Home / IAG / Determination 12-24-159003

Determination 12-24-159003

Claim for escape of liquid damage to decks declined on basis of excluded causes (earth movement, maintenance) and repairs before inspection

FirmIAG
Decided2025-09-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$116,000
SourceAFCA PDF

Summary

The complainant claimed over $116,000 for home deck damage she said was caused by an escape of liquid, after carrying out repairs herself. AFCA found the insurer had shown the damage was from excluded causes and upheld the denial.

The insurer proved on the balance of probabilities, via the engineer's persuasive report, that the damage was from excluded long-term earth movement and maintenance issues.

Issues

Subjects and remedies

home or building damagethird party authorityno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-159003 | Financial firm | Insurance Australia Limited Case number: 12-24-159003 25 September 2025 1 Determination overview 1.1 Complaint The complainant holds home building insurance with the financial firm (insurer). On 5 April 2024, she lodged a claim for damage to her home due to an escape of liquid (EOL) from a leaking water pipe. The insurer denied the claim, saying the damage was likely not from EOL but was from excluded causes including long term earth movement and maintenance issues. Further, that in undertaking repairs without its consent and before it had the opportunity to inspect the damage, the complainant had breached her obligations under the policy. The complainant maintains that the damage was caused by the EOL, and that it had been necessary to undertake repairs on an urgent basis due to safety concerns. She wants the insurer to reimburse repair costs exceeding $116,000. The complainant is represented by her husband M, who is a plumber. For brevity’s sake, the complainant and M will be referred to below as ‘the complainant’ unless context requires otherwise. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. Based on the exchanged information, the insurer has established the damage was due to causes excluded from cover under the policy terms. Why is the outcome fair? As the insurer has shown it is more likely than not that the damage was from excluded causes, it would be unfair to require it to accept the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the claim. It is not required to take any further action. 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Yes. Based on the exchanged information, the insurer has established the damage was due to causes excluded from cover under the policy terms. Complainant must show a claimable loss under the policy terms ​​​​The complainant is required to show, on the balance of probabilities (that it is more likely than not), that she suffered a loss claimable under the policy. This means she must show the loss was caused by a risk for which she is insured. ​​​​Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainant for accidental damage to her home. The PDS defines ‘accidental’ as ‘a sudden, unexpected and unintended event’ the insured did not intend or expect and a reasonable person in their position would not have expected. ​​​On 5 April 2024, the complainant notified the insurer that EOL from a leaking waterpipe had caused significant damage to her home, including to the rear balcony. ​​​​Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. ​​Insurer denied the claim On 7 April 2024, M informed the insurer he had undertaken emergency make safe repairs. The following day, the insurer appointed builder AI, to undertake an assessment of the damage. After inspecting the home on 10 April 2024, AI reported that: · the complainant said a burst pipe in the rear yard had caused the lower and upper decks to subside. M had already repaired the burst pipe · it was unable to inspect either of the decks as they were already under construction with new footings and posts already installed. The staircase had also been moved · it recommended an expert causation report be obtained. On 30 April 2024, engineer CE inspected the home. CE reported to the insurer that: · the affected decks were at the northwest corner of the home · there were multiple large trees adjacent to the southern elevation · a floor level survey showed a pattern of non-uniform settlement towards the southern elevation and the northeast wing of the home, with 66mm the total differential movement · real estate images establish that the lower deck cracking damage and ceiling deterioration were pre-existing. There was also evidence of historical repairs to the upper deck · publicly available satellite images establish that a large tree adjacent to the eastern elevation had been removed between August and October 2021 · the linings, cladding and soffits at the northern elevation had sporadic minor crack damage · the home was showing no signs of crack damage to structural members from foundation movement, but there was evidence of some long-term stress in the brittle linings from differential settlement, resulting in cracking · the 20mm maximum design differential deflection for masonry veneer had been exceeded · the level of crack damage was low considering the amount of foundation movement, and was consistent with longer-term gradual movement · if the amount of the differential foundation movement was from a recent event resultant damage would be expected but none had occurred · the pattern of settlement was consistent with the drying effect of trees, potentially exacerbated by a set down in the apron slab for the air conditioning unit which would allow water to pond against the footings and seep into the subgrade · there was no evidence of settlement towards the northwest corner in the area of the EOL · there was no evidence of movement-related damage to the home · there was no evidence of EOL related damage to the decks. If any such damage had occurred, evidence of it had been removed by the complainant’s ongoing repair works · ‘a localised escape of liquid may have resulted in some differential settlement to the posts supporting the deck; however, the likely resultant damage, if any, would not require modifications to the decks as documented onsite’ · the observable damage to the decks was pre-existing and consistent with long term maintenance issues · the repair works were excessive and had been poorly/defectively undertaken. The insurer also submits that the complainant’s water bills did not show a significant change in water flow around early April 2024 to support the damage claimed was from an EOL. The insurer says that the