Home / Chubb / Determination 12-24-175463
Determination 12-24-175463
Defective repairs and delay after accepted leak damage claim; claim for rectification costs, future loss of rent, legal costs and non-financial loss
Summary
Owners of a strata unit claimed outstanding defects in insurer-arranged repairs after a leak, plus future rent loss, legal costs and compensation. AFCA found no outstanding defects and rejected rent and legal costs, but awarded $1,500 for non-financial loss due to delay.
The complainants did not prove outstanding defects or future rent loss, and legal costs were not warranted, but the insurer unreasonably delayed repairs by over a year, warranting modest non-financial loss compensation.
Issues
- Repairs or contractors primary · not upheld
“The complainants have not shown the insurer's repairs have any outstanding defects.”
- Claim amount dispute secondary · not upheld
“The complainants have not shown they will lose rent while rectifying the insurer's repairs.”
- Poor claim handling secondary · upheld
“The insurer mishandled the claim by taking an unreasonably long time to repair the property.”
- Delay secondary · upheld
“The insurer delayed repairs by at least a year.”
Subjects and remedies
home or building damagepay non financial loss
Text of the determination
Determination
|
Case number
|
12-24-175463
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-24-175463 21 August 2025
1 Determination overview
1.1 Complaint
The complainants own a home insured under a residential strata insurance policy issued by the financial firm (the insurer). In November 2021, they lodged a claim after the home was damaged by a leak. The insurer accepted the claim and agreed to repair the damage.
The insurer said it completed repairs in July 2023, but the repairs were defective. The insurer says it rectified the defects by November 2023.
The complainants say the repairs still have defects that have not been rectified. They say the insurer should pay:
· the cost of rectifying the outstanding defects
· future loss of rent
· legal costs
· compensation for non-financial loss (stress, inconvenience, and delay).
1.2 Issues and key findings
Are there any outstanding defects in the insurer’s repairs?
No. The insurer is not required to arrange or pay for further rectification.
Is the insurer required to pay for future loss of rent?
No. The complainants have not shown they will lose rent while rectifying the insurer’s repairs.
Is the insurer required to pay for legal costs?
No. The complaint did not involve complex legal issues, and the complainants could have pursued it without legal representation.
Is the insurer required to pay other compensation?
Yes. The insurer delayed repairs by at least a year. This did not severely affect the complainants because they do not live at the insured property. However, it caused some stress and inconvenience. The insurer must pay $1,500 compensation for non-financial loss.
Why is the outcome fair?
The complainants have not shown the insurer’s repairs have any outstanding defects. It would not be fair to require the insurer to arrange further rectification work.
1.3 Determination
This determination is mostly in favour of the insurer.
The insurer must pay the complainants $1,500 compensation for non-financial loss.
The insurer is not required to take any further action in relation to this complaint.
2 Reasons for determination
2.1 Are there any outstanding defects in the insurer’s repairs?
No. The insurer is not required to arrange or pay for further rectification.
Complainants say repairs have outstanding defects
On or about 28 October 2021, the complainants’ unit was damaged by a leak.
On 16 November 2021, the insurance broker for the owners corporation lodged a claim with the insurer. The insurer accepted the claim and appointed a builder to repair the damage.
On 20 February 2023, the complainants signed a contract authorising the builder to repair the damage. The building contract included a scope of works (SOW) listing the repair work to be done.
On 6 July 2023, the insurer said the repairs were complete. The complainants said the repairs were defective. The insurer agreed the repairs had defects, and agreed to rectify them.
On 12 November 2023, the insurer said the repairs were complete. The complainants say the repairs still have defects that have not been rectified.
Complainants have not provided report on finished repairs
The complainants appointed a building inspector, who inspected the unit on 6 September 2023. The building inspector identified defects which the insurer’s builder agreed to rectify. The insurer reimbursed the complainants for the cost of the building inspector’s report.
The complainants have not provided a report from an expert who inspected the unit after 12 November 2023, when the insurer says the repairs were complete. The complainants have not provided photographs showing defects in the finished repairs.
No defect identified in timber flooring
The SOW said spotted gum flooring was to be installed in the open plan area. The builder installed blackbutt flooring. The complainants say the flooring is defective because it does not comply with the SOW.
