Home / Suncorp Group / Determination 12-24-159918

Determination 12-24-159918

Dispute over cash settlement limited to sum insured for fire-damaged main dwelling, and loss of rent for main house and cabin

FirmSuncorp Group
Decided2025-08-20
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$420,000
SourceAFCA PDF

Summary

After a fire damaged a rented main dwelling, the insurer offered maximum policy benefits, and the complainant sought a rebuild or higher cash settlement plus extra loss of rent. AFCA found for the insurer on the main house but required additional cabin loss of rent until power can be restored.

The complainant chose the sum insured and the renewal notice and PDS told him to check adequacy, so the insurer could limit settlement; the cabin rent period was underestimated because the main dwelling must be demolished before a new meter is installed.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-159918 | Financial firm | AAI Limited Case number: 12-24-159918 28 July 2025 1 Determination overview 1.1 Complaint The complainant lodged two separate claims for malicious damage to his cabin and main dwelling at the property. When the property was still under assessment, a fire occurred and damaged the main dwelling. A claim was also lodged for fire damage to the main dwelling. The insurer accepted the claim (fire damage) and offered to pay the maximum entitlements of $278,265.00 under the policy. The complainant says the amount is insufficient. The complainant wants the insurer to rebuild the property or increase its cash settlement. Additionally, the complainant also wants additional loss of rent for the main dwelling and the cabin. Did the insurer assess its liability for the main house fairly? Yes. The insurer fairly assessed its liability for the main house. Is the complainant entitled to additional loss of rent for the main house? No. The exchanged information shows the assessment of the property was not substantially delayed. Therefore, the insurer is not required to pay loss of rent beyond the policy’s limit. Is the complaint entitled to additional loss of rent for the cabin? Yes. The insurer is required to pay additional loss of rent for the time required to restore power to the cabin. Why is the outcome fair? The outcome is fair because the insurer offered maximum benefits available under the policy for the main dwelling including loss of rent. The information shows the insurer’s estimated time to repair the cabin is incorrect. As such, the insurer should increase payment for loss of rent to the cabin. 1.2 Determination The determination is substantially in favour of the insurer. Within 21 days of receiving notice of the complainant’s acceptance of this determination, both parties are to work together to ascertain the time required to restore power to the cabin. The insurer must take into consideration that the main dwelling must be demolished, and a new power meter needs to be installed. Once the timeframe required to restore power to the cabin has been confirmed, the insurer is to pay loss of rent for this period. 2 Reasons for determination 2.1 Did insurer assess its liability of the main house fairly? Yes. The insurer assessed its liability for the main house fairly. The policy covers the insured property against fire damage The policy covers damage caused by fire. Page 24 of the PDS states: What is covered Loss or damage caused by: • Fire (including bushfire); and • heat, ash, soot and smoke that is the direct result of a fire within 100 metres of the insured address. ​It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (meaning, more likely than not), a claimable loss has occurred which is covered by the terms and conditions of the policy. ​There is no dispute that fire damaged the property. The dispute is whether the insurer is responsible for the rebuild of the property or whether its cash settlement offer is fair. The insurer has shown it complied with the terms of the policy The fire damage occurred when the main dwelling was undergoing assessment due to an earlier claim for malicious damage. The insurer considers the fire damage claim superseded the malicious claim and assessed the property for fire damage only. The complainant did not dispute the claim should be assessed as fire damage. However, he says the sum insured stated in the renewal notice is not sufficient to rebuild the property. As he had relied on the insurer to provide adequate cover for the property, he says the insurer is responsible for the rebuild or increase the cash settlement offer. Both parties provided a large number of emails and correspondence during exchange. The complainant says: · he has made enquires with other insurers after the policy was cancelled and discovered the home is underinsured · if the insurer cannot rebuild the home with the sum insured amount, then it should not have insured the property · the insurer should have informed the complainant that the home was underinsured as it was aware of the specifications of the home · the insurer did not refer the complainant to a ‘rebuild calculator’ in the initial conversation to