Insurer declined water damage to ceilings (alleged steam from hot water system) and loss of rent; complainant also sought non-financial loss for claim handling delay
Text of the determination
Determination
|
Case number
|
12-24-155139
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-24-155139 31 October 2025
1 Determination overview
1.1 Complaint
The Body Corporate (BC) holds a residential strata insurance policy underwritten by the financial firm (the insurer). The complainant is a beneficiary of the policy and is represented by a broker.
On 5 April 2023, a claim was lodged for water damage to the lighting, walls and ceilings of the complainant’s unit from a roof and hot water system (HWS) leak. The insurer accepted the claim for the hallway ceiling (covered damage) which it offered to cash settle. The insurer declined cover for damage its assessor found to ceilings in bedroom 2 and lounge. The insurer says the damage was not due to steam, and that damage due to steam is excluded by the policy. Rather it says, the damage is due to water ingress from the roof caused by faulty design and workmanship which is also excluded by the policy.
The complainant says the policy covers the damage to the lighting, walls and ceilings for steam escaping from the HWS. He says the insurer should cover the disputed damage and pay non-financial loss compensation for delays, he says, are due to its claims handling.
The complainant is represented in the complaint. For simplicity, in this determination, the complainant and his representative are referred to as ‘the complainant’.
1.2 Issues and key findings
Is the insurer entitled to decline the disputed damage?
Yes, the insurer is entitled to decline the damage. This is because the complainant has not met his onus to show the damage is due to an Event covered by the policy. Further, damage due to steam and condensation is excluded by the policy terms.
Is the complainant entitled to loss of rent costs?
No, the complainant is not entitled to loss of rent costs. The insurer is not required to cover the damage, therefore the loss of rent benefit is not payable.
Is non-financial loss compensation payable?
Yes. The insurer has caused some of undue delay and inconvenience in handling the claim. The insurer is to pay the complainant $1,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair because the insurer has established the cause of the damage is excluded under the policy. There is also no supporting information to show the insurer should be liable for loss of rent costs during the repair period. The insurer is required to compensate for its delays.
1.3 Determination
This determination is in favour of the insurer.
If this determination is accepted by the complainant, the insurer is entitled to decline the claim and is to:
· cash settle the covered damage with the complainant for its quote $2,211 (less excess)
· pay the complainant 1,000 in non-financial loss compensation within 14 days of being notified of the complainant’s acceptance.
2 Reasons for determination
2.1 Is the insurer entitled to decline the disputed damage?
Yes, the insurer is entitled to decline the damage. This is because the complainant has not met his onus to show the damage is due to an Event covered by the policy. In any event, damage due to steam and condensation is excluded by the policy terms.
A valid claim must be established
The complainant must establish, on the balance of probabilities, a loss was suffered caused by an event to which the policy responds. This is known as a valid claim.
The complainant is brought by the lot owner of a unit (unit 5) that is part of a strata unit development insured by the Body Corporate under a residential strata insurance policy.
If a valid claim can be established, the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny the claim.
Initial assessments of damage
In July 2022, the complainant’s plumber, CP, removed and replaced a faulty hot water cylinder in the unit. During this process, CP noted there could be a possible roof leak and recommended further investigation.
The insurer engaged assessor, AS, to assess the damage. AS’s building assessment report, with photos, is dated 8 May 2023 and says:
· the property agent advised that there has been an escape of liquid from the ducting in the hallway resulting in staining to the ceiling and the insured had advised that a previously repaired roof leak had caused water damage to bedroom 2 ceiling and water marks to the ceiling of the lounge and hallway
· damage to the hallway ceiling was caused by escape of liquid from the air conditioner
· water damage to bedroom 2 and the lounge room was due to a roof leak which had since been fixed
· as the cause of damage was consistent with both an escape of liquid and storm event/roof leak a separate claim may need to be made
· a repair cost estimate for $9,855.56 was provided.
The insurer asked the complainant to lodge a second claim relating to water ingress from the roof.
The complainant arranged for plumber/roofer, BP, to conduct a roof inspection. BP’s report, with photos, is dated 26 June 2023 and says:
· the box gutter above unit 5 has been replaced, the other five gutters are still the original old box gutters
· the old box gutters on the roof have no overflow, and during heavy rainfall or a box gutter is blocked there is a chance that they would overflow straight into the ceiling space above the top units
· it believes that the six box gutter outlets are not coping with the amount of water that is coming off the cement slab roof and is causing overflow of the concealed box gutters.
Secondary assessments of disputed damage
The complainant did not lodge a second claim for the storm/roof leak. The insurer obtained two repair quotes for the two different insurable events to separate the costs for each event. Given a second claim was not lodged for the storm/roof leak, the insurer then offered cash settlement as requested by the complainant who wished to use his own trade. The insurer’s settlement offer was based on its repair quote of $2,211 less $1,500 excess.
