Home / Suncorp Group / Determination 12-24-169807

Determination 12-24-169807

Insurer partially denied building claim for structural damage after trees fell on home during storm, and make-safe failed for six months

FirmSuncorp Group
Decided2025-08-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$410,708
Non-financial loss$6,300
Amount claimed$314,279
SourceAFCA PDF

Summary

After trees fell on the complainant's home in a storm, the insurer accepted only part of the building claim and took six months to complete an effective make-safe. AFCA found the disputed damage was covered, ordered a cash settlement of $408,562.73, $2,145 expert costs and $6,300 non-financial loss.

The complainant showed on the balance of probabilities that the structural damage was caused by the insured tree impact and the failed make-safe, the insurer did not establish any exclusion, and the relationship breakdown made cash settlement fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-169807 | Financial firm | AAI Limited Case number: 12-24-169807 21 August 2025 1 Determination overview 1.1 Complaint The complainant had a home and contents insurance policy with the financial firm (insurer). In December 2023, she lodged a claim for damage caused by trees collapsing on her home during a storm. The insurer partially accepted the building claim but denied some of the claimed structural damage. The insurer settled the contents claim and this is not in dispute. The complainant says the structural damage was caused by the tree impact. She also says the insurer failed to adequately complete a make-safe to the roof and ceiling until six months after the event, which allowed ongoing rainwater ingress to cause further damage. The insurer says the complainant has not established the structural damage was caused by an insured event and it is otherwise excluded by the policy. The complainant wants the insurer to cash settle the entirety of the building damage and pay compensation for stress and inconvenience caused by the insurer’s poor claim handling. 1.2 Issues and key findings Is the insurer required to pay for the disputed damage? Yes. The complainant has shown that the structural damage was most likely caused by the tree impact, and the internal damage was caused by ongoing rainwater ingress due to the inadequate make safe. The insurer has failed to establish any policy exclusions apply. How should the building claim be settled? The insurer says it is prepared to have its builder complete repairs. However, the insurer’s SOW does not cover all the damage the insurer is liable for. It is fair for the insurer to cash settle the claim based on the complainant’s SOW and quotations as set out in section 1.3. Is the complainant entitled to compensation? Yes. The poor claims handling caused an unusual degree of stress and inconvenience. The insurer is required to pay the complainant $6,300 as compensation for non-financial loss. Is insurer required to reimburse complainant’s expert costs? Yes. The complainant’s experts assisted in substantiating the claim. The insurer is to reimburse the complainant’s expert costs in the amount of $2,145. Why is the outcome fair? The insurer’s liability is determined in accordance with the policy terms. The evidence shows that the disputed damage arose from the claimed event and no policy exclusions apply. In the circumstances it is fair for the insurer to pay the claim in full together with compensation. 1.3 Determination This determination is in favour of the complainant. Within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer shall pay to the complainant: · $408,562.73 to settle the building claim · $2,145 as reimbursement for the costs of experts · $6,300 as compensation for non-financial loss. 2 Reasons for determination 2.1 Is the insurer required to pay for the disputed damage? Yes. The complainant has shown that the structural damage was most likely caused by the tree impact, and the internal damage was caused by ongoing rainwater ingress due to the inadequate make safe. The insurer has failed to establish any policy exclusions apply. Onus of proof and policy coverage When making a claim, the complainant has the onus of establishing, on the balance of probabilities (i.e. that it is more likely than not), that they suffered a loss which is covered by the insurance policy. This is known as establishing a claimable loss. If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of probabilities, the application of any condition or exclusion it relies on to reduce its liability. There is no dispute that the complainant was provided with a copy of the policy documents including the Certificate of Insurance (COI) and Product Disclosure Statement (PDS). The policy provides cover for loss or damage to the home caused by specific events including storm (page 42) and impact caused by ‘a falling tree or part of a falling tree including the roots’ (page 47). The policy also covers ‘accidental damage at home’ (page 77). There is no dispute that the property was damaged by a tree impact during a storm. The insurer accepted liability for damage to the components of the home listed in the 7 June 2024 SOW and quotation for $126,945.90 compiled by the insurer’s builder, R (‘R’s SOW’). However, the complainant says there is additional damage caused by the insured event and ongoing water ingress which should be covered by the insurer. The policy includes a ‘Lifetime guarantee on home repairs’ (pages 95-96 of the PDS). Complainant says additional damage should be covered The complainant appointed an engineer (J) to report on the damage to the