commence the policy. The complainant wants the insurer to repair the property or pay cash settlement of $350,000 for the damaged main dwelling and $70,000 for debris removal. In response, the insurer says: · it has offered to pay settlement up to the maximum benefits of the policy · the policy was incepted with a value of $170,000 as per the request of the complainant · the values of sum insured were indexed at a rate of 5% each year until the renewal in 2024 which was 9% · the indexation increase is an automated process and unless the complainant requests a higher amount, its system will increase the values at renewal as per its business rules · the renewal notice was provided to the complainant, and the onus is on the complainant to ensure the sum insured offered at renewal is sufficient for his needs. The insurer provided call recordings to confirm the complainant requested $170,000 when he incepted the policy and provided a revised quote from its builder BT to confirm the rebuilding cost is $482,036.39. The insurer has accepted the claim and there is no dispute that the cost of repairs exceeds the sum insured under the policy. The insurer is not responsible for the sum insured amount Based on the exchanged information, I am not satisfied the insurer is responsible for the sum insured amount. The complainant’s representative (daughter) called the insurer on behalf of the complainant during policy inception. The call recording shows she consulted with the complainant regarding the sum insured and the complainant requested cover for $170,000. While I acknowledge the complaint has provided the details of the home during policy inception, the complainant did not enquire with the insurer on whether the sum insured was adequate. Although there are other insurers that would not cover an underinsured property, the decision to accept an underinsured property remains the discretion of each insurer. In my view, the insurer is not required to follow other insurers’ process to refuse an underinsured property. Further, the insurer’s renewal certificate states: Please check the amount of cover meets your needs. Refer to your Product Disclosure Statement for full details. … Page 8 of the PDS also states: Make sure your sums insured are adequate Underinsurance can expose you to serious financial loss if a claim occurs. It is your responsibility to select a sum insured for the home and/or contents that meets your needs in the event that the home and/or contents are damaged or destroyed. To help you calculate the replacement value of the home and contents we provide a ‘Building calculator’, and a ‘Contents calculator’, that you can access at our website www.shannons.com.au. The complainant says he did not recall receiving the PDS but does not dispute receiving the renewal notice. Considering the renewal notice stated it is the insured’s responsibility to ensure he select a sum insured that meets his needs, I am satisfied the insurer has provided the necessary disclosure and it is not responsible for the sum insured of the property. As the insurer’s quote shows the rebuilding cost exceeded the sum insured amount, the insurer is entitled to limit its cash settlement amount in accordance with the policy. On that basis, the insurer is not required to increase its total cash settlement amount or carry out the rebuild of the home. 2.2 Is the complainant entitled to additional loss of rent for the main house? No. The exchanged information shows the assessment of the property was not substantially delayed. Therefore, the insurer is not required to pay loss of rent beyond the policy’s limit. Policy includes cover for loss of rent The policy has additional cover that includes rental loss. Page 36 of the PDS states: If your entire home is tenanted under a rental agreement and following an insured event the home cannot be lived in or cannot be re-leased, we will pay the weekly rental amount for the time it should take to repair or rebuild the home so it can be lived in again or re-leased. We will engage a builder to determine how long the repairs or rebuild should take. … Limit The longest period we will provide cover for is 12 months and the most we will pay under the feature is up to 20% of your home sum insured. Insurer is not required to pay additional loss of rent for the main house The complainant says the insurer cancelled the policy incorrectly during a malicious claim in June 2024 and this led to delay of repair. Further, the complainant also says that if he had been allowed to carry out the repair earlier then he would have been able to lease out the property earlier. The lease agreement shows the property was leased on 7 July 2024. The information provided by both parties shows the following: · the malicious damage claim for the main dwelling was lodged on 6 June 2024 · the insurer cancelled the policy on 7 June 2024 and the complainant received the letter on 14 June 2024. · the complainant disagreed with the insurer sending an engineer to the property. This is because he had no public liability insurance to cover anyone that may be injured · the insurer confirmed any trades