The complainant's home was damaged by a tree in a storm and he sought cash settlement on his builder's quote, temporary accommodation and compensation. AFCA found in favour of the insurer, allowing it to obtain an engineer's scope of works and a mould inspection before settling.

The complainant's quotes were not shown to reflect the reasonable cost of repairs from the insured event, so the insurer was entitled to further assessment, and the property was habitable with no compensable mishandling.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authorityno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-179531 | Financial firm | Allianz Australia Insurance Limited Case number: 12-24-179531 28 April 2026 1 Determination overview 1.1 Complaint The complainant holds a home and contents policy with the financial firm (the insurer). On 14 February 2024, he lodged a claim for damage to his property following a storm. The insurer has accepted the claim and has agreed to cash settle the claim at the complainant’s request. However, it says that it needs to further assess the property to progress the claim. The complainant disagrees and says that the insurer should accept his quote and cash settle him for the repairs. He also seeks temporary accommodation (TA) and compensation for stress and inconvenience. The complainant is represented by his brother. For convenience, unless indicated otherwise, reference to ‘the complainant’ will include both. 1.2 Issues and key findings Is the insurer required to accept the complainant’s quote? No. The information does not establish the complainant’s quote most accurately reflects the reasonable cost of repairs. The scope of works (SOW) has not been sufficiently detailed to enable a fair assessment of the insurer’s liability for repairs from the insured event. It is fair that the insurer is allowed to obtain a SOW from an engineer and investigate whether the kitchen cabinetry is affected by mould. Is the complainant entitled to TA? No. The property is currently habitable. However, the insurer should assess whether the complainant requires TA for the repairs. Is the insurer required to pay non-financial loss compensation? No. The insurer has appropriately handled the claim, and no compensation is warranted in all the circumstances. Why is the outcome fair? It would not be fair to require the insurer to cash settle the claim based on the complainant’s quote when it has not had a sufficient opportunity to fully assess the damage from the insured event. It would not be fair to require the insurer to pay TA when the complainant has not incurred this expense and the property remains habitable. 1.3 Determination This determination is in favour of the insurer. Should the complainant accept the determination, the insurer is required to comply with the steps as outlined in 2.1 of the determination. 2 Reasons for determination 2.1 Is the insurer required to accept the complainant’s quote? No. The information does not establish the complainant’s quote most accurately reflects the reasonable cost of repairs. The SOW has not been sufficiently detailed to enable a fair assessment of the insurer’s liability for repairs from the insured event. It is fair that the insurer is allowed to obtain a SOW from an engineer and investigate whether the kitchen cabinetry is affected by mould. Onus on complainant to establish a claimable loss The complainant is required to show, on the balance of probabilities (that is more likely than not), that he suffered a claimable loss under the policy. This means that he must show the loss was caused by a risk for which he is insured. Once the complainant, on balance, establishes a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on balance, the application of the exclusion or condition. The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant. The policy covers damage caused by one or more of the listed events. It does not provide cover for all damage. Amongst these events is cover for Storm and Impact damage. There is no dispute that the complainant’s property suffered damage when it was impacted by a tree on 13 February 2024. Therefore, I am satisfied that the complainant has established that the loss and damage is of a type covered by the policy. However, the coverage remains subject to the terms, exclusions and conditions of the policy. The insurer has accepted the claim. However, the parties dispute the SOW. The complainant seeks a cash settlement based on his quote and SOW. He is now refusing access to the insurer’s trades. The insurer says that it is unable to assess the new damage claimed by the complainant without further inspections and therefore cannot progress the claim. Complainant seeks cash settlement of claim The complainant says that the insurer should accept his SOW which have been prepared following site inspections by an engineer (MS). He says MS was approved by the insurer. The complainant has provided several repair quotes for which he is seeking cover under the policy. These include: · a quote dated 31 March 2025 from his builder JL said to be based on the SOW prepared by MS. The quote is in the amount of $259,278.80 (incl GST). It includes a builders’ margin of 21% · a quote from builder DB dated 11 March 2025 in the amount of $243,262.50 (excl GST), and including a builder’s margin of 20% · a quote from MD dated 16 September 2024 in the amount of $11,700 for: > the installation of fan and lights, mould treatment, frame inspection and repairs > shower room, toilet