Home / Allianz Australia / Determination 12-24-178183

Determination 12-24-178183

Denial of storm claim for collapsed ceiling (lack of maintenance exclusion), claim 2 excess exceeding repair cost, and poor claims handling

FirmAllianz Australia
Decided2025-12-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed—
SourceAFCA PDF

Summary

Complainants' storm claim for a collapsed ceiling was denied for lack of maintenance and a second water claim fell below the excess. AFCA upheld both settlement decisions but ordered $2,500 non-financial loss and reimbursement of expert report fees with interest due to poor claims handling.

Lack of maintenance was the likely proximate cause so the exclusion applied, but the insurer's deficient loss assessor report and poor communication caused avoidable stress and expert costs.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-178183 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-24-178183 20 November 2025 1 Determination overview 1.1 Complaint The complainants lodged several claims under their home insurance policy with the financial firm (insurer) for damage to their home following a storm. The insurer denied the claim for a collapsed ceiling and contents (claim 1) because it says the proximate cause was lack of maintenance, which is excluded under the policy. It says the excess for another claim for water damage (claim 2) was more than the cost to repair the damage. The complainants seek compensation for the distress and inconvenience they say the insurer’s poor claims handling (including delays and poor communication) caused. They also dispute the insurer’s decisions about their claims. 1.2 Issues and key findings Is the insurer’s settlement of both claims reasonable? Yes, the insurer was entitled to deny claim 1 because the claimed damage was likely caused by lack of maintenance, which is excluded under the policy. I accept the claim excess for claim 2 is likely more than the cost to repair the claimed damage. Is the insurer required to pay compensation? Yes. The poor quality of the initial version of the insurer’s loss assessor’s report caused unnecessary delays, stress and inconvenience for the complainants. Is the insurer required to pay expert fees? Yes. It was reasonable for the complainants to obtain their own expert reports because the early versions of the insurer’s loss assessor’s report were of poor quality. Why is the outcome fair? The insurer’s denial of the claim 1 and settlement of claim 2 are fair because they are in line with the terms and conditions of the policy to which both parties agreed. It is fair for the insurer to compensate the complainants because its claims handling (including shortfalls in its expert assessment and reports) led to avoidable stress and costs for the complainants. 1.3 Determination This determination is substantially in favour of the insurer. As explained in sections 2.2 and 2.3 of this determination, if the complainants accept this determination the insurer is required to: · pay the complainants $2,500 compensation for non-financial loss · reimburse the complainants for expert fees, plus interest. 2 Reasons for determination 2.1 Is the insurer’s settlement of both claims reasonable? Yes, the insurer was entitled to deny claim 1 because the claimed damage was likely caused by lack of maintenance, which is excluded under the policy. I accept the claim excess for claim 2 is likely more than the cost to repair the claimed damage. Complainant has initial onus to establish a valid claim The initial onus is with the complainants to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid claim. The policy is an ‘insured events’ policy. This means only damage caused by specific events, such as storm or ‘liquid damage’, is covered. When an insurance policy uses the term ‘caused by’, this typically means proximate cause. Proximate cause is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. To establish valid claims in this case, the exchanged information for: · claim 1 must show the damage was caused by a storm · claim 2 must show the damage was caused by water bursting, leaking, discharging, or overflowing from the bath. Once the complainants have established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. Relevant to claim 1, the policy excludes damage caused by wear and tear, including lack of maintenance. Claim 1: Complainants say storm caused collapsed ceiling The complainants say a storm, including 10–20 mm of rainfall, caused the collapse of the ceiling on the second storey and damage to contents inside. To support their claim, the complainants provided: · Bureau of Meteorology data confirming storm activity at the relevant time · two reports from roofer (FC), with FC’s second report indicating the storm may have caused a cracked tile due to a tree branch falling on the roof, which may have created an opening for water ingress leading to the ceiling collapse. Exchanged information shows lack of maintenance was likely proximate cause The parties agree there was a storm at the relevant time. However, the insurer says that the proximate cause of the damage was lack of maintenance. The insurer relies on a report from its loss assessor (CC) that found: · lack of maintenance in the form of extensive debris and vegetation obstructing the roof valleys · water pooling due to blocked drainage · water overflow from the area where there was extensive debris · this overflow directed toward the cracked tile, which plausibly lead to the water ingress. I find CC’s findings more credible than FC’s because: · CC’s findings were appropriately supported by photographs showing: > extensive debris and a cracked tile in the relevant roof area. > internal damage that was localised, directly beneath the affected roof section · no evidence of widespread storm-related damage elsewhere on the second level · CC inspected the property shortly after the storm, making their findings about the condition of the roof more reliable than FC’s (with FC inspecting the roof several months later, after the roof had been cleared during make-safe works). I