 12-24-183519
Failure to complete agreed repairs, poor make safe work and delays after malicious roof damage claim; scope of repairs and further non-financial loss
Summary
The complainant's roof repairs under a prior AFCA agreement were not completed, with poor make safe work and delays causing further damage. AFCA required the insurer to complete repairs on a reasonable scope, provide a written outline, and pay a further $1,300 non-financial loss.
The insurer breached the earlier agreement and its inadequate assessments, make safe work and delays made it liable for a wider scope of repairs and further compensation, though PDS limits on matching undamaged areas still applied.
Issues
- Poor claim handling primary · upheld
“The insurer's claim handling has been poor, has led to multiple avoidable delays, and has fallen well short of generally accepted industry standards.”
- Claim amount dispute secondary · upheld
“insurer to test bedroom 2 ceiling moisture and inspect bathroom/WC framing; remove and store all contents offsite”
- Inadequate claim investigation secondary · upheld
“The insurer has not fairly assessed its liability; point in time assessments some of which were themselves inadequate”
- Delay secondary · upheld
“On any reasonable assessment, repairs should have been completed long before now.”
- Product terms interpretation secondary · not upheld
“PDS does not cover undamaged parts to achieve uniform appearance; insurer not required to repaint walls or replace undamaged flooring”
- Repairs or contractors secondary · upheld
“liable for further water damage to the home due to its trades failed make safe works”
Subjects and remedies
home or building damagepay non financial lossprovide documentsreassess claimrepair or rectify
Text of the determination
Determination
|
Case number
|
12-24-183519
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-24-183519 5 August 2025
1 Determination overview
1.1 Complaint
The complainant holds home building and contents insurance with the financial firm (insurer). She lodged a claim after her roof was maliciously damaged on 17 September 2023.
The insurer accepted the claim, but the parties disagreed on the extent of claim related damage. On 29 August 2024, the resulting AFCA complaint was resolved on these terms:
· the agreed repairs to be completed by the insurer subject to the complainant signing a building contract with the insurer’s builder BB
· the insurer to pay for temporary accommodation (TA) while the home is unliveable for the duration of the repairs, subject to the policy terms
· the insurer to pay the complainant $4,000 in non-financial loss compensation.
The complainant has lodged another AFCA complaint. She says in breach of the August 2024 agreement (agreement), the insurer has failed to complete repairs and that its inadequate make safe work and delays have caused more damage. She wants the insurer to return her home to its pre-event condition, and to pay her additional non-financial loss compensation.
The insurer accepts it has caused delay and is responsible for additional damage. It has paid another $5,000 for the complainant’s unsatisfactory clam experience to 7 March 2025. However, it says it is not liable for all the work that the complainant wants undertaken.
1.2 Issues and key findings
Has the insurer fairly assessed its liability?
No. The insurer’s breach of the agreement, poor make safe work, delays, and inadequate assessments mean its liability is more extensive than it has accepted.
Is more non-financial loss compensation payable?
Yes. The insurer is to pay a further $1,300 in non-financial compensation for stress and inconvenience caused by its poor claim handling and delays since 7 March 2025.
Why is the outcome fair?
It is fair that the insurer attends to repairs based on a reasonable assessment of the claim-related damage and that it pays more in compensation due to its poor claim handling.
1.3 Determination
This determination is substantially in favour of the complainant.
If the complainant provides it with written notice that she accepts this determination, the insurer is to:
· attend to repairs in accordance with section 2.1 below
· within 14 days of receiving the notice, play the complainant a further $1,300 in non-financial compensation.
2 Reasons for determination
2.1 Has the insurer fairly assessed its liability?
No. The insurer’s breach of the previous agreement, poor make safe work, delays, and inadequate assessments mean its liability is more extensive than it has accepted.
Insurer has not complied with the agreement
On 29 August 2024, the parties agreed to resolve the prior AFCA complaint. The terms included that the insurer would complete the agreed repairs subject to the complainant signing a building contract with BB.
In fact, the complainant had already signed on 22 August 2024 a building contract with BB which included a scope of works (SOW). She had also paid the policy excess.
The signed building contract has not been provided to AFCA. However, it would have incorporated several previous SOWs and SOW variations BB had issued. The works included a full roof replacement as well as upgrades to ensure the roof met current building codes.
Between early September and late October 2024, BB and other trades appointed by the insurer identified that further items needed to be added to the SOW.