and sink and plaster replacement > paint. · a quote from BW for replacement of the kitchen (including appliances) for $18,789.48 · a quote for demolition and installation of the kitchen from LF for $10,389. The complainant says: · the insurer should cash settle him based on JL’s quote · the insurer has had sufficient opportunity to assess the damage from the insured event · the insurer has provided four different variations of a SOW which he says have been manifestly inadequate. These SOW’s were only amended after he has challenged their accuracy · there is sufficient information present for the insurer to finalise the claim without further attendances at the property. Insurer has obtained expert reports to assess damage Following the lodgement of the claim, the insurer appointed an assessor (CR), to inspect and assess the claim. CR attended on 19 February 2024 and noted damage to the following areas: · roof tiles, gutters and insulation · paintwork to ceiling and one wall in the kitchen, lounge and master bedroom · internal and boundary fence · roof sheets to garage · brickwork to letter box. CR noted that concerns were raised by the complainant that: · the roof trusses had been damaged by the tree causing subsequent impact through to wall frames and footings beneath the concrete slab · this had caused heave in the external paving around the property · the external concrete paving in the courtyard areas, including a gas light style lantern were damaged · the heave in the concrete path caused binding of the entry door to the courtyard · there was impact damage to windows in the master bedroom. CR says that it was unable to confirm if the damage noted by the complainant was related to the insured event. The insurer agreed for the complainant to appoint his preferred engineer (MS). There was confusion between the parties in relation to the engineer who had been appointed. The insurer had thought that the engineer appointed was another engineer with similar initials. Despite this, the insurer paid for the report from the complainant’s preferred engineer, MS. MS attended the property on 22 March 2024 and provided a report dated 7 April 2024. MS noted: · the external western wall supporting the primary roof framing has incurred damage due to the fallen tree which has imposed a significant load · there was damage to the fence, plantar wall, roof tiles and gutters · recommended the structural integrity of the affected wall and roof framing be evaluated to assess any potential damage or structural compromise. Further attendance by MS was arranged following concerns raised by the complainant that water ingress beneath the leaking gutter was affecting the tiles and footpath beneath it. In a further report from MS dated 10 December 2024, it notes: · the pavement had become dislodged directly below the eaves gutter, with loose tiles in the affected area · these conditions allow water ingress into the subbase area of the tiling and pavement · the concrete pavement panels adjacent to the leaking gutter showed signs of movement, with visible cracking at the control joint · given the proximity to the source of water ingress, it is likely that the underlying soil has been affected by the localised saturation, leading to the displacement of the pavement panels. MS recommended that the dislocated pavement and panels be reinstalled or replaced with appropriate drainage, repair of damaged roof gutters and missing roof tiles to be reinstated. It also recommended inspection of adjacent structural components including the strip footing. This was to ensure no additional deterioration occurred due to the extended water exposure. Following concerns raised by the complainant of mould contamination in the property, particularly the bathroom, the insurer appointed a restorer (RX) to inspect the property. RX attended on 20 December 2024. RX found no elevated moisture readings within the ceiling and wall linings of the kitchen and ensuite. Elevated moisture was found to the kitchen kickers around the oven. RX recommended the removal of the kickers and inspection holes to be cut to determine if there was any concealed damage under/behind the kitchen cabinetry. Insurer says further inspections are required The insurer has obtained quotes from its builder UB. A summary of these quotes is provided in section 3.2. The latest quote from UB is dated 19 November 2024 in the amount of $98,690.46. The insurer recognises that the quote from UB is incomplete. It says that to obtain an accurate quote for settlement, it requires an itemised SOW from a qualified engineer and confirmation of mould remediation requirements. It says that this is necessary as: · the reports from MS are visual and do not provide sufficient information as to the extent of the structural damage. Also, they do not provide any detailed information regarding the internals of the property · there is insufficient information to prepare an accurate SOW · the complainant has reported potential internal damage to the kitchen cabinetry which has not been assessed by a builder · RX reported elevated moisture behind the kitchen kickers and invasive testing was recommended but not conducted The insurer requested the complainant provide copies of an assessment undertaken by JL which it says would have been necessary as a basis for its quote. The complainant did not provide this. It says that it is impossible for it to provide a fair and reasonable estimate of the insured damage unless the complainant consents to a