Insurer declined claim for rain damage to retaining wall relying on policy exclusions
Text of the determination
Determination
|
Case number
|
12-24-154157
|
Financial firm
|
Defence Service Homes Insurance Scheme
Case number: 12-24-154157 20 June 2025
1 Determination overview
1.1 Complaint
The complainant held a home and contents policy with the financial firm (insurer) in New South Wales. The policy had initially been incepted on 26 October 1998. The policy was renewed for the period from 26 October 2023 to 26 October 2024. The buildings were insured for $992,000 (with an excess of $100 for accidental damage).
The complainant lodged a claim on 7 April 2024 for rain damage to the property’s retaining wall.
The complainant has established (and the insurer has acknowledged) a valid claim for damage to the retaining wall.
The insurer sought to decline the claim based on policy exclusions. The complainant disputed the insurer’s denial and sought non-financial loss compensation in relation to the insurer’s claim handling.
1.2 Issues and key findings
Did the insurer correctly assess the claim?
No. The complainant has established (and the insurer has acknowledged) a valid claim for damage to the retaining wall. The insurer was not entitled to decline the claim based on the exclusions.
Is the complainant entitled to non-financial loss compensation?
Yes. The complainant is entitled to compensation for non-financial loss.
Why is the outcome fair?
The outcome is fair because the resolution of the claim should be determined based upon the exchanged material and the terms and conditions of the policy. An award of non-financial loss is also fair in the circumstances.
1.3 Determination
The Determination is in favour of the complainant. Within 28 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall:
· provide the names of three independent builders (with expertise in the repair and installation of retaining walls) to the complainant
· within 7 days of the provision of the names of the three independent builders, the complainant is to choose one builder and communicate his selection to the insurer in writing
· within 14 days of receiving notice of the builder selected by the complainant, the insurer is to make suitable arrangements for the appointment of the builder to complete the repair and replacement of the retaining wall at the property at the insurer’s cost and to engage both a surveyor and an engineer to work with the builder regarding the replacement retaining wall
· pay to the complainant $3,000 for non-financial loss compensation
2 Reasons for determination
2.1 Did the insurer correctly assess the claim?
No. The complainant has established (and the insurer has acknowledged) a valid claim for damage to the retaining wall. The insurer was not entitled to decline the claim based on the exclusions.
Coverage of the policy
The complainant’s policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and the Renewal Notice (together referred to as the policy).
I am satisfied that the PDS and the Renewal Notice have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainant.
Complainant has the initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a valid (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Proximate cause
When establishing the cause of the damage to the complainant’s property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss.
If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause.
Policy covered insured events subject to exclusions
The policy provided cover (in Part 1) for loss or damage caused by the following events:
· flood
· storm
· rain (where the policy stated that ‘Rain includes that part of rainfall that is not absorbed by the soil but runs off as surface water’).
The policy also included cover (in Part 2) for ‘accidental loss or damage’ up to $5,000 (page 25).
The policy contained (in Part 7) general exclusions (page 32):
We do not insure you for loss or damage or legal liability caused by:
• failing to keep the home or site in good repair and condition
• the home or site settling or shrinking or expanding
• hydrostatic pressure, or the earth moving (other than from earthquake), erosion
• defects in structure, design, work done, or materials used on the home or at the site
• wear and tear
• rust, corrosion, rot, mildew, seepage, rising damp, any gradual deterioration or process
• atmospheric or climatic conditions (other than those we say we will insure in the events section), condensation, evaporation
Complainant made a valid claim on 7 April 2024
The complainant was a 73 year old war veteran and, together with his wife, had held a home insurance policy with the insurer since 1998. The complainant made a claim for damage caused by rain to his retaining wall on 7 April 2024.
It was not disputed that the Bureau of Meteorology data showed that there was total rainfall in the area of 251.2 mm and of high rainfall dates on 5 April 2024 (35.4 mm) and again on 6 April 2024 (194.8 mm) (as recorded at the B [suburb] AWS (Automatic Weather Station) weather station which was located approximately 5.9 kilometres from the complainant’s property).