On 22 May 2023, the complainants asked the builder to install blackbutt flooring instead of spotted gum flooring. The complainants sent the builder a text message saying: ‘Hi [builder] confirming Blackbutt not Spotted Gum’. The complainants say the text message is ‘ambiguous’. However, they do not deny they asked the builder to install blackbutt flooring instead of spotted gum flooring. They have not explained how else the text message could be interpreted.
The complainants say the method used to install the flooring was different to the method set out in the SOW. The insurer says the method set out in the SOW would have created tripping hazards, as the finished timber flooring would have been at a different level to adjacent carpeted flooring. The insurer says the builder used a different method which produced a better result, with timber flooring at the same level as adjacent carpet. The complainants have not provided any information to refute this.
The complainants do not allege the flooring breaches any building code. Their only complaint with respect to the flooring is that it does not comply with the SOW.
The complainants have not shown the flooring is defective.
The building contract says that if there is any variation in the building works, the builder must provide a variation information notice. The complainants say the builder breached the contract by not providing a variation information notice. I agree. However, the complainants have not shown this breach of contract caused them to suffer a loss. The complainants are not entitled to compensation for this breach of contract.
No defect identified in ensuite tiling or waterproofing
The SOW said waterproofing in the ensuite would be done by a licenced contractor.
The complainants say the tiling in the ensuite was done by an unlicenced contractor. They have not provided any evidence of this.
The complainants provided a photograph of a contractor wearing a shirt advertising a recruitment labour hire company. They have not said why they believe the contractor in the photograph is unlicenced. They have not provided any evidence that the contractor in the photograph is unlicenced.
The insurer provided a form certifying that the waterproofing complied with all relevant codes, and providing license details for the person who completed the form. The complainants have not commented on this.
The complainants provided a photograph of a soap dish installed on a tiled wall. The top and sides of the soap dish are cut into tiles, while the bottom of the soap dish aligns with the horizontal border of a row of tiles. The complainants’ building inspector said the soap dish ‘should have been located 100mm down so cut tile was not noticeable’. The complainants say: ‘[We] consider that a qualified tiler would not install a soap dish with a cut tile above, and the cut tile would instead go below.’
Lowering the soap dish, aligning the top of the soap dish with the top edges of tiles, would have made the tiles cuts less noticeable (as all cuts would be below the soap dish). However, lowering the soap dish may have made it harder to use. The builder said the soap dish was positioned where requested by the complainants. The complainants have not denied this.
The complainants have not shown the ensuite tiling or waterproofing is defective.
No defect identified in choice of tiles
The complainants say the builder did not install a ‘feature tile’ in the ensuite. They say this forced them to install black tapware as a ‘feature’. They say black tapware will require ‘regular and expensive maintenance’.
The ensuite walls previously had plain white tiles with a narrow column of contrasting coloured tiles. The builder replaced the plain white tiles with patterned tiles. The complainants did not object to this. They did not ask for tiling that matched the appearance of the previous tiling.
The complainants have not shown the new ensuite tiling (patterned tiles) is inferior to the previous ensuite tiling (plain tiles with a column of ‘feature tiles’).
No damage to splashback
The complainants say the builder damaged a stone benchtop. The insurer accepted this and paid the complainants the cost of replacing the benchtop.
The complainants say removing the benchtop will result in the loss of a splashback. They have not said why they believe this.
The insurer says the benchtop can be replaced without damaging the splashback. The insurer says it will review damage to the splashback if it occurs.
The complainants have not shown removing the benchtop will damage the splashback.
2.2 Is the insurer required to pay for future loss of rent?
No. The complainants have not shown they will lose rent while rectifying the insurer’s repairs.
Complainants claim for future loss of rent
The insurer paid for loss of rent to 14 January 2024. The complainants obtained a new tenant who rented the unit from 15 January 2024.
In this complaint, the complainants have not disputed the insurer’s payments for past loss of rent. However, they say the insurer should pay for future loss of rent.
The complainants say they will lose rent while the insurer’s repairs are rectified. They say the insurer should compensate them for this.
Insurer not required to pay for future loss of rent
The insurer’s builder damaged a stone benchtop. The complainants have not provided information showing replacing the benchtop would make the unit uninhabitable.
The insurer paid the complainants the cost of replacing the benchtop in or about August 2023. The complainants could have replaced the benchtop before January 2024, when they obtained a new tenant.
Other than the damage to the benchtop, the complainants have not shown the insurer’s repairs have any outstanding defects that require rectification. Therefore, the insurer is not required to pay compensation for future loss of rent.