The complainant was unhappy with this as he believed the whole claim would be approved. That issue is dealt with below. On 31 August 2023, the complainant rejected the insurer’s offer and said that he was claiming damage to all the ceilings due to steam being released into the ceiling cavity by the hot water system. On that date, the complainant provided report and quote number 2047 for $80,954 from RB. That report is dated 14 December 2022 and relevantly includes:
In my opinion there seems to be dampness gaining entry in ceiling void, this has caused plaster to sag/crack, cornice is warped and cracked, I'm not sure even if the roof has been sarked. Nearly every room, the ceiling has dropped which means glue has let go holding the plaster up, the only way to fix this is to remove it and fit new plaster
…
NOTE - The roof needs to be inspected and rectified for any problems that are present before this works starts.
- No responsibility for any future leaks from the ceiling after our works have been completed.
The insurer appointed loss adjuster, IA, to further investigate and assess the ceiling damage. IA attended the property with builders, JJ, on 21 September 2023 and has provided a report that says:
· the unit was undergoing extensive renovations with all but the ceilings removed
· the HWS is located in the building service duct in the back bedroom wall (diagram was provided)
· it was unable to find any evidence that would indicate that steam had entered the ceiling cavity and caused the damage
· the ceilings are attached to the underside of the concrete slab above by way of battens and without openings into that very narrow space. Steam would be very unlikely to enter the gap between the ceiling sheets and the concrete slab above
· it appears that all internal walls reach to the underside of the concrete slab effectively sealing the ceilings off from each room
· it was unable to find any evidence that would indicate that steam had allegedly entered the ceiling cavity to cause the damage
· a section of ceiling and cornice in another bedroom (pointed to in black on the attached floor plan) is sagging, as shown in photos provided. That is directly above where an air conditioning had been mounted on the wall.
The insurer provided a report from JJ, who attended with IA on 21 September 2023, and says that:
· ceilings are sagging in the bedrooms but appear to be pre-existing due to age
· it its opinion, damages were caused by age and pre-existing conditions and not due to steam from a different room.
In November 2023, the insurer engaged engineer, IE, to provide further investigation and assessment on the cause of damage, to ensure the accuracy of the findings. Due to the unit renovations, IE was unable to carry out an assessment.
The insurer sought information from CP, who had replaced the HWS. IA says that CP ‘recall it being a 50l Unit in the cupboard in the back bedroom and water was leaking into the tray – not steaming but there was condensation in the cupboard’.
The complainant has provided a letter dated 11 March 2024 from builder, PP, who completed the renovation work. PP says:
· it was aware that the main HWS had been replaced due to steam/water vapour gaining entry into the ceiling void
· the resulting damage has caused the ceiling plasterboard and cornice to crack and drop and therefore the only way to address this damage is to remove the ceiling/cornice and fit a new ceiling
· it was aware the Body Corporate has confirmed the roof was in good condition as a report had been carried out confirming it was in good condition
· while we were stripping out the unit the loss adjuster carried out an inspection to see the damage to the existing ceilings before we had taken them down.
The policy provides cover subject to terms and exclusion
The policy is made up of the Policy Schedule and Policy Wording. Cover is provided under Section 1 Property: Physical Loss, Destruction or Damage as follows:
1. Cover
This Section covers:
Physical loss or destruction of or damage to Insured Property caused by an Event occurring during the Period of Insurance and not otherwise excluded
Event is defined as:
An occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to Insured Property.
The exclusions for Section 1 are relevantly set out as follows:
3. Exclusions Applying to this Section
The following exclusions apply to Section 1 in addition to the General Exclusions.
…
3.2 We will not cover physical loss, destruction or damage caused by or arising directly or indirectly from:
…
d) steam or condensation;
…
l) mildew, mould, wet or dry rot;
…
Insurer is entitled to decline the claim for damage due to steam
While I accept there was some water ingress or damp in the unit and that some ceilings have sagged, on balance, I am not satisfied that the complainant has shown an occurrence (release of steam from the HWS) resulted in sudden and unforeseen, physical loss or destruction of or damage to the ceilings. That is because:
· I am not persuaded that the damage was due to steam from the HWS. My reasons for that are:
> it is clear from CP’s information that the HWS was pressurised, faulty, leaking water and was replaced in July 2022. The expert reports do not say that the HWS was releasing steam. EP says it was possible that it was releasing steam but only reported condensation in the cupboard.
> the HWS is located in a service duct in the rear bedroom. I am persuaded by IA’s information that the internal walls reach the underside of the concrete slab, thereby sealing the ceilings off from each room
> RB’s report prepared in December 2022, within six months of the HWS replacement. It does not indicate the damage was due to steam from the HWS or other source, rather it indicates a possible roof issue
> JJ did not find any evidence of steam related damage to the ceilings
> I acknowledge PP’s information. however, PP does not set out the basis of his ‘awareness’ that the damage is due to steam
I accept that the damage may have been unforeseen. However, the exchanged information does not show, either that the steam immediately caused the ceiling damage or that the steam immediately had an effect on the ceiling material such that it was always going to fail once it was exposed. Therefore, I am not persuaded, on the balance of probabilities, that sudden physical loss or destruction of or damage to the insured property occurred.