The complainant made a claim on 7 April 2024 and said that it was ‘like a river flowing through the street’. The complainant sought the insurer to comply with its obligations regarding damage to the retaining wall. On 29 August 2024 the complainant said, in response to the insurer’s denial of the claim:
The [insurer failed] to consider the sheer volume of water and the speed in which it travelled during the event. While [the complainant could not] obtain an hourly breakdown of rainfall, it is known fact that the majority of the 245mm noted for 6 April 2024 rushed down the street within an hour and not throughout the day as the reports seem to portray i.e. fast paced flow, not a staggered flow. [The complainant believed] this is the absolute key point when assessing the matter, the volume of water [the complainant’s property] received in that hour was the reason why the wall gave out, not the issues seemingly identified weeks after the event.
The complainant also provided a statement from his neighbour dated 12 October 2024 whose property adjoined (at the rear) the complainant’s property:
On many occasions [the complainant’s neighbour] traverse[d] [the complainant’s] property as a short cut to the shops etc. [The complainant’s neighbour could] verify visually that the wall in question of the insurance claim was STRAIGHT and showed no wear & tear from the time it was constructed. On the morning of the incident (6/4/24) our properties were inundated with unbelievable water from the streets and both our homes were affected.
On 19 July 2024 the insurer denied the claim and on 18 September 2024 and 1 November 2024 the insurer maintained its denial.
On 1 November 2024 the insurer acknowledged that the complainant had established a prima facie valid claim. However, the insurer said it was able to rely upon exclusions under the policy.
Insurer assessed the claim and denied it based on exclusions
The insurer engaged A, a loss adjuster, who prepared a report dated 10 April 2024 (based on an inspection on 7 April 2024). A concluded:
· ‘the property and gardens [were] very well maintained’
· the complainant and the complainant’s neighbours ‘had tirelessly cleared all evidence of water flow debris and witness lines from the property without thinking to take an (sic, any) pictures’
· the complainant ‘believed the water reached approximately 500-600mm in height to the neighbour’s garage, before travelling over the stepped retaining wall, seeping through into the lounge room beyond’
· the ‘exterior left hand side brick built retaining wall has collapsed exposing the earth beneath the paved driveway. There is some erosion to the exposed earth and the [complainant reported] the driveway paving has since started to crack through the middle’
· the probable cause was ‘the Bureau of Meteorology record rainfall of 194.8mm on 6 April 2024 with east south easterly wind gusts of 70 KMH’
· the appointment of a building consultant was recommended to confirm A’s site observations and to provide a report regarding the insurer’s liability for the claim
The insurer engaged T, to prepare a ‘Building Report’ dated 18 April 2024 (based on an inspection on 16 April 2024). T concluded
· ‘the wall in question prior to the event was showing signs of failure however still functional. It is apparent the storm water runoff being captured by the raised retaining wall has failed under the load of the flowing water leading to its collapse’
· the ‘storm water runoff has caused the wall to fail however the wall in questions (sic, question) appeared to be failing prior to the storm event.’
The conclusion reached by T was that, prior to the event, the wall ‘was showing signs of failure however still functional’ and that ‘the storm water runoff being captured by the raised retaining wall has failed under the load of the flowing water leading to its collapse’. In practical terms, T’s conclusion was that the proximate cause of the damage to the functional retaining wall was that it failed under the load of the storm water. T’s report did not, and does not, support a conclusion that the proximate cause of the damage to the ‘still functional’ retaining wall was other than from the storm water runoff.
The insurer engaged S, building consultant and engineers, to prepare a report dated 25 June 2024 (S’s First Report). In S’s First Report, S stated:
‘.. the following are the underlying contributing factors to the retaining wall collapse and the cracking of the driveway:
a) Insufficient size of the retaining wall to act as a gravity system to withstand the typical applied loading.
b) Omission of sufficient subsoil drainage at the base of the wall which has allowed build-up of hydrostatic pressure behind the subject retaining wall.
c) Long-term deterioration and displacement of the retaining wall which has ultimately compromised the structural integrity and stability of the retaining wall system.
d) The mature jacaranda tree and its rooting system applying load to the concrete driveway and retaining wall.
From the retaining wall design point of view, the subject “gravity” retaining wall is grossly inadequate to withstand the applied loading from active soil pressure, hydrostatic, and surcharge pressure within the subsoil.
To this end, in our opinion, the proximate cause of the retaining wall failure is due to on-going failure as a result of inherent construction issues, long-term and age-related deterioration of the retaining wall. We are of the opinion the claimed event has exacerbated the already failing retaining wall.
