Home / Allianz Australia / Determination 12-24-176053

Determination 12-24-176053

Decline of storm damage claim for building damage attributed to subsidence

FirmAllianz Australia
Decided2026-01-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for building damage (ceiling collapse, slab movement) on 19 March 2024, attributed to a storm on 2 January 2024. AFCA found for the insurer, as the damage was not within the policy's 72-hour soil movement cover and was excluded.

Even accepting the complainant's expert, subsidence occurring months after the storm falls outside the 72-hour requirement, so there is no valid claim and the soil movement exclusion applies.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-176053 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-24-176053 12 January 2026 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer) in Victoria. The complainant lodged a claim for damage to his home which he said was due to a storm. The insurer declined the claim. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The complainant has not established a valid claim and, alternatively, it was excluded under the policy. Why is the outcome fair? The outcome is fair because the insurer is entitled to rely on the terms and conditions of the policy to determine its obligations regarding the claim. 1.3 Determination The Determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint. 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. The complainant has not established a valid claim and, alternatively, it was excluded under the policy. Coverage of the policy The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and the Policy Schedule (Schedule) (together referred to as the policy). The policy was provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant. Complainant has the initial onus to establish a valid claim The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a valid (or prima facie) claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy. Policy covered storm, rainwater and run off subject to exclusions The policy provided cover for storm, cyclone, rainwater or run-off (page 17): ✔ Loss or damage caused by: • storm • cyclone* • rainwater • run-off.. *A 72-hour exclusion period applies for loss or damage caused by cyclone – see page 11 for details. ✔ Loss or damage caused by or arising from: • soil movement, including erosion • landslide • mudslide, or • subsidence if it is caused directly by and occurs within 72 hours of a storm. The policy was subject to a general exclusion: Soil movement Including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood The complainant did not have cover for accidental damage. Complainant made a claim for storm damage due to a storm in January 2024 The complainant made a claim for storm damage to the home studio which occurred on 2 January 2024 and which the insurer had accepted. On 19 May 2024 the complainant lodged a further claim for damage to the building, including the bulging and collapse of the ceiling in the upstairs living room. On 12 May 2025 the complainant said: On the 1st, 2nd and 3rd of January 2024 we experienced torrential rains together with hail showers that were record breaking for the southeast suburbs. On the 2nd of January a claim for damage caused by significant inundation of water to the music room where rainwater had flowed across the entire slab floor was subsequently fully authorized by [the insurer] claim [number]. Several engineers and builders sent to assess the situation concluded that yes, the claim had valid standing and accordingly [the insurer] appointed to reinstate what was thought to be the extent of the damage. The initial claim and damage at the time was isolated to the music room at this time. However it seems obvious that the water inundation had in fact undermined the slab and foundation of the main house at this time too. .. The collapse of the ceiling on the 19th of March [2024] providing the effect from rainwater accessing the underside of the slab and destabilizing the structure. A massive shift of weight to the rear of the building further caused a dangerous situation where the trusses buckled, and the ceiling collapsed as a result. At 3:30 pm at this exact moment a crack appeared in the slab running parallel with the rainwater affected rear of the dwelling. Directly above the crack in the slab, cracks in wall plaster and the upper floor ceiling collapsed. Roof truss bottom chords protrude through the plaster ceiling and cornice, observed after the sudden collapse, consistent with and responding to the structural movement related to the “sudden drop “directly relating to the extraordinary rainwater event that commenced (01/01/2024,02/01/2024,) On 18 July 2025 the complainant said: My claim focuses on the severe storm and rain activity that occurred on 02/01/2024 the rain was so intense that it inundated my music studio. The entire area's stormwater reticulation system backed up from the sheer volume the road at the front and back of the house was running 100 mm deep. The dwelling is fitted with more than adequate drainage and had never experienced the nature of this storm event prior to 02/01/2024 or since. The rainwater took the natural course of the land and entered the sub slab area from the rear of the house weakening the soil which caused the following failure and subsequent collapse and damage. Complainant’s expert said storm event in January 2024 caused damage on 19 March 2024 The complainant provided a report from AR, engineer, dated 18 July 2024. AR said that ‘Evidence suggests that it is likely that the event on 19/3/2024 at 3.30 pm that a major subsidence occurred’ and that the sub strata had been inundated which caused displacement and resulted in the slab to suddenly drop. The complainant provided a supplementary report from AR dated 24 October 2025. In AR’s supplementary report, AR said: · a storm of this magnitude would have caused the seepage of water under the rear slab which would create this destabilisation · the rainwater generated by the severe storm event that occurred on the 2nd day of January 2024 was likely to have been responsible for subsequent damage that occurred · the deluge formed by the severe storm and excessive rain event had caused a studio at the rear of the dwelling to sustain significant rainwater inundation and damage which had not ever been experienced ever before, indicating the severity of the rain event, consistent with the meteorological report for that day · the natural gradient from the inundated studio down the slope together with the deluge of rainfall at the property was naturally going to the reticulation system and hitting the rear of the dwelling and subsequently able to gain access, and inundating the area getting under the slab, which provides a causation element · this had caused a cantilever force causing structural damage to the roof including trusses breaking through the plaster. · the effect from the excessive rainwater inundation was that the weight of the dwelling to the rear caused the house to drop. Insurer provided experts reports The insurer provided the following experts’ reports: · JL, builder, dated 19 March 2024 which concluded, based on a roofer’s report from MR: > the cause of the damage to the plaster was not a result of a roof leak > the cracks throughout the home, including on