Home / Suncorp Group / Determination 12-24-171489
Determination 12-24-171489
Insurer declined a variation for asbestos roof removal after a cash settlement of a hail damage claim, and the complainant sought $1,000 non-financial loss
Summary
The complainant sought extra payment for asbestos roof removal after a $71,615 cash settlement of a hail claim, plus $1,000 NFL. AFCA found the removal was included in the settlement and decided in favour of the insurer.
Under the policy a cash settlement is limited to the insurer's assessed quote, which covered the asbestos works, and there was no evidence of delay or mishandling.
Issues
- Claim amount dispute primary · not upheld
“AFCA found the costs of removing and replacing the asbestos roof were included in the cash settlement; insurer entitled to deny the variation.”
- Delay secondary · not upheld
“The insurer did not unnecessarily delay assessing the variation or mishandle the claim.”
- Product terms interpretation secondary · not upheld
“Policy clearly stipulates the basis of settlement if the insurer's offer to have its preferred repairer perform the works is rejected.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
|
Case number
|
12-24-171489
|
Financial firm
|
AAI Limited
Case number: 12-24-171489 31 July 2025
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy (policy) for listed events with the financial firm (insurer). On 24 January 2024, a claim was lodged for hail damage resulting from a storm event on 4 December 2023.
The insurer accepted the claim and paid a $71,615 cash settlement based on its builder’s quote (AZ) and assessor’s (IA) scope of works (SOW). The complainant chose to use her own builder (AC) and later requested additional funds for the removal of the asbestos roof.
The insurer declined the variation, stating it was already included in the cash settlement. The complainant disputes this and seeks further payment plus $1,000 for non-financial loss (NFL) due to delays.
A representative is assisting the complainant. Any reference within this determination to the complainant includes the representative unless otherwise stated.
1.2 Issues and key findings
Did the cash settlement include the asbestos roof removal?
Yes. This is because the exchanged information shows the costs associated with the removal and replacement of the asbestos roof were included in the cash settlement.
Is the complainant entitled to NFL?
No. The exchanged information shows the insurer did not unnecessarily delay assessing the variation or mishandled the claim.
Why is the outcome fair?
The outcome is fair because the insurer fulfilled its policy obligations by covering the asbestos roof removal and replacement in the original cash settlement. Requiring further payment would be unreasonable.
The insurer handled the claim appropriately, promptly assessing the variation and communicating its decision. Compensation for NFL is not warranted.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the variation.
It is not required to pay NFL.
2 Reasons for determination
2.1 Did the cash settlement include the asbestos roof removal?
Yes. This is because the exchanged information shows the costs associated with the removal and replacement of the asbestos roof were included in the cash settlement.
The policy covers insured events
The complainant holds a home building policy with the insurer for the period of 3 May 2023 to 3 May 2024. The policy is an ‘insured events’ policy.
One of the insured events listed under the policy is ‘storm’ including hail.
The parties agree the:
· asbestos roof is hail damaged
· complainant has established a claimable loss.
The dispute is about if the cash settlement includes all costs associated with removing the asbestos roof and whether the amount paid is reasonable.
Policy cover is subject to terms and conditions
Under the terms of the policy, the complainant has the option to accept the insurer’s offer to engage its panel builder to repair or rebuild, or to reject the offer. If the offer is not accepted, then page 90 of the PDS says:
If the amount of the assessed quote to repair or rebuild is less than the home sum insured, we will offer you the choice to have the home repaired or rebuilt (based on the recommendation of our builder).
…
If you choose to not accept the offer
You will be paid the amount of the assessed quote to repair or rebuild on a ‘new for old’ basis. Note: this amount may be less than what it would cost you to arrange the repairs or rebuild with your own builder. We are able to secure supplier discounts from within our supplier network
There is no dispute among the parties the complainant received a copy of the policy documents. The insurer is therefore entitled to rely on the terms of the policy in assessing the claim.
Complainant requested cash settlement
The complainant lodged a claim for hail damage to her roof following a hailstorm. The insurer accepted the claim and arranged for an internal assessment (IA). In its report 15 March 2024, the IA notes:
· AZ’s quote reviewed and validated by assessor; deemed fair and reasonable
· approved to proceed with repair via vendor if customer agrees
· two preliminary sums require confirmation by AZ for liability quote:
> W profile roof sheets (garage)
> external awning
· for cash settlement, AZ must provide updated costings
· claims manager to confirm customer's preferred option.
At the complainant’s request, the insurer agreed to the cash settle the claim in line with policy terms. The settlement was subject to the deduction of the applicable excess and a cash settlement fact sheet.