Furthermore, in our opinion, the hairline cracking within the concrete stamped driveway is a result of long-term and age-related deterioration along with the rooting system of the mature jacaranda which is within the zone of influence.’
On 19 July 2024 the insurer declined the claim based on exclusions and the reports from T and S.
Insurer has not established the exclusion for defective structure, design, work done or materials used
The first cause, in S’s opinion in S’s First Report, was ‘inherent construction issues’.
The conclusions reached by S in S’s First Report (in S’s paragraphs a) and b) above) referred to the sufficiency of the size of the retaining wall and subsoil at its base. The report emphasised that from the ‘retaining wall design point of view’, the retaining wall was inadequate and that the ‘proximate cause of the retaining wall failure [was] due to on-going failure as a result of inherent construction issues [and other issues]’.
The Australian Financial Complaints Authority (AFCA) approach to the interpretation of such an exclusion in those circumstances has consistently been that:
· ‘The [AFCA] panel does not accept a policy exclusion regarding defects or faulty workmanship can apply based on standards that were not applicable at the time of construction.’ (a Determination by an AFCA Panel (919411)); and
· ‘To show the tiling is defective by way of design or workmanship [in a Determination which also involved a consideration of the relevant Standards from the 1990s which required expansion or control joints to be installed in tiled flooring], the insurer would need to show its construction did not comply with the relevant building code. The insurer has not done so’ (914155).
In accordance with the AFCA approach, it was not fair and appropriate for the insurer to deny the claim based on the defects exclusion. The opinion in S’s First Report was based on what S described as ‘general engineering principles’. In S’s First Report, S estimated the property to have been built in early 1980 and acknowledged that none of the building codes it referred to in its report were applicable at the time of construction.
Importantly, S stated that ‘the subject building construction predate[d] the relevant codes at the time of construction and it [was S’s] opinion, that the construction was built to the common practices at the time’. S stated that ‘the references made within body of [S’s] report to current NCC Building Code of Australia (BCA) and relevant Australian Standards, [had] only been made to highlight the current construction deficiencies and explain the mechanism and cause of damage and [was] not a qualification to condemn the construction being defective at the time of construction.’
Accordingly, there was no dispute that at the time of the retaining wall’s installation, the construction was not defective.
However, eight months’ later, the insurer engaged S to prepare a Supplementary Report dated 24 February 2025 (S’s Supplementary Report). In S’s Supplementary Report, S stated:
· it ‘consider[ed] that The British Civil Engineering Code of Practice No. 2 (1951) – Earth Retaining Structures (referred hereafter as CP2-1951) would have been the referenced standard for the construction of retaining walls prior to the inception of AS 4678 and BCA 1988.’
However, S’s position in its Supplementary Report contradicted S’s First Report. S provided no basis for the change in its opinion. Further, S provided no basis for S’s opinion that a ‘British Civil Engineering Code of Practice No. 2 (1951)’ had been adopted in Australia at any stage. Indeed, S acknowledged that the construction of the retaining wall predated the ‘earliest relevant Australian Standards (AS 4678:2002 – Earth-retaining structures) and the Building Code of Australia (BCA 1988)’ – i.e. the Australian standards which were not introduced until after the installation of the retaining wall.
S again ‘reiterated’ that the ‘retaining wall structure [was] inherently inadequate in design and construction’. In support of its conclusion, S referred to AS 4678-2002 which was not, being and Australian Standard which was dated 2002, adopted in Australia at the time of the construction of the retaining wall.
S again reiterated that the retaining wall was not constructed in accordance with ‘engineering principles’ at the time (relying again on CP2-1951) in relation to the adequacy of the drainage system (such as coarse granular material wrapped in filter fabric with weepholes along the base).
Based on the information, S’s Supplementary Report did not establish that at the time of the installation of the retaining wall, which was built in Australia, the construction was defective. Rather, as referred to in S’s First Report, the construction was built to the common practices at the time.
Accordingly, the insurer has not established the exclusion for defective structure, design, work done or materials used and was not entitled to deny the claim on that basis.
Insurer has not established the exclusion for gradual deterioration
In its denial, the insurer referred to a Figure 3 ‘Subject retaining wall – Dated June 2022’ which the insurer said ‘in [its opinion] within the above historical imagery, it appears the subject retaining wall has already begun to fall and or rotate’.