the tiles, plasterboard ceiling/ walls and additional cracks visible in the brickwork have been caused by building movement over an extended period. > an engineer was recommended to be engaged to confirm the cause of the damage · AG, engineer, dated 30 April 2024 which concluded: > none of the damage could be attributed to a single event but was caused by: ‒ Ceiling lining – poor installation and natural soil movement ‒ Dwelling interior – ineffective surface drainage, tree-drying effects and natural soil movement ‒ Garage – ineffective surface drainage, tree-drying effects, natural soil movement and concrete shrinkage · LO, engineer, dated 17 October 2024 which concluded: > review of historical climate data provided by the Bureau of Meteorology at the closest station to the subject site, approximately 6 km from the site, confirms the highest daily rainfall total recorded in January and March 2024 was 52.2 mm and 4.0 mm respectively. It was noted that a daily rainfall total of 80.8 mm was recorded on 4 April 2024 > adverse soil and foundation moisture detected was not caused by a one-off storm or torrential rainfall event > any adverse foundation moisture was being caused by ongoing seasonal rainfall due to inadequate site drainage provisions - this was considered part of the normal seasonal rainfall effects on the foundation soils and was not being caused by a single storm event > the detected building movement and damages had not been caused by a single storm or torrential rainfall event > the observed damage to the building had been caused by stresses induced from building movements due to one or more of the following contributing factors: ‒ long term differential footing movement due to differential moisture content variation in the reactive foundations as a result of one or more of the following contributing factors: ‒ a reduction in moisture content of the reactive clay foundation contributed to by tree root drying effects due to the groups of large sized trees within close proximity to the structure. This was considered a primary contributing factor to footing settlement toward the north and east sides of the building ‒ changes in soil moisture content due to seasonal and climatic effects ‒ long term consolidation of the clay foundations ‒ inadequate founding depth of the existing footing system to alleviate the effects of foundation reactivity subject to abnormal soil moisture conditions caused by the trees within close proximity to the building ‒ potential foundation bearing failure due to saturation of the silty clay soil stratum into which the footings have been founded. This is a potential contributing factor to detected footing settlement toward the east side of the building. The detected soil saturation is being caused by surface and subsurface runoff from nominal rainfall ponding against the building due to inadequate site drainage provisions. long-term dilapidation and normal building stress due to one or more of the contributing factors identified > the observed damage to the ceiling had not been caused by a storm event and there was no evidence that water ingress in the roof had caused the observed failure of the plaster ceiling > the observed damage to the plaster ceiling deflection was due to widespread failure of fixing points and deflection at the upper level resulting in progressive failure of the fixings and eventual detachment under nominal loading conditions Insurer declined the complainant’s claim On 10 May 2024 the insurer declined the claim based on JL, MR and AG’s reports and on 22 November 2024 the insurer maintained its denial based on JL, MR, AG and LO’s report. Insurer was entitled to decline the claim The complainant said that the damage to the building on 19 March 2024 was caused by a storm on 2 January 2024. The insurer had, appropriately, accepted a claim for storm damage to the studio and its contents which had occurred on 2 January 2024. The complainant’s expert in AR’s first report concluded that it was ‘likely that the event on 19/3/2024 at 3.30 pm that a major subsidence occurred’. The complainant’s expert in AR’s supplementary report concluded that: · the type of soil and its composition is important as it forms the basis of stability for the dwelling · under normal circumstances the relationship between slab type and soil consistency provides for a stable and fit for purpose situation · however, in the event of a substantial rain event that was able to inundate the sub slab area then we could reasonably expect that it would affect the soil and by doing so corrupt the otherwise dry sub slab area · as the area beneath the slab was compromised to the rear of the dwelling it caused a counter lever effect whereby the front of the dwelling was adequately supported yet the rear was not due to the rainwater inundation · the effect from the excessive rainwater inundation was that the weight of the dwelling to the rear caused the house to drop · ‘rainwater generated by the severe storm event that occurred on the 2nd day of January [2024] was likely to have been responsible for subsequent damage’ and had ‘caused a cantilever force causing structural damage to the roof including trusses braking [sic, breaking] through the plaster’ which occurred on 19 March 2024. The terms of the policy were clear. The insurer provided cover for ‘Loss or damage caused by or arising from soil movement (including erosion, landslide, mudslide, or subsidence) if it was caused directly by and occurs within 72 hours of a storm. The insuring clause was also consistent with the general exclusion which excluded ‘Soil movement Including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood’. Accordingly, even if the damage to the home building was, as the complainant’s expert concluded, caused by soil movement (the expression used by AR was ‘a major subsidence’) then cover was only provided if the damage was caused directly by and occurs within 72 hours of the storm. AR’s opinion was that it was the 2 January 2024 storm which caused the damage on 19 March 2024. Under the terms of the policy, such an event was not covered as the damage was not caused directly by or occur within 72 hours of the 2 January 2024 storm. Accordingly, the complainant has not established a valid claim. Further, the policy contained a general exclusion for soil movement (including erosion, landslide, mudslide or subsidence) unless it was directly caused by and occurs within 72 hours of a storm. Accordingly, even if the complainant had established a valid claim (which he has not), the claim was excluded under the policy. In those circumstances it is not necessary to determine which of the complainant’s or the insurers’ expert’s conclusions are to be preferred. Even accepting the conclusions of the complainant’s expert (AR) (and noting that they were disputed by the insurer’s experts and the insurer), the complainant has not established a valid claim under the policy or, alternatively, it was excluded under the policy. Accordingly, the insurer was entitled to deny the claim and is not required to take any further action in relation to the claim or the complaint. 2.2 Why is the outcome fair? The outcome is fair because the insurer is entitled to rely on the terms and conditions of the policy to determine its obligations regarding the claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.