further inspection and assessment by its engineer, builder and restoration expert. The insurer proposed: · to have RX attend the property within 5 business days to complete a mould investigation report regarding the kitchen cabinetry · should a strip out of the kitchen be required, it would undertake this within five days of receiving advice from RX · on completion of any remediation, LC, an engineer is to inspect the property and provide a detailed SOW that considers all required reinstatement repairs related to the claimed event · at the insurer’s cost, it would have MS attend a dual assessment with LC · upon obtaining a SOW from LC, it would obtain two quotes for validation · a cash settlement will be provided to the complainant. Complainant has continued to refuse access to the insurer’s trades to assess The complainant has continued to refuse access to the insurer’s trades. The complainant says that the insurer’s restorer RX has already had the opportunity to assess the property. He says that the insurer’s push for an invasive inspection, more than a year after the damage, is an attempt to contradict previously accepted findings. He does not believe this will be a genuine reassessment. The complainant says the insurer accepted the appointment of MS and it is now disingenuous for it not to rely on its findings. The complainant says that MS has provided sufficient advice and technical information to prepare the SOW. He says that the insurer is requesting highly invasive and destructive inspections including removal of the ceilings, excavating the footings which would make the home unliveable. The complainant says that the insurer had advised him that invasive inspections were not permitted. However, now the insurer seeks to insist on one. The complainant refers to email correspondence with the insurer dated 11 November 2024. He says the insurer advised that a variation could be sought if damage to the roof rafters was found following inspection by an engineer (with an allowance for an engineer’s attendance included in the SOW). The complainant says: · the insurer’s request to engage a new engineer (LC) is unjustified and deceptive · any assessment conducted after such a delay relies on speculative assumptions rather than contemporaneous evidence · moisture damage, timber decay and structural degradation cannot be assessed reliably without early intervention · the Engineers Australia’s Code of Ethics and AS ISO 31000:2018 require that assessments be timely and evidence based · rewriting findings now undermines professional integrity · further inspections cause further delays · AFCA does not endorse repeat reassessments that do not serve a fair and reasonable outcome. The complainant maintains that the quote from JL should be accepted by the insurer. Cash settlement should reflect the reasonable cost of repairs Under the terms of the policy, the insurer may settle a claim for damage to the complainant’s property by: · repairing the damage or rebuilding the property, or · paying the complainant the reasonable cost of doing so. In this case, the insurer has given the complainant the choice, and the complainant opted for a cash settlement. Where a claim is to be settled by a cash settlement, the insurer is required to pay the complainant the reasonable cost of repairing the damage to the property. This means the cash settlement amount should be sufficient to ensure that the complainant is able to engage his own contractors to complete the necessary repairs. Scope of works is not sufficient The complainant says the quotes obtained by him are based on a SOW prepared by the engineer, MS. However, the report from MS notes that further inspections and assessments are required. These inspections and assessments include: · an inspection of the underlying roof structure to check whether any timber members have been damaged by impact or water ingress · assessing whether the northern and western perimeter walls have lost vertical alignment · assessing the boundary fence to determine the extent of the damage and what remedial measures are required to restore the fence’s structural integrity and usability. This includes an inspection of any damaged members and connections · assessment by a geotechnical consultant to assess whether the soil located under the displaced eaves gutter has suffered a loss of bearing capacity because of prolonged water ingress into the subbase area of tiling and pavement · inspection of the strip footing to assess whether there has been any deterioration due to extended water exposure. The complainant’s quotes from both JL and DG include costings for a geotechnical engineer and engineer. The quotes provide that the replacement of the pavement tiles and relevant paving is to comply with the requirements provided by both the geotechnical engineer and engineer. However, it is unknown if the quote has allowed for these requirements or provided for additional weightings to the quote, noting that the costs are considerably higher than those provided by UB. The quote from JL also provides for engineering drawings of the front fence. However, MS has not stated that the fence needed to be replaced, rather it needed further inspection. The quote from JL includes the engagement of an engineer to assess the stability of the fence and compliance. I am therefore not persuaded that the costing for the fence is accurate given the number of potential variances. The quote from JL includes the repairs to a retaining wall and the engagement of