Home / Allianz Australia / Determination 12-24-159486
Determination 12-24-159486
Whether the $5,000 building code compliance sub-limit applies to a variation quote for roof repairs after hail damage, and whether NFL is payable for delay
Summary
The complainant disputed the insurer's application of a $5,000 building code compliance sub-limit to a $15,960 variation quote after hail roof damage, and sought $2,500 for delay. AFCA found the limit applied, the insurer's offer was fair and there was no unnecessary delay.
The variation was for costs of meeting current building codes, which the policy caps at $5,000, and the insurer did not unnecessarily delay the claim.
Issues
- Claim amount dispute primary · not upheld
“insurer has correctly applied the policy limit of $5,000 for 'building code compliance costs' in this instance”
- Delay secondary · not upheld
“insurer managed the claim promptly and transparently, with no unreasonable delays”
- Product terms interpretation secondary · not upheld
“complainant's argument that the structure was not non-compliant at the time of construction is irrelevant to the application of the sub-limit”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
|
Case number
|
12-24-159486
|
Financial firm
|
Allianz Australia General Insurance Limited
Case number: 12-24-159486 21 July 2025
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). On 15 August 2023, the complainant lodged a claim for roof damage from a hailstorm on 8 December 2022.
The insurer accepted the claim and offered to perform repairs. However, at the complainant’s request, the insurer issued a cash settlement for $93,838 based on a scope of works (SOW) and quote from its builder (AG).
On 6 August 2023, the complainant submitted a $15,960 variation quote from her builder (AC) to meet current engineering and building standards. The insurer approved the variation up to the policy limit of $5,000 (plus GST) for building code compliance costs and the engineer’s report from PG, including builder’s margin.
The complainant disputes the policy limit and seeks the full variation amount, plus $2,500 compensation for non-financial loss (NFL) due to delays.
A representative is assisting the complainant. Any reference within this determination to the complainant includes the representative unless otherwise stated.
1.2 Issues and key findings
Does the policy limit apply?
Yes. This is because the exchanged information shows the variation is for costs associated with meeting current building codes. The policy limits these costs to $5,000.
Is the complainant entitled to NFL?
No. The exchanged information shows the insurer did not unnecessarily delay assessing the variation claim.
Why is the outcome fair?
The exchanged information shows the insurer correctly applied the policy limit for building code compliance costs and agreed to pay for the engineer’s report. It would be unfair to require it to pay more.
The insurer did not unnecessarily delay assessing the variation claim. It would be unfair to require the insurer to pay NFL in this instance.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of being notified the complainant accepts this determination, the insurer is required to make payment to the complainant as set out in section 2.1 below.
2 Reasons for determination
2.1 Does the policy limit apply?
Yes. This is because the exchanged information shows the variation is for costs associated with meeting current building codes. The policy limits these costs to $5,000.
Policy covers insured events
The complainant holds a home building policy with the insurer for the period of 22 December 2021 to 22 December 2022. The policy is an ‘insured events’ policy.
One of the insured events listed under the policy is ‘storm, cyclone, rainwater or run-off.’
The parties agree the:
· roof is hail damaged
· complainant has established a claimable loss
· additional work is required to meet current building standards so AC can warrant repairs.
The dispute is about whether the insurer is entitled to limit the cost of this work to $5,000 in accordance with policy terms.
Complainant says policy limit does not apply
AC’s variation report and quotation dated 6 August 2024 says:
A Engineer has been Engaged to ensuring that the contractual requirements are being followed, technical specifications are being met, As per the Engineer suggestions Frame requirement is necessary to meet the current standard codes and required for certification.
In AC’s professional opinion, we have determined that the following additional works are required in conjunction to our Scope of Works to bring the property to a pre-event condition and to complete the overall works within accordance to the current BCA / NCC.
The complainant says PG’s report does not state the shed was non-compliant when originally built. She says this distinction is important.
PG refers to current non-compliance under today’s standards; not a defect in the original construction. This is because:
· building codes change over time; older structures may become non-compliant without any original construction fault
· PG’s report confirms current non-compliance, not non-compliance at the time of construction
· the need to upgrade was triggered solely by hail damage requiring roof replacement
· without the insured event, no upgrade would be necessary. Therefore, the upgrade is a direct consequence of the insured event
· under the policy, reasonable costs to meet statutory requirements must be covered; even if they exceed the $5,000 cap.
