Text of the determination
Determination
|
Case number
|
12-24-161491
|
Financial firm
|
AAI Limited
Case number: 12-24-161491 10 September 2025
1 Determination overview
1.1 Complaint
The complainant holds home building insurance with the financial firm (insurer). On 12 September 2023, she lodged a claim for damage to her front masonry fence (fence) caused by a car hitting it on 29 June 2022.
The insurer accepted the claim, but the parties are in dispute about what would be a reasonable cash settlement amount.
The complainant says the entire fence and its footing must be replaced and seeks $76,890 based on a quote dated 11 November 2022 by builder N, who is a family member. The insurer says only the damaged section of the fence requires replacing. It is willing to pay the complainant $9,175.92 based on a quote dated 20 August 2024 by builder P.
The complainant is represented by N. For brevity’s sake, the complainant and N are referred to below as ‘the complainant’, unless context requires otherwise.
1.2 Issues and key findings
Is the insurer’s cash settlement offer reasonable?
No. Based on the exchanged information, P’s scope of works (SOW) reasonably reflects the extent of claim related repairs, but its quote is more than 12 months old. The insurer is to obtain an updated quote from P then pay that quoted amount plus a 15% uplift to allow for contingencies and loss of the insurer’s lifetime repair guarantee.
Why is the outcome fair?
While P’s SOW is reasonable, it is fair that the insurer pays a higher cash settlement to reflect current retail prices and to allow for contingencies and loss of the insurer’s lifetime repair guarantee.
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of receiving notice from the complainant that she accepts this determination, the insurer must:
· request an updated quote from P reflective of current retail prices
· within 14 days of receiving P’s quote, provide a copy of it to the complainant and pay her the quoted amount plus 15%, less the $600 policy excess if it has not been paid.
2 Reasons for determination
2.1 Is the insurer’s cash settlement offer reasonable?
No. Based on the exchanged information, P’s SOW reasonably reflects the extent of claim related repairs, but its quote is more than 12 months old. The insurer is to obtain an updated quote from P then pay that quoted amount plus a 15% uplift to allow for contingencies and loss of the insurer’s lifetime repair guarantee.
Parties agree a cash settlement is reasonable
The parties agree that it is reasonable for the claim to be cash settled.
A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then typically applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs.
Insurer has made cash settlement offers
On 22 September 2023, builder H inspected the fence and reported to the insurer that about 10 metres of its 15 metre long, 800mm high northern section would need to be replaced due to the impact damage. H noted the complainant said she had been advised by an engineer that the whole fence including foundations would need to be replaced. H disagreed.
On 25 September 2023, H provided a SOW for claim related repairs which totalled $3,888.50.
The insurer asked H to provide an updated quote, allowing for piers. H did so on 13 April 2024. The quote totalled $4,131.90. On 30 April 2024, the insurer offered that amount to the complainant as a cash settlement, but she rejected the offer.
On 10 July 2024, engineer M inspected the fence and reported to the insurer that:
· the property is on a corner allotment, with a roughly 50-year-old masonry fence on the northern and eastern property boundaries
· the north side of the fence was about 17 metres long and 600mm high, and about six metres of the fence had been damaged by the impact of the car. The base course in the area damaged remained intact upon the existing footing. The footing was undamaged
· the fence had some pre-existing movement, deterioration and decay including:
> cracking due to lack of articulation jointing
> cracking and movement due to long term footing movement
> undulating brickwork alignment along its eastern section
> age related detachment and separation from the low-level engaged piers
> negative impact of proximate vegetation on the footing system
> long term movement to the footing due to a large tree that had been removed in 2019
· the impact related damage was readily repairable to pre-existing lines on the existing footing system
· due to the pre-existing issues, the insurer’s builder may not be able to reasonably warrant the repair works.
On 12 July 2024, M provided a detailed SOW for the claim related repairs it had identified as being required. The repairs were limited to removal and replacement of the damaged six metres of the northern section, and associated work and preliminaries.
On 15 August 2024, builder P provided a quote said to be based on M’s SOW. The quoted amount was $3,747.94. The insurer concluded that P had not adequately allowed for the preliminaries M had outlined. The insurer asked P to requote.
On 20 August 2024, P provided its amended quote. It totalled $9,775.92 and included replacement of eight metres of fencing, as well as allowances for the preliminaries M had outlined, as well as a 15% builder’s mark-up.
Based on P’s amended quote but after deducting the $600 excess, the insurer says it is willing to pay the complainant $9,175.92 as a cash settlement.
The insurer sought clarification from a building inspector (inspector) at the relevant local council on whether a building permit would be required to rebuild the fence without a new footing. By email dated 15 November 2024, the inspector responded that a permit would not be required to reinstate a front brick fence less than 1,200mm high. The inspector also said:
However, I would not recommend the reinstatement of a new brick fence on the old existing strip footings due to possible existing footing rotation, tree root penetration…etc
In addition, the insurer obtained commentary from M on the complainant’s engineering reports. M maintained that the fence as a whole had not incurred damage because of the impact event, and neither it nor its footing required full replacement.