attending the site would be covered by their workers cover and on 8 July 2024, the complainant agreed to allow the engineer to attend the site · the complaint lodged a complaint with AFCA (case 12-24-105737) in early July 2024 regarding the cancellation of the policy. · on 25 July 2024, the insurer informed the complainant it reinstated the policy and offered $2,000 non-financial loss which was accepted by the complainant. · the complainant lodged another complaint with AFCA (case 12-24-139262) on 4 September 2024 regarding the delay of the fire damage claim. This complaint was resolved when the complainant accepted $2,000 non-financial loss compensation in October 2024. After reviewing the above, I am not satisfied the insurer is required to pay loss of rent for the main dwelling beyond the policy limit. I am satisfied the complaint about the policy’s cancellation was resolved when the insurer reinstated the policy and offered compensation which the complainant accepted. Additionally, the rental agreement shows the main dwelling was rented out on 7 July 2024 which is roughly 4 weeks after the lodgement of the malicious damage claim. This means the rental commenced before the policy was reinstated and before the engineer was allowed to attend the site. Considering the nature of the claim and sequence of events, I do not consider the insurer caused substantial delay. This is because the property was already rented out even though the issues of policy cancellation and engineer conducting additional assessment were still in dispute. As the complainant would have continued to receive rental payments when the issues of policy cancellation and assessment were under dispute, the complainant did not suffer any substantial loss during this period. In relation to further delay regarding the fire damage, I note the insurer had also paid an additional $2,000 in non-financial loss compensation to resolve this in October 2024 which the complainant accepted. Therefore, I am satisfied the compensation amount offered for the delay is adequate. As such, the insurer is not required to pay additional loss of rent beyond the policy limit. 2.3 Is the complainant entitled to additional loss of rent for the cabin? Yes. The complainant has provided information to show the repair of the cabin is likely to take longer than the loss of rent offered by the insurer. The insurer is required to pay additional loss of rent for the time period required to restore power to the cabin. Insurer is required to pay additional loss of rent for the cabin The exchanged information shows the insurer offered to pay loss of rent for the cabin. The insurer had paid rental loss since the malicious claim and as a final offer, it agreed to pay further rental loss from the date it informed the complainant he could commence repair from 28 October 2024 to 23 December 2024. The insurer calculated the amount to be $3,714.28 and the complainant accepted this offer. However, when the complaint engaged an electrician to conduct repairs to the cabin, he was informed a new power meter box is required to restore electricity to the cabin. As the meter box is located at the fire damaged main dwelling, he could not carry out repair until a new meter box is obtained. This would require the damaged main dwelling to be demolished. The complainant says the insurer should have been aware that the power cannot be restored until the main dwelling is demolished as the insurer’s trades have visited the property numerous times. The complainant is seeking loss of rent for at least 17 weeks or until the demolition can occur to restore the electricity. The insurer did not provide any substantive response to this but says its builder (RCC) had advised the lead time to obtain a meter box would be 4 weeks. In addition, its builder BT had also advised the repair estimate to the main dwelling is 120 days and 8 weeks for the cabin. Based on the information provided, I accept the loss of rent offered for the cabin is insufficient to cover the repair period. While the insurer acknowledged the time to install the meter box would be 4 weeks, it did not dispute that the main dwelling must be demolished for electricity to be restored. The policy provides cover for a weekly rental amount for the time it should take to repair or rebuild the home so it can be lived in again or re-leased. Considering demolition of the property is required for the electricity to be restored, the insurer should take this into consideration and provide rental loss payments until a new meter box is installed. Therefore, both parties are to work together and to confirm the time require to restore power to the cabin. Once this is established. the insurer is to pay loss of rent for this period. 2.4 Why is the outcome fair? The outcome is fair because the insurer offered maximum benefits available under the policy for the main house including loss of rent. The information shows the insurer’s estimated time to repair the cabin is incorrect. As such, the insurer should increase payment for loss of rent to the cabin. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.