property. On page 14 of its report dated 22 February 2024, J says the following structural damage was caused by the insured events: · damage to the roof cavity structure because of the tree impacts, including multiple rafter joint separations at the ridge, split and cracked rafters, multiple strut joint separations at rafters and split and cracked purlins · internal damage including to floors, cracking and swelling in walls and cornices because of ongoing water ingress, and doors and windows not closing correctly due to the tree impacts · damage to house foundations, including splits to concrete stump and bent steel stumps. Insurer says the disputed damage is not covered The insurer says the disputed damage did not arise from a single incident covered under the policy. The insurer also relied on policy exclusions for earth movement (page 42) and wear, tear and gradual deterioration (page 33) to partially decline the claim. The issue is whether the proximate cause of the disputed damage was the insured event (which is covered) or whether it was one or more of the excluded perils identified by the insurer. The proximate cause is the dominant, effective or operative cause of the damage. Property suffered extensive tree impact damage The complainant says more than one tree collapsed on the home during the storm event, causing at least several impact holes in the home as depicted in her mud-map of 26 February 2025. The insurer’s position is there was a single impact area on the roof caused by one tree. The panel has carefully considered the exchanged information and accepts that the extent of the branches landing on the house covered quite a significant area with multiple rooms reflecting daylight and open sky though the roof. The panel refers to the following evidence in support of this: · the photographs in J’s report show long and thick tree branches collapsed in multiple locations across the top of the home, up against the home, penetrating into the home and laying inside the home · these photographs show the sky is visible from inside the home through more than one large hole within the ceiling and roof · the information shows at least two trees located close to the home, and one is very large · the complainant says the insurer’s make safe trade told her at least 50 holes in the roof were caused by the tree impacts. The panel considers it likely multiple trees impacted the home but accepts that the damage occurred during a single storm event. It is therefore unnecessary to determine whether the damage was caused by one or more trees. Roof cavity damage likely caused by tree impacts The complainant’s engineer (J) inspected the property one month after the incident and reported multiple rafter joint separations at the ridge, split and cracked rafters, strut joint separations, and damaged purlins. J described the damage as appearing ‘fresh’, indicating it was recent and consistent with the timing of the tree impacts. J’s report is also supported by photographic evidence showing the fresh nature of the damage. The panel accepts the photographs in the report, as listed on page 17, show what appears to be ‘fresh’ separations, splits and cracks. The panel considers this persuasive evidence that such damage happened shortly before J’s report which was compiled in February 2024. The insurer’s engineer (E) inspected the property six months after the incident and concluded that the observed separations, splits, and cracks in the roof cavity were filled with dust and debris. E noted that the damage was evenly distributed across the roof cavity and not confined to the area of tree impact. E attributed the damage to natural expansion and contraction due to moisture changes, rather than the storm event. The complainant says the report of E is not convincing because: · E’s inspection took place six months after the insured events. During that time, the roof cavity suffered ongoing water ingress because the roof and ceiling make safe did not succeed in keeping out rainwater until May 2024. This explains why the damage was covered in dust, debris, and no longer appeared ‘fresh’ · there was not only one area of tree impact, but rather at least several. This explains why the damage was spread across the roof cavity space. The panel agrees with the complainant that E’s findings are not persuasive. The panel considers E’s findings are less reliable due to the delayed inspection. During the six-month delay, the roof cavity was exposed to ongoing water ingress which likely explains the presence of dust and debris. The panel also considers it inappropriate that E did not inspect the roof cavity completely and notes 'limited viewing of roof frame due to location of roof tarp and ceiling lining' and 'all possible impact damages... not investigated’ when the roof was clearly significantly impacted by the falling tree branches. The panel considers J’s report more convincing because it was completed shortly after the insured events, it is thorough, and J’s findings is supported by numerous photographs. Foundation damage likely caused by tree impacts The complainant says the splits to the concrete stump and bent steel stumps were caused by the tree impacts. J says this is because the concrete stump damage appears ‘fresh’ and the steel stumps are misaligned in the direction of the falling trees. J refers to the photographs in his report. The panel considers this information to be persuasive. According to the report of E, such damage was caused by concrete cancer and seasonal earth movement. The complainant says the findings of E are not convincing because: · the insurer’s