In mid-November 2024, the insurer referred the claim to its large and complex property claims team for management and appointed external loss adjuster S to assist.
The insurer has engaged multiple builders, plumbers, roofers, and engineers. The SOW has continued to expand from the version included in the BB building contract the complainant signed. Repair work is still yet to commence. The insurer has submitted that it:
regrets the oversights that occurred in relation to the works to be included in the scope of works.
…
Ultimately the above oversights ought to have been identified earlier by the insurer and the insurer’s trade [BB]. The insurer accepts responsibility for the oversights and acknowledges they have prolonged the claims assessment and repairs.
In the circumstances, I am satisfied that the insurer has not complied with the agreement. The SOW set out in the BB building contract did not encompass all the damage to be rectified and the necessary repairs have not been commenced or completed in a timely manner.
Insurer accepts that it is responsible for further damage
In submissions to AFCA, the insurer has accepted that it:
· has substantially contributed to avoidable delays in progressing the claim and repairing the home post the agreement
· is liable for further water damage to the home due to its trades failed make safe works
· will cover all necessary mould assessments and remediation.
Insurer has not fairly assessed its liability
The SOW has continued to expand, including because it originally failed to incorporate all works reasonably required and due to the insurer’s failed poor make safe work and delays.
The insurer now relies on a SOW dated 11 April 2025 from engineer SE and has obtained a quote from builder JL to do the work. The complainant submits that SE’s SOW is insufficient. There have been several detailed exchanges between the parties about SE’s SOW.
It is apparent from those exchanges that the following factors have at least partially contributed to the disagreement between the parties:
· the insurer’s point in time assessments (some of which were themselves inadequate) not necessarily reflecting the current damage because of its progressive nature caused by the inadequate make safe work and delays
· lack of clarity/detail in relation to some items in SE’s SOW
· the likelihood some damage will not be ascertainable until the works start
· the complainant’s understandable desire to have the repairs to be undertaken fully and comprehensively documented before works begin (although, I acknowledge it is not always possible to accurately determine all repairs in advance).
The claim event occurred 22 months ago and that the agreement was reached 11 months ago. On any reasonable assessment, repairs should have been completed long before now.
To provide the parties with as much certainty and clarity as possible, I set out below my findings on the areas in dispute as identified in the complainant’s email dated 12 May 2025:
Bedroom 2 (ground floor)
The complainant says the ceiling is water stained. She submits that plaster expands and deteriorates when exposed to water. The same approach should be adopted as that for the dining/kitchen/living area, where the insurer has approved ceiling replastering. She also says repainting of the room is required to maintain consistency, as approved for upstairs.
The insurer relies on SE’s comment that the bedroom had minor marks and small localised ceiling water staining but otherwise appeared to be in good condition. The insurer says available images support SE’s view. It notes that SE’s SOW allows for ceiling painting and says water stains do not warrant complete plasterboard replacement.
Water staining is caused by moisture. It is unclear whether bedroom 2’s ceiling remains moisture affected. I accept that if it is, remediation beyond painting will likely be required. The insurer is to arrange for a suitably qualified expert to test the ceiling’s moisture content and to advise on the extent of repairs required. The insurer is to attend to those repairs.
The product disclosure statement (PDS) confirms on page 59 that (other than in specific circumstances that do not apply) the policy does not cover costs for undamaged parts of the insured building, even to restore those undamaged parts to achieve a uniform appearance. Further, while the insurer will pay to repair a damaged wall, it will not pay to replace wall coverings such as paint on adjoining walls.
Therefore, while the insurer must seek to paint the ceiling in a colour that reasonably matches the walls, it is not required to repaint the walls.
Bathroom and WC (first floor)
The complainant says there has been ongoing water ingress through the flooring and walls shared by the upstairs bathroom, WC, and bedroom 1. She says the bathroom walls, flooring and impacted fixtures (including the vanity and mirror) must be replaced. The WC walls and flooring has also been compromised. Further, that floor tiling must be removed to allow assessment and repair of the subfloor and waterproofing.
SE’s SOW allows for replacement of the bathroom and WC ceilings, and for painting the WC walls. SE says when it inspected the home on 27 March 2025, it did not identify any other event related damage to the bathroom/WC. It did, however, find aged deterioration to the tile grouting.