an engineer for design advice. The wall in question is described by MS as a plantar wall which was constructed as a single brick cantilever wall. The policy provides for the repairing of the damaged part of the building to the same condition as when it was new, not better. The quote from JL also includes $31,460 for an ‘Environmental impact assessment and mitigation’. No information has been provided as to what this relates to, noting that the property is an existing property in a suburban area. JL’s quote also includes $5,000 for structural engineer compliance documentation following repairs to the kitchen. However, the insurer has been unable to assess the extent of the damage as the complainant has refused access to inspect further. It is therefore unknown whether compliance from an engineer is required. The insurer has acknowledged that its quote from UB is incomplete and therefore has requested the attendance of an engineer and restorer to further assess the damage. UB’s SOW refers to the requirement for the roof cavity and rafters to be inspected. It provides that if a broken rafter is found, an engineer and surveyor would be required. The complainant’s quotes allow for the replacement of the aluminium windows. However, UB’s allows for the replacement of the seal only and then allows for further testing to check for water leaking. The quotes from UB and JL are too far apart to use as a basis for determining the appropriate cash settlement. It is clear that UB’s quote does not represent the full extent of damage to be covered under the claim. While I am satisfied JL’s quote includes amounts that appear excessive and/or works that have not been shown to be arise from the claimed insured event. Also, that JL’s quote does not account for additional inspections and/or repairs recommended by MS. I am satisfied that given the limitations of the SOW and JL’s quote as noted above, that it is fair in the circumstances that the insurer is permitted to conduct further assessments of the damage. I am not satisfied that there is any benefit to having a dual assessment as proposed by the insurer. Should the complainant accept the determination, the insurer is to appoint an engineer who has not previously been involved in the claim to prepare a SOW that includes everything in dispute. That includes an assessment of: · the roof rafters · whether a geotechnical engineer is required to assess the soil · whether the footings need to be inspected · whether the fences are repairable or need to be rebuilt (and therefore whether designs are required). The insurer’s request for the attendance of RX to inspect behind the kickboards in the kitchen to determine if there is mould is reasonable. Should the complainant accept the determination, the insurer is to: · within seven days of being notified of the complainant’s acceptance, the insurer is to engage RX to attend the property and complete a mould investigation report regarding the kitchen cabinetry · within seven days of RX’s attendance, should RX determine that a strip out of the kitchen is required, the insurer is to undertake this and place the complainant in TA until the insurer has cash settled the claim · within fourteen days of being notified of the complainant’s acceptance, the insurer is required to provide a list of three engineers, who have had not had any prior involvement with this claim, to the complainant · within seven days of receiving the list of engineers, the complainant is required to communicate his preferred choice to the insurer · within fourteen days of being notified of the complainant’s chosen engineer, the insurer is to engage the chosen engineer to prepare a SOW for all damage (as noted above) · within fourteen days of receiving the SOW from the engineer, the insurer is required to engage two builders to provide actionable quotes · the builders are to comment on whether TA is required during the repairs and if so, the period of TA required · within fourteen days of receiving the quotes from the builders (whichever is the latest in time), the insurer is to cash settle the complainant based on an average of these two quotes, with a 10% uplift for contingencies and the loss of a lifetime guarantee on repairs · if the builders determine that TA is required, the insurer is required to cash settle the complainant for TA in accordance with its policy terms. 2.2 Is the complainant entitled to TA? No. The property is currently habitable. However, the insurer should assess whether the complainant requires TA for the repairs. Complainant says that home was uninhabitable The complainant says that the home was uninhabitable as: · he did not have a functioning oven and microwave · the front door could not be locked securely due to storm damage · electricity to part of the home was disconnected · he was unable to heat the home. Insurer says that TA is not required Page 38 of the PDS provides that TA is provided if the home is damaged by an insured event to such an extent that it can’t be lived in. The insurer says that the property is habitable. It relies on the assessment from its assessor C and RX to confirm the same, including during repairs. It says that the complainant has not provided any information to support his claim that the property is unliveable. Further, it says that it paid $5,000 to the complainant for TA on 15 February 2024. However, the complainant has not provided any evidence that he has incurred costs of TA. The insurer says that it cash settled the complainant for the