complainant has not established a claimable loss, and that it is entitled to rely on policy exclusions set out on page 19 of the PDS which preclude cover for: · damage directly caused by earth movement, unless the damage occurs within 72 hours of and is directly caused by (relevantly) EOL – in which case $10,000 limit applies · damage directly or indirectly caused by or arising out of: > a structural fault, faulty design or workmanship performed by the insured > a structural fault, faulty design or workmanship if the insured knew or ought to have known about but did not fix before the damage occurred or commenced to occur > lack of maintenance. The insurer also notes that the PDS confirms on page 24 that the policy does not cover the cost to repair or replace the faulty part that has led to an EOL. However, the insurer paid the policy benefit for the cost to locate the EOL, less the applicable excess. In addition, the insurer says the complainant has breached a general condition set out on page 11 of the PDS. That condition requires an insured to not without the insurer’s prior consent to repair or dispose of any damaged property until it has had the opportunity to inspect the damage, provided it is reasonable and safe to do so. The insurer says the complainant did not obtain its prior consent before undertaking make safe work. Further, that the work that the complainant performed was permanent repairs rather than make safe work. It says the complainant’s actions mean it is not possible to further investigate the coverage position. Complainant says insurer should accept the claim The complainant maintains that the insurer should accept the claim as covered under the policy and reimburse her the repair costs she has incurred. She says when she lodged the claim, the insurer told her that under the PDS she could attend to temporary repairs if the damaged area was unsafe. She says it was necessary to promptly attend to repairs to prevent further damage to the home and because the decks presented a major safety concern to its occupants which included young children. The complainant has provided a photo of a water pipe with a high-pressure leak. The pipe is in an excavation partially filled with water. It is not possible to determine the location of the pipe/excavation from the photo. She has also provided a quotation dated 20 May 2024 from CR, roof plumber. CR said it had ‘noticed some structural damage on the back awning decks and roofing area, which has been caused by building movement etc’. CR recommended repairs be undertaken as soon as possible due to concerns further structural issues could develop. In addition, the complainant has submitted accounts issued by her water utility. The accounts show the complainant’s average daily water usage: · from 30 November 2023 to 8 March 2024, was 1,690 litres, which was basically the same as the previous billing period (1,692 litres) and slightly less than the same period the previous year (1,760 litres) · from 9 March 2024 to 29 May 2024, increased to 2,317 litres, which was significantly higher than the same period the previous year (1,540 litres) · from 30 May 2024 to 23 August 2024, dropped back to 1,779 litres, which was still higher than the same period the previous year (1,686 litres). The complainant also says the claim was lodged before repairs were commenced. She has submitted the following invoices rendered by M’s plumbing company E, of which it appears she is the sole director: · dated 11 April 2024, totalling $57,487.87 for works from 11 March to 6 April 2024, being: > investigate balcony problem and rear subframe structure collapse > identify burst water pipe underneath pier, remove and replace damaged pipe section > ‘The pipe work was causing pier to drop and the sub frame of balcony above to also drop and causing the back end of the house to twist also’ > engaging and liaising with insurer > meeting with building loss adjuster 10 April 2024, · dated 16 April 2024, totalling $24,460.70 for carpentry from 23 March to 14 April 2024, and further restoration on 14 April 2024. ‘Stabilisation of back balcony area including further pier works and excavation underneath decking in order to get pier works done’ · dated 24 April 2024, totalling $15,388.88 for work carried out from 19 to 23 April 2024, including stormwater pipe replacement, checking water lines, and cleaning · dated 16 May 2024, totalling $5,944.40 for carpentry from 21 April to 4 May 2024, and more restoration on 24 April 2024. Back balcony rail repair to secure balcony and stairs to prevent falls. ‘Please note we are only doing necessary to make safe the area as required’ · dated 28 May 2024, totalling $12,868.90 for works from 22 to 27 May 2024, primarily rectification of concrete encasing sewer and stormwater pipes to enable occupants to use laundry and side passage safely, and associated cleaning. Insurer is entitled to deny the claim Based on the exchanged information, I am satisfied that the insurer has established the damage was due to causes excluded from cover under the policy terms. This is because: · CE has concluded that the claimed damage is not from an EOL but is the result of long-term earth movement and pre-existing maintenance issues · CE’s report is detailed and well-reasoned, and its conclusions are supported by scientific data and numerous images. I find those conclusions persuasive, particularly in the absence of contrary independent expert opinion on causation · I am not satisfied that M is an independent expert or appropriately qualified to comment on construction or structural issues rather than plumbing issues · CR does not comment on causation · while I accept that there was a notable increase in daily water usage from 9 March 2024 to 29 May 2024, there is no persuasive independent evidence confirming that was from an EOL or that such an EOL caused the damage claimed · the policy excludes the cost to repair or replace the faulty part that has led to an EOL · I am not satisfied that the insurer provided prior consent to the complainant undertaking make safe work, or that the work she undertook was only make safe work · the dates contained in E’s invoices establish that a significant amount of work was undertaken prior to the claim being notified. The insurer has established the damage is excluded. It is therefore entitled to deny the claim. 2.2 Why is the outcome fair? As the insurer has shown it is more likely than not that the damage was from excluded causes, it would be unfair to require it to accept the claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.