Home / Allianz Australia / Determination 12-24-154395

Determination 12-24-154395

Partial claim denial for flood damage after storm; excluded as flood not covered; claim handling and delay

FirmAllianz Australia
Decided2026-01-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,500
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

Storm and flood damaged the complainant's home; the insurer covered storm ingress but denied flood damage as no flood cover was held. AFCA upheld the denial but required $1,500 for electricity, moving and storage costs and increased non-financial loss compensation by $3,000.

Damage was more likely caused by flood, which was excluded as flood cover was not purchased, but the insurer's communication and delays warranted additional non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-154395 | Financial firm | Allianz Australia Insurance Limited Case number: 12-24-154395 9 January 2026 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under her home and contents insurance policy. Storms caused significant damage to her home. This included water entering via the roof and three bathroom drains on or around 29 January 2024. The insurer accepted the claim for resultant damage caused by the storms entering the property via the roof. It refused cover for the remaining damage to the home and contents on the basis the damage was caused by flood, for which there was no cover under the policy. The complainant seeks the insurer to accept the claim for the discarded water damaged contents and pay compensation for its claim handling. She had discarded the contents based on the insurer’s remediation expert’s (XC) advice. 1.2 Issues and key findings Is the insurer’s settlement fair? Yes. The insurer cash settled the claim for resultant storm damage to the property. It was entitled to deny liability for flood damage to the building and contents because the complainant had not purchased flood cover. The complainant was aware she had no cover for flood damage under the policy. There is a lack of evidence showing the insurer, including its representatives, misled the complainant about cover for the damaged contents. The insurer’s settlement offer for electricity, moving and storage costs is fair in all the circumstances. Is the insurer required to increase the compensation offer? Yes. The insurer had no control over certain aspects of the claim, including expert attendance and reporting. However, the insurer’s overall claim handling, including communication and delays, caused significant stress, inconvenience and frustration to the complainant. Why is the outcome fair? The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy. 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to pay $1,500 for electricity, moving and storage costs and an additional $3,000 non-financial loss compensation. The insurer is otherwise not required to take any other action in relation to the claim or this complaint. 2 Reasons for determination 2.1 Is the insurer’s settlement fair? Yes. The insurer cash settled the claim for resultant storm damage to the property. It was entitled to deny liability for flood damage to the building and contents because the complainant had not purchased flood cover. The complainant was aware she had no cover for flood damage under the policy. There is a lack of evidence showing the insurer, including its representatives, misled the complainant about cover for the damaged contents. The insurer’s settlement offer for electricity, moving and storage costs is fair in all the circumstances. Complainant must establish a claimable loss When making a claim, the complainant has the initial onus of establishing she suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim. Policy cover is subject to terms and conditions The certificate of insurance states: You're not covered for flood You have chosen not to apply for the optional cover for flood. This means that you are not covered for loss or damage to your buildings and/or contents caused by or arising from flood. The policy covers loss or damage caused by storm, cyclone, rainwater and run-off (provided run-off is not combined with flood waters). The policy does not cover loss or damage caused by flood. The policy defines flood as the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: · a lake (whether or not it has been altered or modified) · a river (whether or not it has been altered or modified) · a creek (whether or not it has been altered or modified) · another natural watercourse (whether or not it has been altered or modified) · a reservoir · a canal or · a dam. Parties provided different views on the policy cover for the damage The complainant says: · she discarded contents based on XC’s advice that her loss would be covered. XC had advised her to take photos and discard the damaged contents · the insurer’s delays caused significant additional damage to the property · skirting board damage to multiple rooms as they were ripped off in the dark. Remaining skirting boards were replaced by a grant from the Salvation Army · the insurer should compensate her for: > discarded contents and additional damage to contents because of its delays > lack of solar panel input due to power being cut off for six months > wall damage and holes drilled into cabinetry > carpets damaged due to attempting a makesafe which wasn’t completed and continued to cause water damage to the property. XC never returned to complete the makesafe > reimbursement for moving boxes and storage > tiles damaged in dining room where furniture was left to rust over tiles. This was