Home / IAG / Determination 12-24-162842

Determination 12-24-162842

Cash settlement amount for awning repairs and refusal to replace awning with pre-existing deterioration

FirmIAG
Decided2025-12-15
ProductGeneral Insurance · Motor
OutcomeFor the complainant in part
Amount awarded$58,500
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

A rubbish truck damaged a business's awning; the insurer offered to cash settle the remaining repairs for about $47.8k-$50k but refused full replacement. AFCA found the insurer could limit settlement to impact damage but increased the settlement to $58,500 and awarded $2,000 non-financial loss.

The policy excludes deterioration and lack of maintenance so replacement was not required, but the cash settlement allowances and uplift were inadequate given the quote's age.

Issues

Subjects and remedies

business interruptionhome or building damagesmall businesspay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-162842 | Financial firm | CGU Australia Pty Ltd Case number: 12-24-162842 11 December 2025 1 Determination overview 1.1 Complaint The complainant, represented by the owner of a small business, lodged a claim with the financial firm (insurer) under a commercial plan insurance policy on 30 August 2023. A rubbish truck had opened its top door damaging the awning at the property. The insurer accepted the claim and appointed builder RI to complete the repairs. RI could not complete the repairs due to the pre-existing condition of the building. The insurer offered to cash settle the balance repair cost plus an uplift amounting to $47,814.48. The complainant seeks the insurer to increase the settlement offer, reinstate the awning to its pre-damage condition and pay compensation for its claim handling. 1.2 Issues and key findings Is the insurer’s settlement fair? No. The rubbish truck caused damage to the awning. The insurer is entitled to repair the damaged parts of the awning. The awning required replacement mostly because of its pre-existing condition. The insurer is not required to replace the awning in the circumstances. The insurer’s settlement offer however is not fair because: · its allowance for certain costs for incomplete repair works was not adequate or fair · given the repair quote is over two years old, the insurer should increase the uplift offered. Is the insurer required to increase the compensation offer? No. The insurer acknowledges there was a delay in having the initial repairs commenced. The parties disputed the repair method and the settlement amount thereafter. The delays inconvenienced the complainant and the insurer’s compensation offer is fair in all the circumstances. Why is the outcome fair? The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy. 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to settle the claim as detailed in section 2.1 of this determination and pay $2,000 non-financial loss compensation. The insurer is otherwise not required to take any other action in relation to the claim or this complaint. 2 Reasons for determination 2.1 Is the insurer’s settlement fair? No. The rubbish truck caused damage to the awning. The insurer is entitled to repair the damaged parts of the awning. The awning required replacement mostly because of its pre-existing condition. The insurer is not required to replace the awning in the circumstances. The insurer’s settlement offer however is not fair because: · its allowance for certain costs for incomplete repair works was not adequate or fair · given the repair quote is over two years old, the insurer should increase the uplift offered. Complainant must establish a claimable loss When making a claim, the complainant has the initial onus of establishing he suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim. Policy cover is subject to terms and conditions The building was insured on a replacement basis. The policy covers physical damage directly caused by vehicle impact to the building. The policy does not insure: · damage that is mould or wet or dry rot, or loss or damage directly or indirectly caused by or arising out of mould or wet or dry rot, unless arising from an event covered under the policy · loss or damage directly or indirectly caused by or arising out of: > a structural fault, faulty workmanship or faulty materials > a lack of maintenance or a lack of adequate maintenance > faulty design, formula, specification, plan or pattern Parties provided different views on the insurer’s settlement offer The complainant says: · he seeks the awning repaired and returned to a fully functioning worksite, as it was prior to the truck impact · the assessment report refers to the damage done 'due to the garbage truck's impact' and that they were aware that 'repairs to the timber battens should be carried out to ensure the stability and safety of the awning' · due to the partially deconstructed awning and barriers, some people assume his business is closed. Confidence in the business is shaken at a time he needs to grow it. He has experienced difficulties recruiting new staff given the condition of the building · there is $7,755 remaining for installation/labour costs. He will not use the $5,687 spent on cladding. This amount should be added to the settlement. The insurer says: · during repairs, it was found the roof structure was subject to severe rot and deterioration · engineer OC reported the awning has been subjected to substantial deterioration · the evidence indicates the deterioration has been happening overtime and is not the result of the incident · as the extensive damage to the structure is excluded under the policy, and the damage would not have occurred but for this excluded factor, it is entitled to decline any repairs that relate to the rectification of the deteriorated awning · it has offered to settle the remaining repairs that are covered by the policy that are directly related to the incident · the repairs already completed by RI do not require to be completed again. Insurer entitled to limit settlement to damage caused by impact The policy explains how the insurer will settle a claim: This is what We pay if ‘Replacement’ is shown on the Certificate of Insurance for the Building or Other Property. If a Building or an item of Other Property is damaged, We replace, reinstate or repair the part of the Building or item that is damaged as far as possible to its original condition, using materials that are readily available in Australia. Or, at Our option, We pay You the reasonable cost