Determination 12-24-169392

Complainants sought reimbursement of $10,422 maintenance works they say were unnecessary due to the insurer's consultant's faulty assessment of stormwater ingress; poor claim management

FirmHollard
Decided2025-11-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed$10,422
SourceAFCA PDF

Summary

Complainants claimed $10,422 for maintenance works they said were unnecessary because of the insurer's consultant's flawed assessment after storm water ingress. AFCA rejected full reimbursement but required the insurer to cover limited demolition and reinstatement costs and pay $2,000 non-financial loss.

Maintenance works were excluded and not shown to be unnecessary, but the consultant's failure to identify the second leak location caused limited extra cost, and poor claim management warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay non financial loss

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-169392 | Financial firm | Hollard Insurance Partners Limited Case number: 12-24-169392 29 October 2025 1 Determination overview 1.1 Complaint The complainants hold a home building and contents insurance policy (policy) with the financial firm (insurer). On 8 January 2024, a claim was lodged for damage to the insured building following stormwater ingress. The insurer has accepted the claim. The complainants are dissatisfied with the insurer’s assessment of their claim. They believe the insurer has misled them into incurring $10,422 in unnecessary works to the insured building. They say these expenses would not have been incurred but for the insurer’s consultant ‘K’s failing to investigate the cause and extent of damage to the insured building. 1.2 Issues and key findings Is the insurer required to reimburse the claimed $10,422? No. The exchanged information does not show it is more likely than not that the insurer misled the complainants into arranging unnecessary maintenance works to the building. However, it is fair to accept K’s failure to identify all locations of stormwater ingress financially prejudiced the complainants to a limited extent. The insurer is to cover the complainants for this limited loss in line with section 2.1 of this determination. Are the complainants entitled to non-financial loss compensation (NFL)? Yes. The insurer’s overall management of the claim’s assessment process and communication with the complainants has been poor. This has caused the complainants to experience undue and avoidable levels of stress, inconvenience and delays. It is fair that the insurer pays them $2,000 in NFL. Why is the outcome fair? The outcome is fair because it is based on the exchanged information and the policy. There is no persuasive information to show the maintenance works were not required or that stormwater ingress was not occurring from both locations. Rather, on the balance of probabilities, it is fair to accept the initial location of concern did present with evidence of issues needing maintenance works. The second leak location also requires maintenance related works. It would be unfair to require the insurer to cover the cost of these maintenance works, where they are excluded under the policy. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is not required to reimburse the claimed $10,422 but is to cover a limited degree of repair costs in line with section 2.1. It is fair that the insurer pays the complainants $2,000 in NFL. 2 Reasons for determination 2.1 Is the insurer required to reimburse the $10,422? No. The exchanged information does not show it is more likely than not that the insurer misled the complainants into arranging unnecessary maintenance works to the building. However, it is fair to accept K’s failure to identify all locations of stormwater ingress financially prejudiced the complainants to a limited extent. The insurer is to cover the complainants for this limited loss in line with section 2.1 of this determination. The policy is an insured events contract of insurance The insurer provided the complainants with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Storm’. The policy also includes the optional cover for accidental damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. This means that not all loss and damage is automatically covered. The includes the policy not covering maintenance related works. There is no dispute the complainants have established an entitlement to cover for storm damage to the building. Information relevant to the consideration of this complaint I have considered all the exchanged information including the various communications and supporting information from the parties. This includes all the expert reports and assessments as well as the information from the complainants, in particular their letter dated 19 May 2025 and associated attachments. I am satisfied the exchanged information establishes the following: · on 8 January 2024, the complainants discovered stormwater ingress in the downstairs area of the building following a significant rainfall event · a claim was lodged following which the insurer appointed consultants K to investigate the cause and extent of the damage · K completed an assessment and provided a report dated 7 February 2024 confirming the damage was due to an insured event. It found the location of concern (Location 1) was the side brickwork where water had appeared to be pooling on the concrete pad and entering under the slab · this was identified as being a maintenance related issue, and the complainants were told they would need to address this maintenance issue before the insurer authorised repairs to the resultant internal water damage (internal damage) · the complainant appointed consultants’ ‘CL’ to prepare a scope of works for and complete repairs to remedy the maintenance related concerns at Location 1 · CL completed the works at a cost of $10,422, which was paid by the complainants · the insurer commenced repairs to the internal damage accepted under the claim. During the course of these repairs further stormwater ingress occurred. K arranged for a leak detection investigation in August 2024 · this investigation