because XC did not return for weeks to complete the make safe works · failing to remove all the water damaged carpets caused further damage to the walls and doors. The insurer says: · the available expert evidence indicates the damage to the property was caused by flooding from C Creek. The damage from the water that flowed out of the drains was declined as this was a result of a flood · the complainant had elected to not take the optional cover for flood in her policy · power could not be restored as this involved repair of flood related damage · an ex-gratia payment for $1,000 was raised to the complainant on 15 August 2024 · a statutory declaration signed by XC confirmed they did not advise the complainant her claim was covered · the available information confirms the damaged contents were contaminated with blackwater and were non-salvageable · the complainant did not accept a further compensation offer of $1,500. This was sufficient to compensate the complainant for the loss of electricity, and costs of moving and storing boxes · only the affected areas of the carpet were removed and at the time of the inspections, there was no microbial growth present within the area. Complainant established storm damage to building and contents The responsibility remains with the complainant to show the property sustained damage from the storm and stormwater run-off. The complainant did not purchase the optional cover for flood and there is no cover for damage to building and contents caused by the flood. The roof report concluded the roof was nearing its serviceable life span and is required to be replaced to ensure it is watertight for insurance purposes: · roof had several minor patch repairs completed in sections and has been painted · roof had damages evident consistent with historic hail event to all elevations of the main house roof. I am satisfied the insurer is not obliged to accept the cost of roof repairs. It however accepted cover for the resultant storm damage to the building and contents. It has cash settled the complainant for the storm damage repairs to the internal area(s), mattress/bedding and a fan. It also reimbursed the complainant for the service of the biocycle system including the replacement of the flood damaged aerator. No cover for flood damage to building and contents The insurer appointed a hydrologist (WM) to provide an expert opinion on the cause of the inundation. WM concluded that the building and contents (apart from those affected by the stormwater ingress) were not damaged by stormwater but instead flood. WM noted the following from the complainant: · the complainant went to sleep at 10pm on 29 January 2024 · at 1am the complainant awoke to find that the water inundating the home was ankle deep in the sunken lounge. At this time, water was bubbling from the shower drains in the bathrooms. WM observed: · short duration rainfall typically associated with stormwater inundation was ‘infrequent’; however, the peak 1-hour and 1.5-hour rainfall bursts came at the end of a very intense 3-hour burst of rainfall. The initial 1-hour burst of 44 mm has an Annual Exceedance Probability of flood risk (AEP) of between 50% and 20%, which is a much lower intensity and would not be expected to result in stormwater inundation · the longer, 3-hour storm duration, corresponded to an AEP of greater than 1 in 200. This is classified as ‘rare’. The rainfall of this intensity over three hours would be anticipated to result in significant flooding of local waterways · flood mapping for the area published by the regional council shows the subject property inundated to depths between 0.5 m and 1 m in a 1% AEP design flood event · visual inspection at multiple locations upstream of the subject property revealed flood debris caught out of the bank indicating that flood water had escaped C Creek in these areas · photos provided by the complainant showed that C Creek was flowing out of the bank through the property at a level sufficient to inundate the home. There was evidence of silt laden water and muddy deposits both inside and outside the home · the water bubbling out of the shower drains is likely as a result of rising floodwater surcharging the sewer system. The plumber’s report dated 3 June 2024 states: Possible causes: Item 1 – The water running down the hill was extremely fast flowing and had risen just below slab level may have caused water to flow up through the internal floor waste via the overflow relief gully. Item 2 - The water level outside the house rose above the slab level and then pushed up through the open overflow grate through the floor wastes. Conclusion: As there is no external flood height evidence found we cannot confirm which of these events listed above occurred. The plumber’s report above is inconclusive on the cause of the damage to the property. The additional information from the complainant about how the biocycle system operates was referred to WM for further comments. I find WM’s investigations and assessment logical, thorough and adequate in assessing the likely cause of the damage to the property. The complainant has not provided any expert information supporting her position. WM concluded the floodwater had likely entered the property via the biocycle system. The repair invoice of the biocycle system states the aerator sustained flood damage. The complainant confirmed the water entered the property via the drains only and this was through the biocycle system. Given the above, the timing of the events including the photographic evidence presented by the parties, I am satisfied that on the