to do so. Our choice will have regard to the circumstances of Your claim and consider any preference You may have. RI attended the property on 13 September 2023 and observed: · the damage to the front awning was caused by a garbage truck lifting a skip bin into the soffit sheeting on the underside. The soffit sheeting is of a unique profile that cannot be repaired or matched, requiring a full replacement · the underside of the soffit sheeting has visible damage, including dents, scratches, and deformations · it was evident that the timber battens supporting the soffit sheeting had sustained significant damage, likely from the impact · the soffit sheeting had dropped in several areas, indicating potential movement of the timber frame · the structural integrity of the soffit sheeting and the supporting framework is compromised. OC attended the property in June 2024 and observed: · the roof sheeting was generally in a poor condition with corrosion evident throughout. The sheeting has not been fixed to the purlins in accordance with manufacturer’s specifications · purlins were notched at the steel truss locations which significantly reduces structural capacity of the section · several parts of the construction did not meet the expected design loads within current Australian Standards · the purlins also have water marks and rot throughout, particularly on the purlins’ top face, indicating the roof sheeting were not performing adequately · the timber end purlins are in generally poor condition and show signs of considerable structural cracking/splitting at the bolted connection points and weathering throughout · the steel trusted rafters had corrosion evident throughout however was particularly prevalent within the cleat and bolted connections · PFC roof beam had significant corrosion and pitting to the member and associated cleats · the roof system had insufficient bracing capacity. OC concluded the awning was not in a structurally adequate state. With the evidence of water damage, rot and corrosion to the structural members, the structure had substantial deterioration and was not fit for use. I acknowledge OC has not shown the awning did meet any Australian Standards prevalent at the time of the construction. A letter from the local council indicates the awning was constructed in September 1964 and OC had referred to current building standards, which did not apply at the time. I acknowledge the structure had withstood severe weather events recently and if not for the impact, the structure may have not required immediate replacement. I accept the impact from the struck caused damage to the awning. However, OC’s observations show the structure was not fit for purpose and had deteriorated over the years from water ingress and other factors. The policy covers the cost of reinstating the damaged part of the building. While the awning was impacted by the rubbish truck, this damage cannot be repaired, and the structure requires replacement because of its pre-existing condition/state. Given the above, I am satisfied the insurer is entitled to limit its settlement to the repair of impact damage caused by the rubbish truck. Insurer should increase the settlement offer RI’s initial quote for repairs amounted to $53,409.56 for repair of damage caused by the impact from the rubbish truck. The complainant’s builder’s repair quote amounts to over $90,000 for the replacement of the awning. Given RI had commenced part of the repair works, the insurer offered to cash settle the remaining cost of repairs based on RI’s quote as below: remaining repairs $31,054.00 cost of materials already ordered $7,444.28 30% uplift $11,549.48 Total $50,047.76 Upon reviewing the insurer’s settlement, I am not satisfied the insurer is entitled to remove and reduce the allowances for some of the elements of RI’s repair quote. This is because the complainant’s new builder may charge these costs according to their work requirements: · site preparation cost · the hours required for scissor lift operation · no allowance for waste disposal · the hours required by the electrician to complete the required works · material delivery cost. I have carefully considered the cost of repairs. While RI’s quote was current and actionable at the time it was first released in September 2023, it is not considered actionable at the present time. After allowances for the factors discussed above and given it has been two years and three months since RI’s original quote was released, I am satisfied it is fair an uplift of 40% is added to the settlement offer. This should more likely reflect the current costs. Given the above, it is fair in all the circumstances the insurer increases the settlement for the remaining repairs to $58,500. 2.2 Is the insurer required to increase the compensation offer? No. The insurer acknowledges there was a delay in having the initial repairs commenced. The parties disputed the repair method and the settlement amount thereafter. The delays inconvenienced the complainant and the insurer’s compensation offer is fair in all the circumstances. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: · physical inconvenience · time taken to resolve the situation · interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Insurer’s compensation offer is fair The complainant says the barricades erected as part of the make safe response have not only been insufficient but made his place of business look derelict. He had undergone many staff changes during this prolonged waiting time and have endured much commentary on how the business was closing down, in the community. He has had difficulties recruiting new staff and the repair delays and the condition of the building did not assist. The customers have been deterred, and the stress was taking him to breaking point. The insurer acknowledges there was a delay in having the initial repairs commenced before the further damage was discovered on 13 June 2024 and subsequent reporting was required. Further delays were experienced because the parties disputed the repair method and the settlement amount. I accept the insurer’s initial delays inconvenienced the complainant. However, I do not accept the insurer’s conduct following this, particularly its refusal to replace the awning, was unreasonable. Given the above, I am satisfied the insurer’s offer of $2,000 non-financial loss compensation is therefore fair in all the circumstances. 2.3 Why is the outcome fair? The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.