2.3 Is the insurer required to pay for legal costs?
No. The complaint did not involve complex legal issues, and the complainants could have pursued it without legal representation.
AFCA can require insurer to contribute to legal costs
The complainants appointed a lawyer to help them with their claim and this AFCA complaint. They want the insurer to contribute to their legal costs.
AFCA may require an insurer to contribute to the costs a complainant incurred in making a complaint. Unless there are exceptional circumstances, we will not require the insurer to contribute more than $5,000 to these costs. In deciding whether to award compensation, we consider whether the costs were reasonably incurred, and whether they helped resolve the complaint.
We aim to provide a dispute resolution process that is accessible to complainants, without any need for legal representation. Therefore, a party that chooses to be legally represented will generally have to pay for this themselves. However, we may still require an insurer to contribute to a complainant’s legal costs if the complaint raised complex legal issues, or if the complainant could not have reasonably handled the complaint without getting legal advice.
Insurer not required to pay legal costs
The complainants say the complaint raised complex legal issues, being ‘the principles of breach of contract and negligence, with reference to contract terms, defective building works and the quantification of loss’. However, there was no dispute that legal principles relating to contract and negligence required the insurer to rectify (or pay the cost of rectifying) any defects in its builder’s work.
The primary issue in dispute was whether there were any outstanding defects in the builder’s work. The complainants’ lawyer did not provide information showing there were any outstanding defects in the builder’s work.
I am not satisfied that the complaint raised complex legal issues, or that the complainants could not have reasonably handled the complaint without getting legal advice. Therefore, the insurer is not required to contribute to legal costs the complainants incurred in making this complaint.
2.4 Is the insurer required to pay other compensation?
Yes. The insurer delayed repairs by at least a year. This did not severely affect the complainants because they do not live at the insured property. However, it caused some stress and inconvenience. The insurer must pay $1,500 compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under the AFCA Rules, we can award up to $6,300 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim.
We do not award compensation for the usual amount of inconvenience involved in making a claim. We do not award compensation for delays caused by the complainant, or other factors outside the insurer’s control.
The complainants say the delays in repairing the property caused them stress and anxiety. They say the insurer should pay $6,300 compensation for non-financial loss.
Insurer delayed repairs
The complainants lodged the claim on 16 November 2021. The insurer’s repairs were not completed until about 12 November 2023, almost two years later.
The repairs appear to have been delayed because:
· the insurer’s loss adjuster inspected the unit on 19 November 2021, but the insurer did not accept the claim until 2 February 2022
· the loss adjuster reported mould in the ensuite on 3 June 2022. Mould remediation was not completed until 9 February 2023
· the complainants signed a building contract on 20 February 2023. The loss adjuster said repairs were expected to be completed on 31 May 2023. Repairs were not completed until 6 July 2023. Those repairs had defects which were not rectified until 12 November 2023.
The insurer has not explained why the mould was not identified until about six months after claim lodgement and not remediated until about 14 months after claim lodgement. In my view, the insurer is responsible for a large portion of this delay. The insurer is also responsible for the delay of four months while defects were rectified between 6 July 2023 and 12 November 2023.
Having considered the information provided by both parties, I consider the insurer is responsible for delaying the repairs by at least one year.
Insurer must pay $1,500 compensation for non-financial loss
The complainants’ unit is an investment property, not their home. The impact of the delays on the complainants was mostly limited to loss of rent, which the insurer has paid for. The complainants would have been frustrated by the delays. However, the complainants have not provided information showing this caused them more than mild inconvenience.
The complainants say they ‘suffered tremendously throughout this entire process’. They say one of them was hospitalised with chest pains on two occasions after discovering defects in the insurer’s repairs. However, they have not provided information showing the hospitalisation was related to the claim.
When assessing the amount of compensation to be awarded for non-financial loss, AFCA considers how the insurer’s errors have affected the complainant. AFCA considers the severity and duration of the impact.
The insurer mishandled the claim by taking an unreasonably long time to repair the property. The impact of this on the complainants was mild, but lasted for a long period of time (more than a year). In my view, this warrants compensation for non-financial loss in the sum of $1,500.
2.5 Why is the outcome fair?
The complainants have not shown the insurer’s repairs have any outstanding defects. It would not be fair to require the insurer to arrange further rectification work.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
Complainants represented by lawyer
The complainants were represented by a lawyer. In this determination, statements made by the complainants’ representative are treated as if they were made by the complainants.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.