do not accept the finding in FC’s second report that the storm likely caused the collapsed ceiling when a tree branch fell on the roof beneath the solar panels cracking a tile and creating an opening for the water ingress. This is because: · FC’s photographs showing a tree branch in the relevant area are not consistent with CC’s photographs that were taken shortly after the storm, which show no branch in that area · FC’s second report contradicts its first report, which says (for instance) that there was no evidence that broken tiles contributed to the water ingress or ceiling collapse. Insurer entitled to deny claim 1 In these circumstances, the exchanged information: · does not support the storm being the likely cause of the collapsed ceiling · shows the lack of maintenance was most likely the proximate cause of this damage. Therefore, the insurer is entitled to deny claim 1. Insurer’s assessment of claim 2 reasonable On the insurer’s advice, the complainants lodged a second claim for water staining and leaking from the downstairs study ceiling, located below a bathroom. The insurer: · accepted a leak in the bath was the likely cause of the damage to the downstairs ceiling · arranged for a trade to seal the water damaged plaster because it identified a small amount of mould on the plaster ceiling · assessed the cost to repair the resultant damage for the leak to be less than the excess payable for the claim. Based on the exchanged information (including a leak detection report and a repair quote) I am satisfied the policy provides cover for the resultant damage. The parties do not dispute this. I am also satisfied the cost to repair the resultant damage to the downstairs study ceiling is likely less than the excess. This is because the insurer’s repair quote appears reasonable, and the complainants have not provided sufficient evidence to show otherwise. I acknowledge the insurer’s repair quote did not include the cost to repair or replace any defective parts that caused the loss or damage. However, it is not required to cover this as it excluded under the policy. 2.2 Is the insurer required to pay compensation? Yes. The poor quality of the initial version of the insurer’s loss assessor’s report caused unnecessary delays, stress and inconvenience for the complainants. AFCA can award compensation for non-financial loss Under the AFCA Rules, we may award up to $6,300 compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: · physical inconvenience · time taken to resolve the situation · interference with the complainant’s expectation of enjoyment or peace of mind. We recognise that making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. Therefore, we will not award compensation for the ordinary amount of inconvenience that comes with making a claim or when a problem arises. Insurer’s claims handling caused avoidable stress, cost and inconvenience The complainants say the insurer’s delays and poor communication caused them significant stress, cost, and inconvenience. I accept this. The initial version of CC’s report lacked sufficient detail and reasoning to establish that the relevant exclusion applied. For example, the photographs were uncaptioned and therefore unreliable and of limited use. CC’s report was only updated to add the necessary level of detail six months later, after the complainants obtained their own expert report and complained to AFCA. This caused avoidable delays and stress for the complainants. The complainants and their young child lived in a damaged home longer than necessary, leading to considerable anxiety and inconvenience. Based on the exchanged information, I am also satisfied the insurer failed to communicate effectively or take a proactive approach to address the complainants’ concerns. Within 14 days of being notified of the complainant’s acceptance of this determination the insurer is required to pay the complainants $2,500 compensation for non-financial loss. 2.3 Is the insurer required to pay expert fees? Yes. It was reasonable for the complainants to obtain their own expert reports because the early versions of the insurer’s loss assessor’s report were of poor quality. Insurer to reimburse complainant for expert costs Under the AFCA Rules, AFCA can require a financial firm to contribute to legal and other professional costs complainants incur in making a complaint. In considering whether the insurer should contribute to the complainants’ costs, AFCA considers the complexity of the complaint, whether the complainant needed to incur the costs to understand or establish their claim, and whether the costs are reasonable in the circumstances. I acknowledge the complainant’s expert reports did not establish that the complainants were entitled to cover under the policy. However, because of the poor quality of the first version of CC’s report and the insurer’s failure to adequately respond to the complainant’s concerns, it was necessary for the complainants to obtain their own expert reports to understand their claim. The costs they incurred in doing so were reasonable in the circumstances. I acknowledge FC’s second report lacked credibility. However, it was reasonable for the complainants to obtain it due to valid concerns about the reliability of the insurer’s evidence. The complainants should provide the insurer with paid invoices for the expert fees. Within 14 days of receiving these, the insurer must: · reimburse the cost of each expert report (up to a total of $5,000); and · pay interest on each fee under section 57 of the Insurance Contracts Act 1984 (Cth), from ten days after it receives the invoices to the payment date. 2.4 Why is the outcome fair? The insurer’s denial of the claim 1 and settlement of claim 2 are fair because they are in line with the terms and conditions of the policy to which both parties agreed. It is fair for the insurer to compensate the complainants because its claims handling (including shortfalls in its expert assessment and reports) led to avoidable stress and costs for the complainants. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.