Home / IAG / Determination 12-24-179880

Determination 12-24-179880

Insurer declined reimbursement of remediation, waterproofing, ventilation and related works costs following an accepted storm water claim, and complainants sought non-financial loss for claim handling.

FirmIAG
Decided2026-09-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Following an earlier AFCA determination accepting a storm water claim, the complainants sought reimbursement of disputed remediation costs and non-financial loss. AFCA found the disputed works were not shown to be storm-related and the insurer did not mishandle the claim, deciding in favour of the insurer.

Complainants bore the onus to show the disputed works repaired insured storm damage, and the evidence showed they related to maintenance, pre-existing or moisture-management issues, with no unreasonable claim handling.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-179880 | Financial firm | Insurance Manufacturers of Australia Pty Limited Case number: 12-24-179880 4 September 2026 1 Determination overview 1.1 Complaint The complainants hold a home building and contents insurance policy covering listed events and accidental damage (policy) with the financial firm (insurer). In August 2023, they lodged a claim for water and mould damage following a storm/storm water runoff event (insured event). This complaint concerns the insurer’s assessment of costs incurred after an earlier AFCA determination. AFCA found the claim was covered and required the insurer to assess and settle repair and remediation costs under the policy. The complainants say the insurer wrongly declined several costs as maintenance, upgrades or unrelated to the insured event (disputed works). They say the insurer failed to implement the earlier determination. The insurer says it has accepted the costs it considers related to insured damage. Remediation and repair works are ongoing. However, it says it has properly declined items involving maintenance, betterment, wear and tear or matters outside policy cover. The complainants seek reimbursement of the disputed remediation and investigation costs. They also claim compensation for non-financial loss (NFL), citing poor claims handling, delay and an inadequate drying regime. 1.2 Issues and key findings Is the insurer required to reimburse the disputed works? No. I am not satisfied the complainants have shown the disputed works were required to rectify damage caused by the insured event. The exchanged information shows the disputed works relate to maintenance, construction or pre-existing issues. Did the insurer mishandle the claim? No. The complainants say the insurer changed its position, caused delays and used an inadequate drying regime. I am not persuaded the exchanged information shows the insurer acted unreasonably or NFL is warranted. Why is the outcome fair? The outcome is fair because the complainants have not shown the disputed costs were incurred to repair insured damage. I am also not satisfied the insurer acted unreasonably in assessing, investigating, declining those costs or managing the drying regime. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to reimburse the complainants for the disputed works or pay NFL. 2 Reasons for determination 2.1 Is the insurer required to reimburse the disputed works? No. I am not satisfied the complainants have shown the disputed works were required to rectify damage caused by the insured event. The exchanged information shows the disputed works relate to maintenance, construction or pre-existing issues. Complainants have onus to establish a valid claim It is accepted insurance law that the complainants carry the initial onus to establish, on the balance of probabilities (that is more likely than not), a loss which is covered by the terms and conditions of the policy. Only if the complainants can do this will the onus shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise. Policy cover is subject to terms, conditions, and exclusions The policy covers the period from 20 August 2022 to 20 August 2023. Coverage is defined in the product disclosure statement (PDS) and certificate of insurance (COI), which must be read together. There is no dispute the complainants received a copy of the policy documents. The insurer is entitled to rely on the policy terms in assessing the claim. Policy covers insured events and accidental damage The policy covers loss or damage caused by listed events, including storm, flood and rainwater run-off. It also includes optional accidental damage cover for damage caused unintentionally. However, this benefit does not apply where the loss or damage is already covered as a listed event. The policy excludes loss or damage caused by or relating to deterioration, wear and tear, faulty design, failure to maintain and pre-existing damage. The parties agree storm/rainwater run-off caused the accepted moisture and mould damage beneath the home. The dispute is whether the remaining costs are covered as storm-related repairs. Insurer says the disputed works are maintenance or upgrades The insurer accepts the September 2024 AFCA determination established a covered loss and accepts responsibility for the resultant moisture, mould and building damage. It says it has assessed the claim, accepted the claim-related damage and continues to fund remediation and reinstatement works. The insurer says the disputed works are maintenance, moisture-management measures, preventative works or upgrades, rather than repairs to insured damage. Specifically, the insurer says: · ventilation works: > original vents were not damaged > additional vents, fans and ducting are upgrades > the works improved the original design. · rear veranda works: > the veranda was not storm damaged > it was removed for access and ventilation works > replacement was not a covered repair. · mortar remediation: > mortar deterioration arose from long-term moisture > efflorescence supports ongoing exposure > this was separate from accepted insured damage > deterioration and maintenance exclusions apply. · waterproofing: > waterproofing was preventative > the property had no prior external waterproofing > it addressed a pre-existing condition > the policy does not cover betterment. · agricultural drain investigations: > the drain was a maintenance issue > no event damage to the drain was shown > it was not part of the accepted loss. · excavation and associated costs: > these