through testing identified water was easily leaking through the external wall (at a different location – Location 2) into the subfloor. It was found Location 2 presented with perished waterproofing, cracking to the bricks mortar and splits in the expansion joint caulking · these were again assessed to be maintenance related works for which the complainants were to arrange the necessary maintenance works · the complainants say K’s initial assessment was incorrect, and they have been misled into incurring costs of $10,422 for works which were not necessary. Given this, they are seeking for the insurer to reimburse these costs · further, the complainants say the maintenance works required to rectify Location 2 will include having to demolish some of the works completed by CL at Location 1. The insurer has not provided any comment regarding this concern raised by the complainants. Insurer did not mislead and/or misidentify maintenance related concerns I acknowledge the complainants’ view that K’s initial assessment was inaccurate. Further, that this has resulted in the insurer requiring the complainants to incur expenses that were not actually required. I disagree. However, I accept K failed to identify all the locations which were allowing stormwater ingress into the insured building. This will be addressed later in the determination. I am satisfied the exchanged information supports K’s concerns regarding Location 1 and K’s recommendation that this be addressed by the complainants. In the absence of any persuasive information to the contrary, I accept K (and its representatives) are suitably qualified to undertake the assessments for which the insurer appointed them. The complainants have not provided any alternative and/or contrary expert evidence in support of their position. The exchanged information, which includes photos, shows it is more likely than not that Location 1 presented with signs of ongoing and existing moisture related issues. This includes: · moisture staining to the concrete padding consistent with ongoing issues of water pooling at the location · water not adequately diverting away from the building; and · the brickwork presenting with moisture and moss growth. I note the complainants says there was no water pooling issue, and the moss is because this wall is exposed to the weather events experienced in the area. However, they have not provided any qualified supporting information, shown they are qualified to provide expert opinions or information contrary to the obvious moisture related concerns. For these reasons, I am not satisfied it would be fair to accept K’s concerns regarding Location 1 were incorrect or that its recommendation for these concerns to be remedied was unreasonable. I am satisfied that the noted concerns were most likely due to ongoing issues at Location 1 and were not due to a one off storm event i.e. they were maintenance related works. In the interest of completeness, I note the complainants’ view that it was not a recommendation but rather a requirement for them to arrange the maintenance works to Location 1. I am satisfied the exchanged information shows it was a recommendation as far as the report from K is concerned. However, the insurer’s subsequent communication to the complainant made it clear it was a requirement for cover under the policy and not simply a recommendation. Complainants arranged the scope of works and maintenance works The report from K identified the concerns regarding the concrete pad, brickwork and need to redirect water away from the building. The report also recommended that the complainants address these issues as maintenance works. However, K did not provide a scope of works for the required maintenance works. It only identified the location of concern and the fact the concerns needed to be addressed before completing repairs to the internal damage. I am satisfied it is fair to accept the insurer’s position that it was up to the complainants to arrange the necessary steps to complete the required maintenance works. Also, that the complainants were responsible to ensure the scope of works and associated costs were necessary and reasonable. It is not unreasonable to expect the complainants would have arranged for a suitably qualified consultant to: · inspect Location 1 to determine and provide their view on the extent of the moisture and water ingress issues, as well as advise on the scope of works required to address the concerns · inform the complainants that such works were not necessary, if that was the case or alternatively provide the complainants with a detailed scope of works and costing for their consideration. I accept it is reasonable to accept that if the complainants had any concerns regarding K’s findings and recommendation, that they should have raised them with their appointed consultant ‘CL’ (or the insurer). However, there is no evidence of the complainants raising any concerns in this regard before authorising CL to complete the maintenance works at the cost of $10,422. There is no evidence in CL’s quotes and invoices that indicate Location 1 did not present with moisture and water ingress issues. The complainants have subsequently refuted K’s position on an ongoing water pooling issue with the concrete pad, its fall towards the building, water ingress issues and a need to take steps to ensure water is directed away from the building. They now maintain water never pooled in the location, there was no water ingress from Location 1 and the fall and drainage present before CL’s works were adequate. The complainants have not provided any qualified evidence/opinion in support of their position. I acknowledge they have expressed their dissatisfaction based on their opinions however I do not find this persuasive. This is because: · there is an absence of any persuasive supporting information · it would be unfair to discount qualified expert opinion and persuasive supporting information on the basis of the complainants’ opinions alone · the complainants had the opportunity to raise these concerns with the insurer, K or CL prior to arranging the maintenance works at