The insurer says in the absence of supporting expert evidence, it is unable to cover the additional reinstatement works sought. The insurer otherwise notes that SE’s SOW includes an allowance to inspect bedroom 1’s rear wall framing for damage after the roof cladding and wall lining removed. It says if there is event related damage present, that will be repaired.
I accept the insurer’s position as reasonable. However, the insurer is also to allow for inspection of the wall framing of the bathroom and WC to the extent they are exposed after the roof cladding and bedroom 1 wall lining is removed. Any top-down (that is, from above) water ingress damage is to be covered.
Dining/kitchen/living area (first floor)
The complainant says the insurer should match flooring throughout the first floor. She says if the insurer only replaces the flooring in bedroom 1, a visual and material inconsistency will be created and that is unreasonable and unfair.
The PDS confirms on page 59 that the insurer will replace internal undamaged flooring up to an existing change or join in the flooring, or an archway, doorway or similar opening, whichever is closest to the damaged flooring. However, the policy does not cover the cost to replace undamaged flooring in any other adjoining rooms, hallways or stairways.
There is a doorway separating bedroom 1 from the rest of the first floor. Therefore, the insurer is not required to replace the undamaged flooring in the dining/kitchen/living area. However, it is make all reasonable efforts to match the flooring for a consistent appearance.
Bedroom 1 (first floor)
The complainant wants a formal design plan to be provided to her for sign off before repair work in bedroom 1 commences.
The insurer says its trades ‘will work with the complainant in relation to design plans prior to the commencement of works’.
The parties are required to work together to reach agreement on a reasonable design plan before the bedroom 1 works commence, and to document the agreed plan.
Furniture removal and storage
The insurer says SE’s SOW allows for the removal and storage of contents items to facilitate building repairs. It submits that the extent to which items must be removed and stored offsite is to be determined once repairs are due to commence.
The complainant says the insurer previously agreed to removal and offsite storage of all household furniture and items due to the scale of the necessary repair works and lack of secure storage during construction.
SE’s SOW allows for the removal and storage of all contents items, including furniture, from the dining/kitchen/living area, bedroom 1 and bedroom 2 to facilitate repairs. However, the SOW also says small/loose contents are to remain on site.
The meaning of ‘small/loose contents’ is unclear, as is how they and the contents of other rooms are to be stored securely on site. I am also mindful that the necessary repairs will generate significant dust and fumes. It is also likely additional work potentially affecting other rooms will be identified once repairs commence.
In the circumstances, I am satisfied that it is reasonable to require the insurer to remove and store offsite all contents, subject to the policy terms.
Other matters
If the complainant accepts this determination, the insurer is to provide her within 14 days with a full written outline of the repairs it has agreed to attend to and which it is required to attend to under this determination. It is also to arrange for a building contract reflecting those works to be provided to her as soon as reasonably practicable.
The insurer is to pay for TA in line with the terms of the agreement.
The lifetime guarantee set out on pages 60 and 61 of the PDS will apply to the repairs.
2.2 Is more non-financial loss compensation payable?
Yes. The insurer is to pay a further $1,300 in non-financial compensation for stress and inconvenience caused by its poor claim handling and delays since 7 March 2025.
AFCA can award compensation for non-financial loss
Under paragraph D.3.3 of the AFCA Rules, I may award up to $6,300 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer is required to pay more non-financial loss compensation
The insurer’s claim handling has been poor, has led to multiple avoidable delays, and has fallen well short of generally accepted industry standards.
While I acknowledge that the complainant accepted $5,000 from the insurer for the resulting stress and inconvenience she experienced up to 7 March 2025, the claim handling issues and delays have continued since then. I am satisfied that they have caused the complainant yet more stress and inconvenience.
It is therefore fair and reasonable to require the insurer to pay another $1,300 in non-financial loss compensation.
The complainant also for a period sought compensation for loss of opportunity to sell her home in a favourable market and for medical expenses. It seems that she no longer seeks such indirect financial loss compensation. For the sake of completeness, I confirm I am not satisfied an award of indirect financial loss compensation is justified because:
· the limited information provided is not sufficient to establish the losses claimed or enable their quantification
· the PDS confirms on page 43 that the policy does not cover indirect financial losses.
2.3 Why is the outcome fair?
It is fair that the insurer attends to repairs based on a reasonable assessment of the claim-related damage and that it pays more in compensation due to its poor claim handling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.