builder R in its initial assessment of 29 December 2023 said ‘the force of the impact from the fallen tree has caused… concrete stumps to crack and shift’ · the concrete stump damage appeared ‘fresh’ · the damage is consistent with the force impacted on the house by the fallen tree branches. The panel agrees with the complainant that E’s findings are not persuasive for the reasons she has given. The panel also notes that E’s finding the damage was caused by concrete cancer was based on observations of stumps other than the stump in question. In the circumstances, the panel accepts the findings by J that the foundation damage was most likely caused by the insured events. Internal damage likely caused by ongoing water ingress The complainant says the internal damage to floors including separation between wooden floorboards, cracking and swelling in walls and cornices was caused by the rainwater ingress that continued until the make safe was completed in May 2024. In support, the complainant points to her photographs and contemporaneous videos of the ongoing water ingress and the consequent damage. The insurer acknowledges that despite the property being uninhabitable from the time of the insured events, the roof and ceiling make safe to prevent ongoing rainwater ingress was not completed until six months later in May 2024. According to the E report, the internal damage was caused by natural settlement of the house over time and poor repairs. The complainant says E’s findings are not convincing because: · as the house is 80 years old, any natural settlement would have ceased years ago · no evidence has been presented to show poor repairs · as shown in her photographs and videos, the damage was an expected consequence of the interior of the house being exposed to storm and rainfall from December 2023 until completion of the make safe in May 2024. The panel notes that older houses can experience natural settlement over a long period of time and this does not necessarily cease. However, there is no persuasive evidence that natural settlement or poor repairs was the cause of the damage in question. The insurer says the doors and windows not closing correctly was because of ‘either… poor repairs, material settlement, seasonal movement or are not within the impact area’. The panel does not accept this. The insurer has not sufficiently particularised, with supporting evidence, which of these purported factors caused the damage. The information also shows tree impacts to multiple points across the house – not just one single impact point. There is no dispute that there was ongoing water ingress due to the failed make safe and the photos and videos provided show that the water ingress was severe. The panel accepts that further internal damage occurred to the house as a result. Given the significant amount of time it took to get the make safe correct, the additional damage became quite substantial. The insurer is contractually obliged to rectify defects arising from poor quality workmanship under the ‘Lifetime guarantee on home repairs’ (pages 95-96 of the PDS). The insurer is also liable for any damage caused by the negligence of its trades under the common law. In the circumstances, the panel considers it fair for the insurer to pay for the internal damage. 2.2 How should the building claim be settled? The insurer says it is prepared to have its builder complete repairs. However, the insurer’s SOW does not cover all the damage the insurer is liable for. It is fair for the insurer to cash settle the claim based on the complainant’s SOW and quotations as set out in section 1.3. Fair for insurer to cash settle building claim The insurer says it is prepared to have its builder R complete repairs based upon R’s SOW. However, the complainant is unhappy with this and want the claim to be cash settled. The complainant say she does not trust the insurer or its trades because of the inadequate make safe and the approach of its engineer at the dual site assessment. She says further that R originally seemed to acknowledge the extent of damage, but increasingly understated the damage with each subsequent inspection The insurer acknowledges the make-safe did not become effective against rainwater ingress until May 2024. The panel accepts that there was ongoing water ingress which led to further damage as shown in the exchanged photographs and videos The panel acknowledges that page 90 of the PDS states that if the insured does not accept the insurer’s offer to complete the repairs, they will be paid the amount of the assessed quote, and this may be less than it would cost to arrange the repairs. However, the panel does not consider this fair the circumstances. AFCA’s usual approach is that a cash settlement must be sufficient to enable the insured to complete the necessary repairs. R’s SOW does not cover all the damage the insurer is liable for, and the insurer has not obtained any quotations from other builders for comparison. The panel also considers the complainant’s concerns about R are justified. R prepared an initial SOW for repairs in the amount of $178,606.05 in March 2024 but later revised its SOW to $126,945.90 in June 2024. In its initial assessment of 29 December 2023, R reported ‘a large tree from the neighbours’ property fell onto the house, causing extensive damage to the exterior and interior of the property’. However, in its final assessment on 9 May 2024, R wrote ‘our site inspection found no structural damages attributed to the tree impact. Evidence indicates that items pointed out by the insured and listed in the insured’s engineer report are due