In any event, even if the damage was due to steam, I am satisfied that damage caused by or arising directly or indirectly from steam or condensation is excluded by the policy terms.
As I have determined that the insurer is entitled to decline the claim, I do not need to consider whether the complainant’s renovations prejudiced the insurer’s right to further assess the damage.
Insurer not bound by complainant’s understanding that claim was accepted
The complainant says that the insurer led it to believe that the claim had been accepted in full and that its communication was misleading. On that basis, it says, the complainant commenced renovations on the unit. The complainant says it had left the property unrepaired for six months to allow the insurer to assess the damage.
The complainant has provided an email it sent to the insurer on 11 June 2024 that includes the following
I refer to a telephone conversation with [representative] on 04/06/2024 at around 2.50pm where it was implied that the claim outcome would be in our clients favour and we are only awaiting the final YES from [insurer]. [Representative] did state over the phone that she could not put this in writing to me.
I also had a similar conversation with a claim consultant prior to this however I cannot locate the date and time
I acknowledge the complainant expected the complaint would be accepted. However, to the extent this is claimed, I am not persuaded that the insurer is required to cover the damage on account of this. That is because:
· the complainant’s description of the communication was that the insurer ‘implied’ that it would be in their favour. This is less than a clear acceptance
· the insurer said that it would not provide written acceptance at that point communicates that the final decision had not been made.
· on balance, I am not satisfied that the complainant has shown that it acted on this information to his detriment.
2.2 Is the complainant entitled to loss of rent costs?
No, the complainant is not entitled to loss of rent costs. The insurer is not required to cover the disputed damage, therefore the loss of rent benefit it not payable.
Complainant is claiming for loss of rent
The complainant is claiming for loss of rent costs incurred during the time the unit has been unable to be rented.
Pages 19-21 of the PDS state:
Following physical loss, destruction or damage covered under this Section 1 of the Policy (or in other circumstances described in any of the Additional Benefits B below), We will also pay, in addition to the Sum Insured, the following amounts, costs and expenses incurred in consequence of the physical loss, destruction or damage:
[…] i) Loss of Rent
Where the Lot is leased out or would have been leased out, the Loss of Rent incurred by the Lot Owner if the Lot or Common Area is made unfit to be occupied for its intended purpose.
We will pay from the time of the physical loss, destruction or damage until the time the Lot is re-let following completion of reinstatement or replacement of Your Insured Property, provided the Lot Owner takes all reasonable action to obtain a new tenant.
The complainant and the insurer have confirmed the unit was unavailable during EP’s repair works from 18 July 2022 to 20 July 2022. The complainant states there was mould in the unit from 6 July 2022 to 4 August 2022.
Insurer is not required to cover loss of rent
Given the insurer is entitled to decline the disputed damage due to it being excluded under the policy, the additional benefit is not triggered under the policy as the damage is not covered under Section 1 of the policy.
To the extent that the insurer accepted escape of liquid damage to the hallway ceiling, the complainant does not say, and the exchanged information does not show, that that this caused the unit to be unfit to be occupied for its intended purpose.
2.3 Is non-financial compensation payable?
Yes. The insurer has caused some of undue delay and inconvenience in handling the claim. The insurer is to pay the complainant $1,000 in non-financial loss compensation.
Complainant seeks compensation for non-financial loss
The complainant seeks compensation for non-financial loss caused by the insurer’s handling of the claim due to the impact in the delay in handling the claim.
AFCA can award compensation for non-financial loss
Under AFCA’s Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. AFCA considers the severity and impact of the insurer’s conduct on the particular complainant.
Insurer required to pay $1,000 in non-financial loss compensation
Based on the information provided, I am satisfied the insurer has caused some delay and inconvenience in handling the claim. The insurer’s assessors recommended the complainant lodge a second claim for a possible roof leak. It is unclear why the insurer did not itself engage the relevant experts to assess the roof while investigating the claim. I accept that the complainant may have contributed to delays due to not lodging this claim, sometimes unclear communication and not providing the insurer with all relevant documents in a timely manner. However, I am satisfied that the insurer inconvenienced the complainant as they had to engage their own roofing expert to assess the roof. Had the insurer completed a thorough initial investigation irrespective of whether the complainant lodged a second claim, this delay would not have occurred.
Given AFCA’s approach, it is fair in the circumstances for the insurer to pay the complainant $1,000 in non-financial loss compensation.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer is able to rely on the policy terms and conditions to limit its liability and decline the claim. All provided assessments and expert reports conclude the cause of the disputed damage is excluded under the policy.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.