balance of probabilities, the damage to the property was caused by flood and not stormwater. The insurer is therefore entitled to deny this part of the claim. Lack of evidence complainant was misled about cover for damaged contents I acknowledge the complainant says she initially discarded some of her contents based on XC’s advice the claim was covered. XC had advised she could take photos and discard the water damaged contents. The insurer and its representatives, including XC, say no such advice was given to the complainant. The complainant also says the insurer confirmed cover at claim lodgement. I have listened to the phone discussion between the complainant and the insurer’s representative at claim lodgement. While the representative indicated storm damage would be covered by the policy, she also said this will be further assessed and confirmed by the relevant team. I am not satisfied the representative misled the complainant to believe any flood damage to the building and contents would be covered under the policy. XC has presented a statutory declaration signed by the employees who attended the property stating: · it never instructed the owner of [insured address] to dispose of non-restorable items without prior approval from their insurer · it did not advise the owner of [insured address] that their claim would be approved by their insurer. The complainant says she too could present statutory declaration from her husband and family who were present when XC advised her claim would be covered. I acknowledge a large rubbish skip was provided on site for unsalvageable items. The complainant says this clearly showed the restorers intended to throw the remainder of the unsalvageable contents. The complainant had at this stage believed she was covered. However, I do not agree the provision of the skip bin to discard unsalvageable contents meant the claim was accepted or that the damaged contents were covered. While I acknowledge the complainant’s concerns, the complainant was aware she had no cover for flood damage under the policy. Given all the above, I am not satisfied the complainant has shown the insurer or its representatives misled her to believe the discarded contents would be covered under the policy. The insurer says the property has experienced a sewage overflow, septic back-up, or flooding involving sewerage. All blackwater-affected contents and materials must be safely removed and disposed of to ensure the property is safe for occupancy and to comply with public health standards and protocols. I accept the complainant’s submission that she may have been able to professionally clean some of the damaged contents. This however would depend on the extent of damage sustained and the type of material of the contents. This is not relevant because I am satisfied there is a lack of evidence from the complainant showing the insurer or its representatives misled the complainant about cover for the damaged contents. Insurer’s settlement offer for other costs is fair The complainant says the insurer’s delays caused further damage to the property. XC attended the property on 30 January 2024. XC’s report states: · plasterboard wall lining and carpet flooring is holding elevated moisture levels · carpet is non restorable due to CAT 3 event · as approved by the complainant and supervisor, it removed accessible sections of affected carpet, underlay and smooth edge. Materials removed were disposed off-site · no visible microbial growth or odours observed in affected area · it treated affected area with antimicrobial · no power in property to install equipment. If works proceed, XC recommend the following works: · temporary power to be installed at property by electrician. · contents to be removed from the property to complete decontamination · non-restorable carpet and plasterboard wall linings to be stripped out · sanitisation to be completed throughout property due to category 3 event · drying equipment to be installed as required following treatment. The claim notes show the insurer shared WM’s findings soon after it received the report in early April 2024. The complainant provided additional information which were referred to WM for comments. The complainant sought the insurer to turn on the power so that she could commence the drying process. She also raised concerns about the loss of income via the solar panels and the cost of electricity incurred despite the power being off. While there was no power during XC’s initial attendance as above, the claims notes show the electrician J had initially reinstated power temporarily to the entire house. The power was then disconnected for the strip out/remediation works to proceed. J had subsequently reconnected partial power via the switchboard but could not reconnect the entire house. This is because the walls would have been stripped out and it was not safe to reconnect it. J confirmed the power from the switchboard should be enough for further mould remediation to be attended to. He advised the make safe to the join across the bridge was a temporary fix only and requires replacement as initially advised: We found that the mains had been damaged inside the conduit and required repair. We managed to repair the cable using inline crimps. However, we recommend the cable to be replaced going across the bridge for long-term safety and efficiency. Given the above and safety concerns, it is fair the insurer made necessary steps to ensure it was safe to reinstate electricity at the property. The delays in reinstating electricity at the property was contributed to by electrical works the