to long-term, pre-existing issues that predate the tree impact’. As found in this determination, it is likely the claimed structural damage was caused by the insured events and the insurer’s inadequate make safe. If the insurer was to complete the repairs, this would require the complainant to re-engage with the insurer over a significant period. Given the concerns outlined above and the poor service described below, the panel considers this would not be fair on the complainant. In circumstances where the relationship has broken down, the panel considers it fair for the insurer to cash settle the cost of repairs in accordance with Section 1.3. This will facilitate a prompt resolution of what has been a protracted dispute. No evidence complainant’s SOW is not fair and reasonable The complainant obtained her own SOW and quotation from a builder (N) dated 13 November 2024 for $329,180.61 (N’s SOW). In April 2025, she also obtained her own painting quotation from a painter (B) for $33,650 which she says replaces the painting component of N’s SOW for $48,551.59 at items 30 to 30.40. She wants to be cash settled for the total of these amounts, which is $314,279.02. She also requests a contingency be added to allow for the checks and inspections of the claimed structural damage referred to at items 5.20 and 15 in N’s SOW because she says the complete extent of such damage cannot be known until destructive works are done. The insurer says N’s SOW includes repairs to damage which the insurer says was not caused by the insured events. However, this determination finds that the damage claimed by the complainant was caused by the insured events or otherwise by the inadequate make safe. The insurer says N’s SOW includes a full strip-out of the property and this is not necessary. As the panel accepts the complainant’s submission and information showing the entire property suffered water ingress from December 2023 until the make safe was completed in May 2024, and the presence of mould damage, the full strip out proposed by N is reasonable. The insurer raises past repairs (such as plaster patches) that have become more apparent after the insured event. The panel acknowledges this is a matter to be weighed up in terms of pre-existing damage, but is satisfied the primary cause of the complete strip out is the tree impact damage and associated water ingress over a considerable period. The insurer also says in its detailed 6 May 2025 submission, that some line items in N’s SOW are in excess of the equivalent cost in R’s SOW, whilst the insurer considers other costs are reasonable. The insurer says N’s SOW is not fair or reasonable but has not obtained other quotations for comparison. The panel does not accept the insurer’s position. For the reasons stated above, N’s SOW more accurately reflects the damage caused by the insured events. The panel does not consider the differences identified by the insurer in relation to some line items render N’s SOW unfair or unreasonable. It is not unusual for different trades to quote different amounts and there is no persuasive evidence that the N SOW exceeds market rates. Insurer to cash settle the claim based on complainant’s quote In the circumstances, the panel considers it appropriate the insurer cash settle the complainant for the amounts of N’s SOW (minus the painting component) plus the B quotation, which totals $314,279.02. A contingency of 30% ($94,283.71) shall be added to allow for: · the unknown extent of the claimed structural damage and mould damage · transfer of risk and loss of lifetime guarantee · potential cost increases due to passage of time since the SOW was prepared The total amount payable by the insurer to settle the building claim is $408,562.73. Insurer’s settlement of temporary accommodation benefit is fair The policy provides cover for temporary accommodation for the time taken to repair or rebuild the home (page 55 of the PDS). This is subject to a limit of 10% of the home sum insured. The complainant and her family were provided with short term emergency accommodation immediately after the insured event. Since then, the complainant has been living in alternative accommodation provided by relatives, and her husband has been residing in a caravan. The insurer paid for initial accommodation in the amount of $2,141.12 and made a further cash payment $48,818.88 to the complainant on 10 April 2024. The insurer has therefore paid the complainant’s full entitlement to temporary accommodation under the policy in the amount of $50,960 (10% of the home sum insured). The panel acknowledges that the repairs have been significantly delayed due to this dispute, and it will take some time for the complainant to complete repairs to the property after the insurer cash settles the claim. However, the panel considers the amount paid by the insurer for temporary accommodation to be fair in the circumstances. The panel has also awarded compensation for non-financial loss to account for the delays (discussed below). If the complainant applies for any other benefits under the policy, the insurer shall assess them on the premise the building claim has been accepted. 