Location 1, but did not do so · without evidence to the contrary, it is fair to accept CL quoted and completed the maintenance works because it agreed the works were necessary. Given the above, I am satisfied the exchanged information establishes it is more likely than not that Location 1 did present with moisture and water ingress related issues. Further, that these issues required maintenance works which were scoped and arranged by the complainants. I am not satisfied the complainants have established they have suffered any unnecessary financial loss due to the actions of K or the insurer in this regard. K failed to adequately identify all points of water ingress into the building I acknowledge the complainants’ opinion, and which forms the basis for their expectation to be reimbursed $10,422, that K incorrectly assessed Location 1 as a point of water ingress. However, I am not of the same view for reasons considered above, rather, I am of the opinion the relevant consideration is K’s failure to identify Location 2 as a point for water ingress during its original assessment. There is no dispute that despite the complainants arranging maintenance works to Location 1 that water ingress into the building continued. Also, that on further investigation, plumbers appointed by K identified a second location (Location 2) of water ingress into the building. I am satisfied that the issues identified at Location 2 which are allowing water ingress into the building are maintenance related and not covered under the policy. It is the complainants who are responsible to complete these works. However, I accept that K’s failure in this regard has not only caused undue delays and inconvenience, but further unnecessary and avoidable expenses. This is because the complainants say the maintenance works needed to rectify the issues at Location 2 will require demolition of some of the maintenance works completed at Location 1. The insurer has remained silent in this regard and in the absence of information to the contrary, I accept it is fair to accept the complainants’ position. It is reasonable to accept that had K completed comprehensive and adequate investigations in the first instance, it would have identified both locations of concern. This will have in turn allowed the complainants to arrange the necessary maintenance works to include both locations at the same time. In my view, this would have avoided the complainants now having to incur additional expense in having to demolish some of the recent works completed by CL. Given this, I am satisfied it is fair to accept K’s failure to identify Location 2 as part of its original assessment has caused the complainants to suffer a degree of financial loss. This financial loss is equal to the additional expense the complainants will now incur in having to demolish recent works by CL under the scope of works relating to Location 2. I have not been provided with any information that allows me to come to an informed decision regarding the cost of these demolition works and any associated reinstatement works directly arising from the demolition works. Therefore, subject to the complainants providing the insurer with reasonable supporting information establishing these additional expenses, the insurer is to pay the complainants for these additional expenses. The insurer is to make such payment within 14 days of being provided with the necessary information needed to establish the cost of the said demolition works (and associated reinstatement costs) to the recent repairs completed by CL at Location 1. To be clear, the insurer is only required to cover the costs for the limited demolition works to repairs recently completed by CL and associated cost to reinstate/repair the area where such demolition works take place. 2.2 Are the complainants entitled to NFL? Yes. The insurer’s overall management of the claim’s assessment process and communication with the complainants has been poor. This has caused the complainants to experience undue and avoidable levels of stress, inconvenience and delays. It is fair that the insurer pays them $2,000 in NFL. AFCA allows an award of NFL in certain circumstances AFCA Rule D 3.3 allows for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. An award of non-financial loss compensation under the Rules is based on an unusual degree or extent. This would not encompass the normal degree of inconvenience a person would suffer when lodging an insurance claim or in a dispute with their insurer. Insurer is to pay the complainants $2,000 in NFL I am satisfied the exchanged information supports the view the complainants have had a poor experience over the life of the claim. This stems from K’s failure to complete an adequate and fair investigation in first instance as well as poor communication on the insurer’s part. The complainants have provided persuasive information showing the insurer’s repeated failure to engage and/or respond to them. This also shows a failure by the insurer to review matters within the relevant and/or committed timeframes. I am satisfied it is fair that the insurer pays the complainants $2,000 in NFL in line with the AFCA Rules. This is because I am satisfied the insurer’s management of the claim has caused the complainants to experience unreasonable levels of stress, inconvenience and delays. Within 14 days of receiving notice of the complainants’ acceptance of this determination, the insurer is to pay them $2,000 in NFL. 2.3 Why is the outcome fair? The outcome is fair because it is based on the exchanged information and the policy. There is no persuasive information to show the maintenance works were not required or that stormwater ingress was not occurring from both locations. Rather, on the balance of probabilities, it is fair to accept the initial location of concern did present with evidence of issues needing maintenance works. The second leak location also requires maintenance related works. It would be unfair to require the insurer to cover the cost of these maintenance works, where they are excluded under the policy. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.