Dispute over settlement of a tree-damage claim: whether the property can be repaired or must be rebuilt, and the settlement amount
Text of the determination
Determination
|
Case number
|
12-24-167849
|
Financial firm
|
Blue Zebra Insurance Pty Ltd
Case number: 12-24-167849 29 May 2026
1 Determination overview
1.1 Complaint
The complainant’s property is insured under a landlord policy (policy) with the financial firm (insurer).
On 28 October 2021, a tree fell onto the complainant’s property. The complainant lodged a claim under the policy for damage caused by the tree.
The insurer accepted the claim and agreed to settle the complainant for the building damage. The complainant is unhappy with the settlement saying:
· the insurer’s failure to make the property safe, caused the damage to worsen
· the property is not repairable and needs to be knocked down and rebuilt so the policy sum should be paid.
The insurer says that the property can be repaired and has offered $500,000 to settle the damage from the tree and subsequent water ingress.
1.2 Issues and key findings
How should the claim be resolved?
Although both parties have supplied reports and quotes, based on the exchanged information, I cannot be satisfied if the property can be repaired or knocked down and rebuilt. To resolve the dispute, it is fair that joint experts be appointed to provide a scope of works and determine the costs to repair or knock down and rebuild the property, up to the policy limit.
Is the complainant entitled to compensation for non-financial loss?
No. In accordance with AFCA’s approach document, AFCA does not typically award non-financial loss to corporations. The complainant has not shown that it is fair for AFCA to depart from its usual approach. Therefore, the complainant has not shown that it is fair for it to receive compensation for non-financial loss.
Why is the outcome fair?
The outcome is fair as the damage to the property is covered under the policy and the outcome allows the complainant to repair the property or receive the policy limit.
1.3 Determination
This determination is partially in favour of the complainant.
If the complainant accepts this determination, then the parties should follow the steps set out in section 2.1 of this determination below.
In the alternative, the insurer may at any time elect to pay the complainant the policy limit of $1,030,000.
2 Reasons for determination
2.1 How should the claim be resolved?
Although both parties have supplied reports and quotes, based on the exchanged information, I cannot be satisfied if the property can be repaired or knocked down and rebuilt. To resolve the dispute, it is fair that joint experts be appointed to provide a scope of works and determine the costs to repair or knock down and rebuild the property, up to the policy limit.
Policy covers accidental damage, subject to exclusions
The terms of the policy are set out in the schedule and the product disclosure statement (PDS). There is no suggestion that those documents were not sent to the complainant. I accept that the insurer can rely on the terms.
The policy covers the complainant for accidental loss or damage to the building.
The complainant has the onus of establishing it suffered a loss from an event covered by the policy. If a claimable loss is established, the insurer then has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability.
For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
On 28 October 2021, a tree fell onto the complainant’s property causing damage. The parties accept that the damage caused by the tree falling is a claimable loss under the policy.
Insurer responsible for damage from water ingress
On 1 November 2021, the insurer attended the premises to carry out a make safe works. Those works included installing a tarpaulin over the damaged part of the roof to prevent further water entering the property.
By 28 January 2023, the make safe had failed. The exchanged documents show that the tarpaulin covering the roof had moved and water was able to enter the property causing further damage.
The complainant says that the policy requires the insurer to properly make safe the property. The complainant says that the insurer is liable for the damage caused by the failed make safe and any ongoing damage to the property.
The insurer says that the complainant failed to mitigate its loss and took no step to prevent further damage to the property.
The parties accept that the make safe failed and additional damage was caused to the property. The insurer says that a make safe is not a permanent solution. I agree. However, the make safe failed while the claim was ongoing and not unreasonably delayed. In the circumstances, it is fair that the insurer cover the additional damage caused by the failed make safe.
Expert reports show significant damage to the property
There is no dispute that the property has been damaged by the tree, and water ingress when the tarpaulin dislodged. The issue for determination is whether the property can be repaired or whether the house needs to be rebuilt.
The insurer has provided engineering reports from EB and SW.
SW is a structural engineer and has provided three reports and two scope of works documents. In summary the reports say:
· reinstatement of the building is possible addressing only the damage caused by the tree impact and water ingress
· apart from the main bedroom western wall there was no distress, movement or rotation - this suggests that the failed make safe has caused no substantial structural damages
· the dislodged make safe tarp did not result in, or compromise, the structural integrity of the roof/wall/floor structure and the footing system to warrant a complete demolition
· there is pre-existing rot on external timber members, deck and fascia board due to old age, repair works cannot be warranted unless the maintenance issues and rot have been rectified
· the timber framed structure of the building is intact with structural reinstatement restricted to elements about the impact location. The area of reinstatement does not approach 50%, therefore, the building does not need to be brought up to comply with current regulations
· the scope of works address both mould remediation and asbestos on site
· regarding prime costs:
> an updated scope of works will be prepared to reflect a prime cost of $15,000 for electrical works
> plumbing in the dwelling is generally undamaged and $10,000 is appropriate
> an updated scope of works will be prepared to reflect a prime cost of $45m2 for tiles
> $20,000 is appropriate for reinstatement
· if the complainants cannot locate a builder who is able to provide a quotation, the insurer’s panel builders should be given the opportunity
· removal of internal walls is not required to replace the flooring, it can be done by inserting a new cut-in floor supported by new blocking.
EB’s report, which is undated, shows the tree caused significant damage to the house. EB inspected the subfloor and saw no significant impact damage in the north part of the house. The report also says that the floor and subfloor framing of the building were not significantly affected by the tree impact.