Based on the information, the insurer’s reliance on the Figure 3 and the conclusion drawn by the insurer (and its expert S) was not appropriate and should not be accepted:
· Figure 3 was a ‘Google’ photograph which was taken on an angle and lacked clarity due to shadowing. The ‘Google’ photograph was not taken for the purpose of establishing whether or not the retaining wall was straight at the time the photograph was taken (2002) or whether or not it was straight at or about the time of the rain event.
· Figure 3 did include details of both the complainant’s red waste bin and his green recycling bin which were both located on the upside perimeter of the retaining wall. The photographs showed both of the bins in a vertical position. Further, even were the Figure 3 to be relied upon (which it should not), it would be most unlikely for the complainant to have placed the bins in that position on the driveway and near the retaining wall in June 2022 (approximately two years prior to the storm event) if the wall had ‘already begun to fall and or rotate’
· an ‘Aerial Site Plan of the Subject Property’ (Figure 1) (undated) was also included in S’s report and it showed the retaining wall in a straight line and no evidence that it had begun to fall and or rotate
· S’s conclusion in S’s First Report was tentative as S said that it ‘appears’ the wall had begun to fall or rotate
· S’s conclusion in S’s First Report was unsupported by any technical analysis which supported any finding that the wall had begun to fall or to rotate
Further, whilst the insurer’s neighbour also provided a statement that the retaining wall was straight, it has not been necessary to rely upon it to reach the conclusion that the insurer’s reliance on Figure 3 should not to be accepted.
A further conclusion reached by S in S’s First Report related to:
‘c) Long-term deterioration and displacement of the retaining wall which [had] ultimately compromised the structural integrity and stability of the retaining wall system’.
This conclusion was emphasised by S in S’s First Report that the proximate cause was ‘long-term and age-related deterioration of the retaining wall’. However, this conclusion was not supported by S in relation to the retaining wall. The only issue identified by S in S’s First Report ‘in the vicinity of the loss’ was set out in a table and S made clear that it was only ‘to the extent detailed’ in the table in S’s First Report as follows:
|
Item
|
Maintenance Issues
|
Impact on the loss (Y/N)?
|
How would the maintenance have prevented or mitigated the loss?
|
1.
|
Pre-existing cracking to the concrete driveway.
|
Y
|
The removal of the jacaranda tree prior to maturing.
Accordingly, the insurer has not established the exclusion for gradual deterioration and was not entitled to deny the claim on that basis.
Insurer has not established an exclusion regarding the Jacaranda tree
A further conclusion reached by S in S’s First Report related to:
‘d) The mature jacaranda tree and its rooting system applying load to the concrete driveway and retaining wall’.
In relation to the jacaranda tree, S did not conclude this was a cause of damage to the retaining wall. Based on the information, the jacaranda’s impact was, according to S, related to ‘the hairline cracking within the concrete stamped driveway [which was] a result of long-term and age-related deterioration along with the rooting system of the mature jacaranda which is within the zone of influence’. The complainant did not seek compensation for the cracking damage to the concrete driveway. Accordingly, it would not be fair to rely upon S’s First Report to find that the proximate cause of the damage to the retaining wall was due to the jacaranda tree.
In S’s Supplementary Report, S said that tree root growth from the jacaranda roots had contributed to destabilisation and rotation of the retaining wall. Whilst photographs showed roots in the location of the damaged exposed retaining wall, S’s Supplementary Report did not show how those roots caused the retaining wall to be damaged and to collapse. Further, there was a grass lawn near the complainant’s driveway and it was located between the driveway and the jacaranda tree. The insurer provided no information which showed that the roots were jacaranda tree roots rather than grass roots.
Based on the information, the insure has not established an exclusion regarding the jacaranda tree and was not entitled to deny the claim on that basis.
Insurer has not established the exclusion that the complainant failed to keep the home or site in good repair and condition
On 10 April 2024 the insurer’s loss adjuster, A, reported that the ‘property and gardens are very well maintained’.
None of the insurer’s experts (T or S) provided any opinion in support of the proximate cause of the damage to the retaining wall being caused by the complainant’s failure to keep the home or site in good repair or condition.