2.3 Is complainant entitled to non-financial compensation? Yes. The poor claims handling caused levels of stress and inconvenience in excess of what an insured should expect in a normal insurance claims process. The insurer is required to pay the complainant $6,300 as compensation for non-financial loss. AFCA can award compensation for non-financial loss in limited circumstances Under its Rules, AFCA can award compensation (capped at $6,300) where a complainant suffers an unusual degree of physical inconvenience, or time taken to resolve a complaint because of an insurer’s handling of the claim. AFCA takes a conservative approach to compensation for non-financial loss and will not award compensation merely because the complainant has suffered some inconvenience as part of the claims process. Insurer failed to complete an adequate make-safe The insurer acknowledges that the roof and ceiling make safe to prevent ongoing rainwater ingress was not completed until May 2024. The insurer says ‘there was no way for the insurer to confirm the make safes were watertight until further weather occurred’. The panel does not accept this. The information shows the complainant contacted the insurer on multiple occasions over the six-month period to complain about ongoing rainwater ingress. During this time, there were multiple instances of rain entering into the property causing further water damage and pest infestation. The complainant’s home is a medium sized single storey home, and it is not a complex design. The panel considers taking six months to complete a make safe to stop rainwater entering such a dwelling to be extremely poor service. Lack of cooperation at dual assessment meeting The complainant says the insurer’s engineer behaved poorly at the dual assessment meeting on 10 May 2024. She says that engineer refused to engage in a constructive dialogue with the complainant’s engineer to discuss the damage, and remained largely silent throughout despite the efforts of the complainant’s engineer to discuss the damage. The insurer has not responded directly to this assertion. Based on the submitted information, the panel accepts the complainant’s position. The panel considers the purpose of a site assessment is to exchange frank observations about the damage. It is not the time for parties to take a litigation-type approach to the meeting. Complainant is entitled to compensation for non-financial loss The panel accepts that the complainant experienced a significant and unusual degree of stress and inconvenience due to the insurer’s actions and poor claims handling. The complainant and her family have been unable to reside at the property due the extent of the damage. The claim has been ongoing for over 19 months and repairs are still awaited which continues to cause ongoing stress to the complainant. It is fair for the insurer to pay the complainant $6,300 in compensation for non-financial loss. 2.4 Should insurer reimburse complainant’s expert costs? Yes. The complainant’s experts assisted in substantiating the claim. The insurer is to reimburse the complainant’s expert costs in the amount of $2,145. AFCA can award compensation for professional costs in limited circumstances Under its Rules, AFCA may require an insurer to contribute to a complainant’s professional costs incurred (usually capped at $5,400) in bringing their complaint. This may include legal costs or expert reports. AFCA will consider whether the costs are reasonable and whether they helped resolve the complaint. The following expenses incurred by the complainant were required to substantiate her claim: · Proof of payment of $1,320 to N of 24 March 2025 for the cost of quoting for repairs · Proof of payments of $495 on 3 May 2024 and $330 on 14 May 2024 to J for engineering inspections and report. Complainant entitled to expert costs notwithstanding policy wording The insurer says the complainant is not entitled to these costs because of an express exclusion on page 34 of the policy which states the policy does not cover ‘professional, expert, legal, consulting or valuation costs, unless you obtained our prior authority to incur these costs’. The panel does not accept this. Under Rule D.5.1, AFCA may award these costs where AFCA is satisfied the costs were incurred in the course of the complaint. This requirement has been met. The complaint was about the insurer’s liability for the building claim and this determination concludes that the complainant’s expert evidence is persuasive. It was therefore necessary for the complainant to incur professional costs to establish her claim and pursue the complaint. The panel acknowledges that some of the costs were incurred prior to the AFCA complaint. However, they assisted with resolution and determination by AFCA. AFCA also considers it appropriate to award expert costs in circumstances where the poor handling of the claim by the insurer necessitated incurring such costs. The panel considers the poor handling of the make safe and dual site assessment put the complainant in a position of needing to incur these costs to counter the insurer’s position which, as found in this determination, was not correct. Further, had the insurer acted more reasonably (e.g. E had undertaken a thorough inspection of the roof space from the outset) or obtained a second opinion, the complainant’s expert may not have been required. The panel considers the complainant’s experts charged reasonable fees for their inspection and attendance. It fair for the insurer to reimburse the complainant’s expert costs in full. 2.5 Why is the outcome fair? The insurer’s liability is determined in accordance with the policy terms. The evidence shows that the disputed damage arose from the claimed event and no policy exclusions apply. In the circumstances it is fair for the insurer to pay the claim in full together with compensation. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in consumer and small business advocacy · a member with extensive experience as an industry expert. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.