Delay in claim and damage to tiles during remediation works; refusal to replace matching tiles
Summary
Water damage claim after an earthquake was delayed, and the insurer's builder destroyed unmatched tiles during remediation. AFCA ordered matching tiles be relayed with alternative accommodation provided, and awarded $6,300 for non-financial loss.
The insurer's builder caused loss outside the policy by removing tiles without giving the complainant a choice, and the delay caused unusual inconvenience warranting non-financial loss compensation.
Issues
- Repairs or contractors primary · upheld“The insurer's builder removed the water closet tiles, damaging them so they could not be matched; insurer should relay matching tiles.”
- Poor claim handling secondary · upheld“The insurer could have given the complainant a choice between best practice flooring that will not match or a compliant building where flooring matches.”
- Delay secondary · upheld“It took the insurer nearly a year to determine whether the policy responds; the builder's tile demolition caused close to a year of delay.”
- Product terms interpretation secondary · not upheld“Insurer relied on policy terms to limit liability for matching tiles; AFCA found it fair to rectify the damage outside the scope of the policy.”
Subjects and remedies
home or building damagenatural disasterpay compensationpay non financial lossrepair or rectify
Related
Text of the determination
Determination
|
Case number
|
12-24-172639
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-24-172639 21 May 2025
Determination overview
Complaint
The complainant’s house was damaged by water leaking from a pipe following an earthquake.
The complainant lodged a claim with the financial firm (his insurer) and says that the insurer has delayed the claim, caused damage to the property by removing tiles which cannot be matched and refusing to relay matching tiles. The complainant seeks reinstatement of the damaged tiles in his home and compensation for the significant stress he has suffered.
The insurer agrees that the claim was delayed, but says significant delays were caused by the complainant. The insurer also says that it has not damaged the property and that it is not responsible to replace all tiles in the property.
Issues and key findings
Is the insurer responsible to replace the tiles on the second floor?
Yes. The insurer’s actions caused financial loss to the complainant and it is fair in the circumstances that the insurer replace the tiles on the second floor.
Is the complainant entitled to non-financial loss?
Yes. The complainant has been out of his house in alternative accommodation for nearly two years. The delay in the claim caused by the insurer’s actions have caused significant stress to the complainant. It is fair that the complainant receive compensation for his stress and loss of enjoyment in the amount of $6,300.
Why is the outcome fair?
The outcome is fair as the insurer has caused financial loss to the complainant during the claim and it is fair that the insurer relay matching tiles to remedy that loss. It is also fair that the insurer pay for alternative accommodation during the remediation process. The complainant has shown a high level of stress and loss of enjoyment and it is fair that the insurer compensate the complainant in the amount of $6,300.
Determination
This determination is in favour of the complainant.
If the complainant accepts this determination, then the insurer must complete the remediation by replacing all tiles on the middle level with matching tiles. Alternative accommodation should be provided while this process is undertaken.
The insurer must otherwise continue to resolve the claim.
Reasons for determination
Is the insurer responsible to replace the tiles on the second floor?
Yes. The insurer’s actions caused financial loss to the complainant and it is fair in the circumstances that the insurer replace the tiles on the second floor.
Policy and background to the complaint
The complainant insurers his house under an insurance policy underwritten by the financial firm (insurer).
On 13 November 2021, the complainant lodged a claim for water damage which he says was caused by an earthquake. After some investigation by the insurer, the claim was accepted in September 2022. When the claim was accepted, the insurer accepted it as damage caused by an escape of liquid, however, nothing turns on this.
The source of the water leak was a pipe in the laundry.
In about November 2022, mould remediation and containment commenced. During that process, mould contamination was found not just on the ground floor in the laundry, but on the second floor in the master bedroom and in the water closet. A leak was discovered in the toilet cistern. The bedroom shares a wall with the water closet.
Remediation causes loss to complainant
Around May 2023, after mould containment and decontamination works were completed, the insurer then commenced the beginning of remediation works at the property. The works involved stripping out surfaces contaminated with mould and those that were damaged by water. The insurer arranged for the complainant to move to alternative accommodation when the remediation started.
The remediation works were to proceed in two stages, first removal of the contaminated items, then a builder was to attend to remove any structural items and commence reinstatement.
Before the commencement of the remediation, the complainant was provided with a scope of works (SOW) for the mould remediation. The SOW says that as part of the remediation the slate tiles in the water closet may be damaged.
As at October 2023, the final report from the mould remediation builder shows the tiles in the water closet remaining. There is some suggestion that the tiles may have been cracked at this time but the photographic evidence of the tiles in October 2023 after the strip out does not show any significant damage: I accept that any damage to the tiles was minor.
By January 2024, the insurer had appointed a builder to commence remediation. By April 2024, the builder had removed the tiles in the water closet so that new tiles could be relayed. The old tiles were damaged in the removal process and, given the age of the tiles, they could not be matched to the remaining tiles on the second floor.
The complainant has provided a report from an auctioneer which says that by changing the tiles in the water closet, the market value of the property will be impacted potentially by $20,000-$30,000 as the age of the house will be more apparent and any prospective buyer will be purchasing the property believing that a renovation is required.