complainant was responsible for fixing. The insurer’s offer of $1,500 for the loss of electricity and costs of moving and storing boxes is fair in all the circumstances. The insurer has not clearly explained why XC did not reattend the property to complete the makesafe works it commenced. The exchanged information shows once the insurer appointed the loss adjuster (C) to manage the claim, WM was appointed to identify the cause of the loss. While the insurer did not formally decline the claim until July 2024, the complainant was aware of WM’s findings in April 2024-May 2024 and that the insurer may partially decline the claim By the end of May 2024, the insurer indicated it would postpone its partial claim denial until the complainant’s submission and queries about WM’s findings were appropriately addressed. I have reviewed the parties’ submissions regarding damage caused as part of makesafe works. I am satisfied XC striping the skirting boards and making holes in the cabinetry was appropriate given the circumstances. The complainant was reasonably aware she had no flood cover under the policy and the insurer’s intention to partially deny the claim. The insurer however could have clearly and proactively communicated with the complainant about any remaining makesafe works and what the complainant should do about the damaged contents. This has been further considered under the award of non-financial loss compensation. 2.2 Is the insurer required to increase the compensation offer? Yes. The insurer had no control over certain aspects of the claim, including expert attendance and reporting. However, the insurer’s overall claim handling, including communication and delays, caused significant stress, inconvenience and frustration to the complainant. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: · physical inconvenience · time taken to resolve the situation · interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Insurer should increase the compensation offer The complainant says the insurer’s claim handling, including delays, caused significant mental health trauma to her and her family following what was already a catastrophic event. She has been living in temporary accommodation since January with four small children and was desperate for resolution so that they could start rebuilding their lives. The insurer acknowledged the handling of the claim and offered $1,000 compensation in August 2024 on an ex-gratia basis. The insurer says the timeline shows that many of the delays that occurred over the life of the claim were outside of its control. Other delays were a direct result of the claims complexity and/or a result of obtaining further information to address the complainant’s concerns. The insurer however did acknowledge and apologise for delays and issues that occurred during the management of the claim. The complainant says the insurer’s trades were meant to return to strip out more carpet but did not do so. The report from the hygienist says that the reason for this is because furniture was present that had to be removed first before further stripping could be done. This issue was never communicated to the complainant in a timely manner. Given the saturated carpets were causing further damage to the building the complainant says she removed the remaining carpets with the assistance of her family. The complainant also says that when she contacted the hygienist, the hygienist apparently had lost their initial report and did not know they were meant to reattend the property. The insurer has not explained if it managed this part of the process fairly. I acknowledge the claim duration during catastrophic events are longer when compared to other standard claims. However, the claim notes show the insurer did not appoint a loss assessor to manage the claim until 26 February 2024. I accept the insurer had no control of the duration for expert attendance and reporting. It also referred the concerns raised by the complainant with the experts before indicating the claim may be one for partial denial. However, upon reviewing the insurer’s claim handling, I am satisfied the insurer’s communication of what the complainant’s responsibilities were while it investigated the claim could have been better. The insurer could have asked the complainant to manage the damaged contents and building in a manner that best suited her needs and that it would accept liability if its claim decision changed based on her additional information. The exchanged information including the claim notes show the complainant contacted the insurer on several occasions for an update on the claim and about reconnecting power to her home. The correspondence between the insurer, C, XC, AC and J could have been better. There was some confusion at times on the extent of makesafe works completed, actions taken around electrical works and the property’s condition. It is fair the insurer reimbursed boarding expenses of $500 per week as the complainant moved into her father’s residence after the claimed event. This offer was extended to the period until the repairs were completed. Given the above, and also having regard to the impact one suffers from the natural disaster event, I am satisfied the insurer’s overall claim handling, including its communication and delays, caused significant stress, inconvenience and frustration to the complainant. It should therefore increase its compensation offer of $1,000 to $4,000. The insurer should pay an additional $3,000 non-financial loss compensation to the complainant. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.