The insurer submits that the SOW/quote dated 11 November 2022 by the complainant’s builder N cannot be relied on to cash settle the claim. It says this is because it lacks a breakdown of costs and dimensions, includes non-claim related and unnecessary work, and would deliver a windfall to the complainant.
The terms and conditions of the policy are set out in the product disclosure statement (PDS). The insurer notes that the PDS confirms on:
· page 74 that in settling building claims, it will seek to have one of its trade network undertake repairs unless that is not possible – such as where there is pre-existing damage
· page 76 that in settling a building claim, it will not pay extra to repair to a better standard or specification, fix structural defects, or fix pre-existing damage
· page 77 that while coverage is on a ‘new for old’ basis, that does not mean of a better standard, specification or quality than when new
· page 78 that it will only repair the damaged parts, for example, where an external wall is damaged, it will replace the damaged parts of the wall but not the undamaged areas.
Complainant says insurer’s offers are inadequate
The complainant relies on N’s SOW/quote dated 11 November 2022 totalling $$76,890 for removal and replacement of the entire fence and its footing. The complainant says those works are necessary based on reports from engineer R.
R initially inspected the fence on 8 February 2024, and reported that:
· a shallow excavation revealed a concrete strip footing 300mm wide, 200mm deep, and founded on rocks at a depth of 300mm
· the fence and piers appeared to be adequately supported, albeit at a shallow depth by today’s standards
· however, a deeper footing may not be practical because of extensive rock in the area
· the impact had demolished a section of the fence and had destabilised adjacent sections
· ‘The most practical solution may be to demolish and rebuild the fence all along the [north] frontage’
· that approach would also provide the opportunity to check the footing and tie the new brickwork to the footing, that the piers to the brickwork
In a second report dated 29 November 2024, R said:
· it had no knowledge of the fence’s condition prior to the claim event, but the damage observed was consistent with having been caused by impact by a car
· all the north section of the fence appeared to have been damaged or moved by the impact, and required reconstruction
· it recommended that the base brickwork be connected by steel starter bars to the existing footing and that the fence be braced with strong engaged piers at two metre intervals
· if matching old and new brickwork was a problem, it may be necessary to reconstruct the entire fence to current standards with new bricks
· to rebuild to current standards/permit requirements, the existing footing would also have to be removed and replaced.
In a final report dated 17 April 2025, R advised that:
· the impact may have caused the existing footing rotate/move to some extent. If that was correct, it may be necessary to consider removing and reconstructing the footing
· it will be necessary to ensure all new construction complies with current standards
· the footing should be 300mm wide, at least 600mm thick, and founded at a depth of 700mm – depending on the presence of rocks
· loose rocks should be removed but large rocks/bedrock may remain if incorporated into the new footing
· the new brickwork should be effectively tied to the footing.
The complainant relies on an email dated 19 September 2024 from the inspector which said as the fence was within 9 metres of an intersection, if it was to be built at a height over a metre, a building permit would be required. The inspector also recommended a new footing system with steel reinforcement be incorporated even if the height was to be below a metre.
The complainant says R and the inspector support the need for a complete rebuild of the fence, including its footing. She also says the lack of current availability for the original bricks used reinforces her position. She submits that R’s opinion should be preferred over M’s because M spent little time at the property and its assessment was superficial at best.
Insurer’s cash settlement offer is not reasonable
I am satisfied that P’s SOW reasonably reflects the extent of the claim related repairs and is to be preferred over N’s SOW. This is because:
· the policy only requires the insurer to repair or pay the cost to repair the section of the fence damaged by the impact; it does not require the insurer to match/replace undamaged parts or to rectify pre-existing damage or to repair to a better standard or specification
· despite the complainant’s concerns about M’s inspection of the fence, I find its report persuasive. The report is detailed and logical, and M’s conclusions are supported by numerous images
· in contrast, R’s reports are less detailed and less conclusive. Notably, R does not definitively state that the footing was damaged or that the entire fence must be replaced due to the impact
· as the fence’s height was below 1200mm, the repair work will not require a building permit
· while the inspector has recommended a new footing system be installed, he does not say that is because of damage caused by the impact
· P’s SOW/quote reflects M’s SOW for the claim related repairs. It is detailed, itemised, contains measurements, and allowances for items typically paid by a consumer such as insurance and a builder’s margin
· in contrast, N’s SOW/quote is for replacement of the entire fence and its footing. It also contains few details, no itemisation, and no measurements.
However, P’s quote was prepared more than a year ago so will not reflect current pricing. It is therefore reasonable to require the insurer to obtain an updated quote from P reflective of current retail prices.
Within 14 days of receiving P’s updated quote, the insurer is to provide a copy to the complainant and pay her the quoted amount. As the quote will represent current pricing, there is no need to require interest to be paid on it.
In its cash settlement calculations, the insurer has not allowed an uplift for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs. It should have done so. I am satisfied a 15% uplift is reasonable.
While the insurer’s claim notes say the policy excess was paid, there is also an indication that it was to be refunded. If whether the excess is outstanding, the insurer is entitled to deduct it from its cash settlement payment.
2.2 Why is the outcome fair?
While P’s SOW is reasonable, it is fair that the insurer pays a higher cash settlement to reflect current retail prices and to allow for contingencies and loss of the insurer’s lifetime repair guarantee.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.