spilt system air conditioning unit in November 2024. Complainant is not currently entitled to TA I acknowledge that the current condition of the property may be uncomfortable as the complainant is unable to enjoy all the facilities of the property including some lighting, and cooking facilities. However, the photographs of the kitchen clearly show numerous other cooking devices such as an air fryer and slow cooker that were being used by the complainant. I am not satisfied that the loss of use of an oven or some lighting renders the property unliveable as required under the policy terms. Further, the reference to the door being unable to be secured is the front gate. I am not satisfied that this renders the property uninhabitable. I acknowledge that a lack of heating from the spilt system over the winter months also made living conditions difficult. However, the insurer has now cash settled the complainant for this item. There is no information to show that the complainant incurred TA costs in these winter months. That is, he continued to reside at the property despite having received a cash settlement of $5,000 for TA. However, as noted above, if the complainant accepts the determination, the insurer is to obtain a SOW and actionable quotes from builders. The builders are to assess whether TA will be required for the repairs. If so, the insurer is to cash settle the complainant in accordance with its policy terms for the repair period less the previously issued payment of $5,000 for TA (unless the complainant can show these funds had been used for the purpose of TA). If the assessment by RX determines that there is mould in the kitchen cabinetry that requires its removal, the insurer is to place the complainant in TA until it cash settles the claim. 2.3 Is the complainant entitled to non-financial loss compensation? No. The insurer has appropriately handled the claim, and no compensation is warranted in all the circumstances. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Complainant says insurer mishandled the claim The complainant has raised several allegations against the insurer, including: · breach of duty of utmost good faith (section 13 of the Insurance Contracts Act 1984 (Cth)) · breach of the Australian Consumer Law (misleading and deceptive conduct) · breach of the General Insurance Code of Conduct The complainant says that the insurer replaced all case managers who had accepted MS’s report with case managers who engaged in harassment, unrecorded calls and the fabrication of false narratives designed to mislead AFCA. The complainant says that the insurer’s actions caused them to suffer severe financial hardship. He says that he was forced to endure prolonged periods without heating or a usable kitchen. He says that this has resulted in significant stress. The complainant says that the insurer engaged in misleading and deceptive conduct. He says that the insurer incorrectly advised him that a building permit was not required in relation to fencing which was incorrect. He says that this also caused significant stress to the complainant. The complainant claims the maximum compensation of $6,300. Insurer not required to compensate the complainant These allegations raised by the complainant are serious and require persuasive evidence before I would accept them. They are not supported by the available information. On balance, I am satisfied the insurer handled the claim in line with accepted standards, supported by its timeline and interactions. While the complainant found the process stressful, I am not satisfied that the insurer caused undue stress beyond what is typical in such claims. The complainant (via his representative) has caused the unreasonable delays in refusing access to trades to assess the damage. This occurred in the initial stages of the claim when access to the garage was refused by the complainant. This has continued with the complainant refusing access to the insurer’s engineers for further assessment of the damage. I acknowledge that the insurer’s communication could have been clearer. This may have eliminated the confusion in relation to the appointment of the engineer. Also, clearer communication may have avoided the complainant obtaining a second quote. However, I am not satisfied that this is a sufficient basis to award compensation. 2.4 Why is the outcome fair? It would not be fair to require the insurer to cash settle the claim based on the complainant’s quote when it has not had a sufficient opportunity to fully assess the damage from the insured event. It would not be fair to require the insurer to pay TA when the complainant has not incurred this expense and the property remains habitable. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Builders’ repair quotes | Quote | Total repair cost (inc GST) | Insurer’s builder (UB) 30 May 2024 | $57,295.26 | Insurer’s builder (UB) 30 May 2024 | $81,253.26 | Insurer’s builder (UB) 19 November 2024 | $85,127.46 | Insurer’s builder (UB) 19 November 2024 | $98,690.46 | Complainant’s (MG) 16 September 2024 | $11,770.00 | Complainant’s (BW) 18 September 2024 | $18,289.48 | Complainant’s (LF) 4 October 2024 | $10,389.00 | Complainant’s (DB) 12 March 2025 | $267,588.75 | Complainant’s (JL) 31 March 2025 | $259,278.60 | · Record | · Key points | · Financial firm’s expert (A) · Report · dd-mm-yyyy | · Point 1 · Point 2 · Point 3 | · Complainant’s expert (B) · Report · dd-mm-yyyy | · Point 1 · Point 2 · Point 3

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.