The complainant accepted the cash settlement offer on 22 May 2024 and the insurer arranged the payment. The claim was closed.
Variation for asbestos removal
On 26 July 2024, the complainant submitted a variation SOW for asbestos roof removal. An additional settlement in the amount of $15,495 was requested under the claim.
The variation includes:
· site setup and administration
· contents protection
· asbestos roof removal
· sarking insulation removal
· ceiling cavity decontamination
· clearance certificate
· waste disposal
· temporary roof tarping
· PPE and consumable
· deductions for cladding removal and independent clearance.
Subsequently, an amended variation in the amount of $14,188 was submitted to correct the deductions already included in cash settlement.
The complainant says:
· the additional asbestos-related repairs are essential to restoring the property to its pre-loss condition
· the insurer denied the variation, claiming the costs were either included in the original settlement or exceeded standard rates
· the denial undervalues necessary, compliant repairs and contradicts the agreed SOW, which included estimated provisions
· the insurer’s internal review lacked clear reasoning and did not address concerns that the SOW misrepresents actual repair needs
· AC provided a detailed and compliant asbestos management plan, including safety measures and waste disposal, highlighting the true scope of required works.
Insurer rejects variation
The variation was reviewed by IA and declined. This is because:
· while AZ’s initial quote included two provisional sums, it confirmed the settlement reflected actual repair costs, not a provisional sum or estimate
· asbestos removal costs had not increased, and the variation contained previously included items like HEPA vac air monitoring
· each item was assessed as either:
> already included in the original scope
> not required under standard repair guidelines
> or exceeding approved vendor rates.
· specific items like mobilisation, contents protection, insulation removal, HEPA vacuuming, clearance certification, waste disposal, tarping, and consumables were all deemed standard inclusions or unnecessary.
The insurer says AZ can complete the repair and the claim was cash settled at the request of the complainant. In these circumstances, its liability is only what it would have cost to have the repairs completed by AZ.
Asbestos removal work included in cash settlement
I have carefully considered all the exchanged information. The complainant asserts the SOW omits key asbestos-related tasks identified by AC.
However, I am not satisfied the SOW is incomplete or the required works were omitted from the cash settlement. This is because IA and AZ clarified that all necessary asbestos removal components (such as site preparation, safety compliance, HEPA vacuuming, removal, and disposal) are included in the total figure, even if not itemised.
AC provided a more detailed breakdown. However, it did not submit independent valuations or cost reviews to support is pricing. Without such evidence, claims of underquoting remain unsubstantiated.
AZ is willing to complete the works at the settled price and has confirmed they will warrant the repairs, reinforcing the settlement is reasonable and compliant with industry standards.
Given the above, the insurer is entitled to deny the variation.
Uplift on cash settlement not warranted
The cash settlement did not include a contingency uplift for the transfer of the risk and loss of the insurer’s lifetime repair guarantee. I am satisfied, on the balance of probabilities (that is more likely than not), it would be unfair to apply an uplift to the cash settlement in this instance.
This is because:
· the insurer was willing to have AZ complete repairs at the quoted price
· the complainant rejected this offer; preferring to have AB perform the works
· the policy clearly stipulates the basis of settlement if the insurer’s offer to have its preferred repairer perform the works is rejected
· the complainant, through a professional representative, had sufficient opportunity to consider the consequences of rejecting the offer and manage the repair process independently
· there is no persuasive evidence the insurer’s assessment and settlement amount were demonstrably unreasonable or flawed
· the insurer says if further damage is found during repairs, the complainant can contact the insurer for reassessment and possible variations.
2.2 Is the complainant entitled to NFL?
No. The exchanged information shows the insurer did not unnecessarily delay assessing the variation or mishandled the claim.
AFCA approach to non-financial loss
Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if the loss was partially caused by the actions of the complainant, or by factors outside the insurer’s control.
Complainant is not entitled to NFL
The exchanged information shows the insurer has not caused delays in roof repairs. The claim was cash settled promptly, with consistent communication and clear explanations provided.
The insurer offered to complete repairs through its builder, including a full scope and lifetime warranty. However, the complainant declined and pursued her own builder and variations.
Given the insurer’s reasonable actions and available builder, compensation for NFL is not warranted.
2.3 Why is the outcome fair?
The outcome is fair because the insurer fulfilled its policy obligations by covering the asbestos roof removal and replacement in the original cash settlement. Requiring further payment would be unreasonable.
The insurer handled the claim appropriately, promptly assessing the variation and communicating its decision. Compensation for NFL is not warranted.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.