The complainant has provided a report from an engineer, BE. BE, in a report dated 17 November 2022, says:
· there is significant damage from the tree impact and water ingress
· there is settlement to the buildings stump foundations likely due to the tree’s weight exceeding the foundations bearing capacity
· the bearers supporting the alfresco deck were in several locations cantilevered off their external supports likely caused by settlement of foundations internal to the house
· there is an expectation that the house has laterally displaced more than acceptable serviceability limits
· the house should be condemned
· the repairs required would be so extensive it would be impractical and financially unfeasible to repair the property
There is a further engineering report from IE, dated 11 May 2023. That report says:
· settlement of the buildings stump foundations are more likely to be the result of soil/ footing settlement and movement and is unrelated to the tree impact
· lateral loading has been imposed resulting in some damage to framing and wall linings
· total demolition and reconstruction of the building will be a more practically feasible and cost-effective option.
The complainant has provided a report from a builder, KP. KP’s report dated 9 November 2023 says in summary:
· before the insurer prepared a scope of works, the insurer should have undertaken:
> a material audit for hazardous substances, given the presence of asbestos
> engaged a bushfire consultant and fire assessment
> addressed mould, and
> allowed a building surveyor’s assessment of the property.
· the insurer has allowed $20,000 for planning and building approvals, the actual cost would be approximately $32,000.
· the property needs to be replaced, because:
> two separate builders (BB and SG) found there is too much damage for them to undertake works at a reasonable cost and provide a warranty
> in total, four independent builders confirmed the repair works are not economically feasible or feasible on a warranty basis
> the building is beyond salvageable repair
· the flooring is damaged and it has been recommended that the flooring be replaced, however, that requires removal of the walls as the walls sit on top of the flooring.
The complainant has provided reports from three builders (BB, SG and BC). In summary, those builders:
· refused to provide a quote to repair the damage
· say that the house cannot be repaired and needs to be rebuilt
· BB estimated the cost to rebuild at $1,172,325
· BC estimated the cost to rebuild at $1,251,999
· SG was unwilling to estimate the costs to rebuild.
The insurer obtained two quotes from EB and from CM. The quotes are based on the scope of works prepared by SW. The quotes show:
· EB quoted $382,030.67 to repair damage caused by the tree impact and $36,053.59 to repair damage caused by the water ingress from the failed make safe
· CM quoted $407,030.00 to repair damage caused by the tree impact and $27,970.80 to repair damage caused by the water ingress from the failed make safe.
Relevantly, the scope of works prepared by SW has not included the updated prime cost of $45 per m2 instead it has the prime cost of 35 per m2.
Insufficient evidence to show if the property can be repaired or if it must be rebuilt
The insurer says that the property is repairable and has offered the complainant the sum of $500,000 to repair the property.
Much earlier in the complaint process, the insurer offered to repair the property. The insurer says that it is now unwilling to do so.
The policy says that the insurer will settle a claim for damage to the building by paying the cost of repair or replacement.
The damage to the property occurred a long time ago and all of the expert reports and quotes are out of date. The relationship between the parties has broken down to the extent that the only feasible option to resolve the matter is for the insurer to cash settle the complainant, depending on if the property can be repaired or if it needs to be knocked down and rebuilt.
I am satisfied that the only fair way forward is for the parties to appoint independent experts to inspect the property and prepare a scope of works. A quantity surveyor can then be used to independently calculate the costs to repair or knock down and rebuild the property based on the scope of works. The parties will need to work together to bring finality to this dispute. This includes the complainant allowing the experts to access and physically inspect the property.
The complaint should be resolved in this way
The complainant is familiar with the building industry. On that basis, I consider the complainant has the knowledge and expertise to be able to nominate experts and the insurer can choose who should prepare the reports.
The parties are to follow the process below to resolve the dispute:
· within 14 days of being notified of the complainant’s acceptance of this determination, the complainant must provide the insurer with a list of:
> three proposed engineers, and
> three proposed building consultants
The proposed experts must not have had any prior involvement in the claim or complaint
· within 7 days of receiving the list, the insurer must:
> nominate one engineer and one building consultant from the complainant’s list
> formally appoint those experts
> confirm it will pay the costs of the reports
> ensure all correspondence with the experts is copied to the complainant
· within 21 days of appointment, the engineer and building consultant must:
> be provided with all exchanged material (expert reports and relevant documents)
> attend the property and carry out an inspection
· within 14 days of the inspection, he engineer must provide advice to the building consultant on any structural or engineering requirements
· within 14 days of receiving the engineer’s input, the building consultant must prepare a scope of works for all damage caused by the tree impact, the make safe and any resulting damage
· if the engineer or building consultant concludes the property cannot be repaired, within 14 days of that conclusion the insurer must pay the complainant the sum insured
· if the property can be repaired, within 7 days of completing the scope of works, the building consultant must provide the scope to a quantity surveyor (QS) they nominate
· within 14 days of receipt, the QS must provide a repair cost estimate
· within 14 days of receiving the QS estimate, the insurer must settle the claim by paying the lesser of the sum insured, or the repair cost (plus a 15% contingency to reflect the transfer of risk) assessed by the QS.
For completeness, the insurer has offered the complainant the sum of $500,000 to settle the claim. The complainant seeks the sum insured, being $1,030,000. Therefore, this matter is within AFCA’s jurisdiction which as at the time of filing allows AFCA to consider complainants up to $1,263,000 and award compensation up to $631,500.
2.2 Is the complainant entitled to compensation for non-financial loss?
No. In accordance with AFCA’s approach document, AFCA does not typically award non-financial loss to corporations. Although the complaint has been protracted in nature, the complainant has not shown that it is fair for AFCA to depart from its usual approach. Therefore, the complainant has not shown that it is fair for it to receive compensation for non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair as the damage to the property is covered under the policy and the outcome allows the complainant to repair the property or receive the policy limit.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.