The insurer says that the tiles were removed to allow the floor of the water closet to be waterproofed. The complainant provided an expert report and a copy of the national construction code that shows a water closet does not need to be waterproofed, but must be water resistant.
The exchanged documents show that the insurer accepted that the water closet did not need to be waterproofed but that it was best practice that the waterproofing be put in, particularly as the laundry and water closet share a wall.
I accept that it may be best practice to waterproof the water closet, however, by doing this the insurer caused financial loss to the complainant. The insurer may have been acting efficiently, however, it was fair in the circumstances for the insurer to ask the complainant what he wanted. Although the insurer did give some warning of possible damage to the tiles, in the scope of works, there is a significant difference between a statement saying tiles may be damaged and a statement saying that the tiles will be destroyed when they are removed, cannot be matched and that the insurer will be relying on the terms of the policy to limit its liability regarding matching tiles.
Put simply, the insurer could have given the complainant a choice as to whether he wanted best practice with a new floor in one room that will not match or a compliant building where the flooring does match. It was fair for the insurer to offer this choice, but it did not.
On balance, the insurer’s actions have caused damage to the complainant, outside of the scope of the policy, and in the circumstances it is fair that the insurer rectify the damage caused by its actions. Accordingly, the insurer should relay matching tiles on the second floor and entrance way, including relaying matching tiles in the bathroom.
Alternative Accommodation
As at June 2024, the claim notes show that the delay was resulting from the dispute over tiles. The insurer’s builder has caused the issues that have lead to a significant delay in the claim. It is not fair that the actions of the insurer prejudice the insured by using up alternative accommodation that was otherwise available. Accordingly, it is fair that the insurer provide alternative accommodation while the tiles are replaced and relayed.
Additional issues in the complaint
The complainant has also raised the following issues as part of this complaint:
Any electrical items that do not work after being returned from storage should be replaced
As the complainant has been living in alternative accommodation, the garden has allowed to become overgrown this should be tidied
The house should be given a comprehensive clean before returning possession to the complainant
The insurer should perform a hygienist report to show that there is no toxic mould remaining in the property.
These issues are dealt with below.
Regarding the electrical items, this determination does not deal with hypothetical issues. If items no longer work after storage, then the complainant can seek redress from the insurer, if appropriate, at that time.
Regarding the garden, while I accept that the complainant has been in alternative accommodation since 2023, the complainant has not shown that this prevented him from maintaining his garden during this period. Further, there is no persuasive evidence that the insurer damaged the garden. Finally, there is no entitlement under the policy for garden maintenance. Accordingly, it is fair in the circumstances that the insurer does not need to contribute to garden maintenance.
The insurer will return possession of the property to the complainant once the tiling has been completed and the remediation works relating to the claim finalised. I expect that the property will be cleaned after the builders have finalised their works. However, this determination does not deal in hypothetical issues and it is up to the insurer to manage the claims process.
The insurer’s report in 2023 shows that the mould in the property has been remediated. Once the insurer returns possession of the property to the complainant if the complainant says that there is a mould issue then at that time it is open for the complainant to address that issue at that time if it arises.
Is the complainant entitled to non-financial loss?
Yes. The complainant has been out of his house in alternative accommodation for nearly two years. The delay in the claim caused by the insurer’s actions have caused significant stress to the complainant. It is fair that the complainant receive compensation for his stress and loss of enjoyment in the amount of $6,300.
Under our Rules, the Australian Financial Complaints Authority (AFCA) may award compensation for non-financial loss (capped at $6,300) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during the course of a claim.
The complainant says the insurer unreasonably delayed the claim, left decisions on alternative accommodation until the last minute and has caused significant physical inconvenience and interference with the complainant’s expectation of enjoyment.
The insurer has delayed the claim. After the claim was lodged in November 2021, it took the insurer nearly a year to determine whether the policy responds. The claim notes disclose no reason why the insurer took so long. Although the insurer was trying to liaise with the complainant’s expert, ultimately, the exchanged documents do not show that the claims decision should have taken so long.
The remediation started in May 2023. The first stage of the remediation continued until around November 2023. The claim notes show that although delayed, there were multiple valid reasons for this including unknown maintenance issues, moisture in the slab taking time to dry, delays from unknown asbestos.
The most significant delay was caused by the insurer’s builder demolishing tiles in the water closet. This caused significant delays of close to a year. Throughout much of the claim the complainant was in alternative accommodation. However, I accept that the insurer has continued to pay alternative accommodation in excess of the policy limits.
On balance, the complainant has shown that he has suffered an unusual amount of physical inconvenience and interference with expectation of enjoyment and peace of mind. It is fair that the complainant receive compensation of $6,300.
Why is the outcome fair?
The outcome is fair as the insurer has caused financial loss to the complainant during the claim and it is fair that the insurer relay matching tiles to remedy that loss. It is also fair that the insurer pay for alternative accommodation during the remediation process. The complainant has shown a high level of stress and loss of enjoyment and it is fair that the insurer compensate the complainant the sum of $6,300.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.