arose from waterproofing and external works > they are not repairs to insured damage. Insurer relies on expert evidence The insurer’s experts accept event-related moisture and mould damage. The insurer says the evidence establishes the disputed works fall outside of cover. The insurer’s reports record: · RC restoration report (10 October 2024): > identified mould-affected subfloor timbers > recorded long-term subfloor water ingress and mould. · CF engineering report (15 October 2024): > stormwater caused subfloor and flooring moisture/mould damage > front and rear decking had been replaced before inspection > the complainants said the joists, bearers and decking boards required replacement due to moisture damage from the insured event > further floor drying was required. · technical assessor (14 March 2025): > mortar/efflorescence resulted from long-term soil moisture > mortar, waterproofing and drain works were maintenance related. · RZ builders’ scope / variations (2025): > scope accepted moisture/mould repairs > mortar repointing and efflorescence works were removed from repair scope. · CF reinspection (10 September 2025): > ventilation, drainage and waterproofing were moisture-management works > elevated moisture remained and further drying and remediation was required > broader drainage and groundwater issues existed. · technical advisor (17 September 2025): > moisture concerns remained despite mitigation > further drying and mould remediation were required. · EH hygienist and post remediation verification (PRV) reports (2025–2026): > PRV was not achieved > mould-affected materials remained and further remediation was required. Complainants say remediation and mitigation costs are covered The complainants say the insurer has incorrectly declined several costs incurred in remediating the property following the insured event. They rely on the previous AFCA determination, which found the: · damage was covered · insurer was: > responsible for repair and remediation costs arising from the insured event > to assess the invoices and determine the extent of its liability under the policy. The complainants say the disputed works were reasonably performed to address insured damage, complete remediation and prevent further damage. In relation to the disputed works, the complainants say: · mortar remediation: > earlier determination rejected seepage/deterioration causation > mortar/efflorescence works were initially in scope > mortar damage was accepted moisture damage. · perimeter waterproofing: > waterproofing was needed to certify wall repairs > its absence was not a defect when built > it flowed from claim-related wall repairs. · agricultural drain investigations: > moisture source had to be identified > the drain was an obvious possible source > the insurer should pay investigation costs. · subfloor ventilation works: > ventilation works dried the subfloor and mould > this was mitigation, not upgrades > AFCA accepted increased ventilation was reasonable > costs arose from event related moisture. · excavation costs: > excavation was needed for perimeter works > the insurer required those works were performed first > related reinstatement costs should be reimbursed. · rear veranda works: > veranda dampness affected drying and access > removal and replacement aided remediation > CF’s engineering report linked decks to storm moisture. Complainants rely on expert reports To support their position, the complainants rely on expert evidence from both parties. Specifically, they cite: · AFCA determination (September 2024): > found an insured event occurred > water became trapped beneath the home and increased subfloor ventilation was a reasonable mitigation measure. · CF engineers report (October 2024): > found the storm event caused moisture and mould damage to the subfloor and flooring > both front and rear decking were moisture damaged by the storm event. · LM inspection report / EL waterproofing report / VBA advice: > concluded external waterproofing was not generally required when the home was built > the absence of waterproofing should not be treated as a historical building defect. · CF reinspection (September 2025): > found elevated moisture remained, further drying and mould remediation were required > ventilation formed part of the drying strategy. · EH hygienist reports (2025–2026): > found mould-affected materials remained, remediation was incomplete > PRV had not been achieved. Evidence does not establish disputed works are event related I have carefully considered the exchanged information. On balance, I am not satisfied the complainants have established the disputed works form part of the insured loss. This is because the evidence supports a distinction between: · storm-caused damage · work required to remediate accepted damage · broader property, drainage and moisture-management issues identified during the claim. Each disputed item has been addressed on this basis. · perimeter mortar deterioration: > the technical assessor attributed the mortar deterioration to long-term soil moisture, not the accepted subfloor damage > the complainant’s bricklayer invoice shows repointing, not what caused the deterioration > LM and EL do not attribute the mortar deterioration to the storm event > RZ later removed these works because the mortar was assessed as long-term deterioration, not storm damage. I am satisfied the issue was identified during the claim. However, I am not persuaded it has been shown to be caused by the insured event. · perimeter waterproofing: > no existing waterproofing system was storm damaged > the VBA, LM and EL evidence address compliance, not storm causation > EL said waterproofing was required before it could certify the mortar repairs. However, it assumed event-related mortar deterioration and did not independently establish the storm caused the need for waterproofing > CF described the works as broader moisture-management measures. I accept the absence of waterproofing is not a defect. However, I am not persuaded the evidence shows the storm created a need to install a new external waterproofing system. · agricultural drain investigations: > the drain may have been relevant to moisture investigation. However, the costs have not been shown to be part of the insured damage > no expert identifies storm damage to the drain or says it caused the accepted damage > the technical assessor treated the drain as maintenance, not storm damage. I