Insurer says policy limit applies
The insurer says the $5,000 policy limit for ‘building code compliance costs’ applies to the variation, as the expert reports from AB and PG confirm the work is necessary to meet current National Construction Code (NCC) requirements.
It says if the property was already compliant, the additional work would not be needed. The PDS clearly caps cover at $5,000 for statutory authority compliance costs related to damaged parts of the building.
The insurer rejects the complainant’s argument that the limit should not apply because the requirements were not in force when the property was built. It says this is irrelevant because this is an exclusion under the benefit for ‘building code compliance costs,’ not a condition for the application of the benefit.
Policy limit applies to variation
I have carefully considered all the exchanged information. I am satisfied the insurer has correctly applied the policy limit of $5,000 for ‘building code compliance costs’ in this instance.
This is because:
· building code compliance costs are a specific entitlement listed separately under the policy
· the benefit is triggered only if an insured event occurs and causes the damage to the subject building
· it is provided in addition to the cost of repairing insured damage
· it is automatically included at no extra premium and subject to a separate sub limit, conditions, and exclusions.
The complainant’s argument that the structure was not non-compliant at the time of construction is irrelevant to the application of the sub-limit. This is because the purpose of the sub limits is not to penalise past non-compliance.
Rather, it is to limit the insurer’s exposure to the increased cost of reinstating damaged property in accordance with current regulations. This is irrespective of whether the original construction was complaint at the time it was built.
Within 14 days of the insurer receiving notice the complainant accepts this determination, the insurer is required to cash settle the complainant:
· $1,800 engineer report + 20% Margin + 10% GST = $2,376
· $5,000 building code compliance benefit + 10% GST = $5,500
· Total $7,876
Uplift on cash settlement not appropriate
The resolve the complaint, the complainant says the insurer should offer an amount equal to a contingency based on the original claim value (for the transfer of risk and loss of lifetime repair guarantee) or the variation value, if lower, referencing a previous AFCA decision.
The insurer argues the previous decision is irrelevant, as it did not choose to cash settle the claim. Rather, the complainant’s representative declined repairs and insisted on a cash settlement. It did not ask for an uplift when the cash settlement in lieu of repairs was requested.
I am not satisfied an uplift on the original cash settlement is appropriate in this instance. The complainant has not highlighted any other potential variation costs or risks that may apply to the works. The loss of the lifetime guarantee, and the transfer of risk, is due to the complainant’s decision to seek a cash settlement.
Given all this, I am satisfied the insurer’s offer is fair.
2.2 Is the complainant entitled to NFL?
No. The exchanged information shows the insurer did not unnecessarily delay assessing the variation claim.
Insurer did not mishandle the claim
The complainant says she is entitled to $2,500 NFL for the unnecessary delays incurred on this claim.
The exchanged insurer records show it managed the claim promptly and transparently, with no unreasonable delays. It responded to the complainant’s emails, acknowledged information received, and provided requested documents without undue delay, including same-day complaint registration and acknowledgement.
The insurer’s previous cash settlements and its offer under this claim align with the policy provisions and demonstrate it acted reasonably. The complainant’s rejection of the offer does not indicate fault or delay on the insurer’s behalf.
Accordingly, I am satisfied, on balance, the insurer has met its obligations, and any perceived delays are not attributable to its conduct. It is not required to pay NFL.
2.3 Why is the outcome fair?
The exchanged information shows the insurer correctly applied the policy limit for building code compliance costs and agreed to pay for the engineer’s report. It would be unfair to require it to pay more.
The insurer did not unnecessarily delay assessing the variation claim. It would be unfair to require the insurer to pay NFL in this instance.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Policy terms
|
Page
|
Description
|
17
|
Storm, cyclone, rainwater or run-off
What’s covered?
Loss or damage caused by:
• storm
• cyclone*
• rainwater
• run-off.
|
31
|
Building code compliance costs
If you need to rebuild your home buildings after loss or damage, we’ll help pay the costs
of complying with any statutory requirements. This is an extra amount, paid in addition to your buildings sum insured. No excess applies to this benefit.
When we pay
We will pay this benefit when we have approved these costs before they are incurred. Please contact us to confirm approval.
How much we will pay
We will pay up to $5,000.
What’s covered?
The reasonable and necessary costs of meeting the requirements of any statutory authority that relate directly to the destroyed or damaged part of the buildings.
We will not pay for the costs of complying with the requirements of any statutory authority if you received notice of the requirements or were aware of them and had not complied with them before the loss or damage occurred.
|
|
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.