acknowledge the drain was investigated. However, I am not satisfied the claimed costs have been shown to repair storm damage. · subfloor ventilation works: > I accept increased ventilation was reasonable. However, I am not satisfied this establishes cover for the installed system > the earlier determination noted the invoices included some maintenance work, and the insurer still had to assess the extent of its liability under the policy > no report identifies storm damage to the original vents > the installed vents, fans, ducting and electrical works exceeded the original design > CF described them as improving airflow and addressing original limits > CF recommended separate drying and dehumidification. The storm required subfloor drying. However, I am not satisfied the evidence shows damage to the vents or cover for the enhanced system under the policy. · excavation and consequential costs: > the excavation and related costs have not been shown to repair storm damage > the plumbing invoice ties related works to the waterproofing excavation > the air-conditioning invoice concerns temporary removal and reinstatement, not storm-damaged equipment > garden and landscaping costs appear to arise from perimeter excavation, not direct storm damage > the insurer’s sequencing requirements do not establish liability for those costs. On balance, the evidence does not establish these costs are storm related. Rather, the available evidence shows these are consequential costs of the waterproofing, drainage and perimeter works, not costs incurred to repair storm damage. · rear veranda works: > CF recorded storm-moisture damage to both decks. However, it did not explain the basis for this conclusion > the complainants say removal was needed for access, drying and ventilation > the original decking was not retained and there is limited evidence of its pre-removal condition > no other expert positively attributed damage to the rear veranda or decking to the storm event > later CF evidence links the decking works to deterioration, access and ventilation. CF’s conclusion is noted. However, the basis for it is not explained. Given the limited evidence about the original decking before replacement, I am not satisfied the rear veranda required replacement because of storm damage. On balance, a valid claim for the disputed works has not been established To establish a valid claim, the complainants must show each disputed cost relates to insured storm damage or is otherwise payable under the policy. I accept the storm caused substantial subfloor moisture and mould damage. However, the fact the complainants incurred the disputed costs during the remediation process does not make those costs storm related. This is because the evidence establishes the disputed costs arose from broader pre-existing ventilation, mortar, drainage and moisture-management issues, not from storm damage to those items. On balance, I am not satisfied the complainants have established the disputed costs are recoverable as storm-related repairs or remediation. The insurer is entitled to decline the disputed works. 2.2 Did the insurer mishandle the claim? No. The complainants say the insurer changed its position, caused delays and used an inadequate drying regime. I am not persuaded the exchanged information shows the insurer acted unreasonably or NFL is warranted. AFCA’s approach to non-financial loss Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim. We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim. We may reduce the amount of compensation we award if the loss was partially caused by the actions of the complainant, or by factors outside the insurer’s control. Complainants say insurer mishandled the claim The complainants say the insurer mishandled the claim following acceptance of indemnity. They say the insurer: · wrongly removed works from the repair scope · required them to undertake external works before repairs progressed · should have undertaken more extensive and timely drying of the subfloor and moisture-affected areas before progressing remediation and reinstatement works · failed to adequately address the ongoing moisture and mould issues affecting the property. They also cite: · the length of the remediation process · the repeated remediation work · the unsuccessful PRV assessments On balance, the insurer has not mishandled the claim I have considered the exchanged information. I am not satisfied the insurer mishandled the claim after accepting indemnity. The complainants disagree with the insurer’s decisions about the disputed works. However, a disagreement about repair scope does not, by itself, show poor claims handling. The evidence shows the insurer continued to: · investigate the loss · obtain expert advice · revise repair scopes · engage builders, engineers, remediation specialists and hygienists. It also funded temporary accommodation after accepting the claim. I acknowledge the complainants advocated for more extensive drying. However, the insurer relied on expert advice that such drying may be ineffective in the confined subfloor environment. It also carried risks, including soil shrinkage and secondary structural damage. Therefore, I am not persuaded the insurer's approach to drying was unreasonable. The complainants say the insurer’s correspondence caused them to feel pressured to complete the external works to avoid a cash settlement. However, I am not satisfied this amounts to claim mishandling. This is because the insurer was entitled to maintain its scope position. I am not satisfied the complainants’ disagreement with the insurer’s position, or their decision to complete works to progress the claim, shows the insurer acted unreasonably. I accept the remediation has been lengthy, frustrating and remains ongoing. However, I am not satisfied this was caused by a failure to actively manage the claim. Rather, the evidence shows the claim has been affected by complex site conditions, including ongoing moisture, mould and subfloor issues, which required further investigation, revised scopes and expert input. The complainants are not entitled to NFL. 2.3 Why is the outcome fair? The outcome is fair because the complainants have not shown the disputed costs were incurred to repair insured damage. I am also not satisfied the insurer acted unreasonably in assessing, investigating, declining those costs or managing the drying regime. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.