However, on 4 March 2025 the insurer provided a copy of S’s Supplementary Report. In its submission attaching S’s Supplementary Report, the insurer said ‘that the retaining wall, is aged over 40 years, has reached the end of its life as is proved by the pre-existing condition (deterioration). It’s (sic, its) failure during/following the weather event is purely coincidental and inevitable, as effective construction and/or the complainant addressing the visible condition (deterioration), would have seen the retaining wall withstand the event. The [insurer] would like to point out that the complainant remains responsible for maintenance and upkeep of the property for loss prevention and/or mitigation. The pre-existing condition and deterioration of the wall is clearly visible and should have been addressed by the complainant’.
The insurer’s position on 4 March 2025 that the complainant had failed to address the ‘visible condition (deterioration)’ of the wall (i.e. that the complainant failed to keep the home or site in good repair and condition) was unsupported by the insurer’s experts’ conclusions. These did not refer to, or rely upon, lack of maintenance as being the proximate cause of the damage to the retaining wall.
Accordingly, the insurer has not established the exclusion for failure to keep the home or site in good repair and condition and was not entitled to deny the claim on that basis.
For the reasons set out above, the insurer has not established that the proximate cause of the damage to the retaining wall was based upon an exclusion under the policy. For the avoidance of doubt, the insurer has also not established that the proximate cause of the damage to the retaining wall was based upon a combination, or any combination, of exclusions under the policy. Based on the information, the complainant has established that the proximate cause of the damage to the retaining wall was rain which, according to the policy, included that part of rainfall that is not absorbed by the soil but runs off as surface water.
Insurer should accept the claim and engage an independent builder
Accordingly, based on the information, the complainant has established that the proximate (i.e. the dominant or effective or operative) cause of the damage to the retaining wall was rain. The insurer has not established that the proximate cause of the damage was due to an exclusion under the policy. Accordingly, the insurer should have accepted the claim.
Based on the information, it is fair that the insurer engage an independent builder (with expertise in the repair and replacement of retaining walls) at it its cost to replace and repair the retaining wall. The complainant expressed concerns about the independence of S and has demonstrated that he has lost confidence in S.
In the circumstances it is fair and appropriate that the insurer provide to the complainant a list of 3 builders (with expertise in the repair and replacement of retaining walls) and that the complainant select one builder to be engaged by the insurer. In the circumstances, it would not be fair for S to be included on the list of 3 independent builders (S is known to both the complainant and the insurer but not named in this determination). By the insurer engaging an independent builder selected by the complainant, the complainant will have the benefit of the lifetime guarantee on the repair and replacement works to the retaining wall.
Insurer is also to engage a surveyor and engineer in relation to the replacement wall
Further, Section F of the policy (page 21) provided that ‘If [the insurer agreed] to pay [the complainant’s] claim for loss or damage to the home, [the insurer] will also pay the reasonable costs of: ‘employing an architect, engineer or surveyor’.
The retaining wall was located on the boundary of the complainant’s property. In the circumstances, it is fair and appropriate and in accordance with the policy that the insurer engage at its cost a surveyor to assist the builder and to ensure that the replacement retaining wall is installed at the proper location on the boundary of the complainant’s property.
Further, as referred to above, the insurer engaged an engineer, S, to prepare reports. In S’s report it did not provide a Scope of Works. However, S did recommend that ‘a new retaining wall [be] designed and constructed either using reinforced blockwork with a cantilevered concrete retaining wall base footing or a mass concrete gravity retaining system to sustain the imposed loads and satisfy the Engineering principles in accordance with the relevant Australian Standards.’ The complainant explained that he could not afford to engage an expert in relation to the claim. Accordingly, it is fair that the insurer engage at its cost an engineer to assist the builder and to ensure that the repair and replacement of the retaining wall is in accordance with relevant Australian Building Codes and Standards.
2.2 Is the complainant entitled to non-financial loss compensation?
Yes. The complainant is entitled to compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under AFCA’s Rules, it can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer is required to pay non-financial loss compensation
The complainant made the claim in April 2024. The insurer maintained its denial from 19 July 2024. Based on the information, the insurer was not entitled to deny the claim. The complainant repeatedly challenged the denial and the insurer’s reports upon which the denial was based. The complainant also repeatedly followed up the status of the claim and the reconsideration of its denial. The retaining wall was located at the front of the complainant’s home and supported the complainant’s driveway which provided access to the complainant’s carport. The complainant was suffering from a terminal medical condition and expressed anxiety and frustration at the insurer’s repeated denial and refusal to repair and replace the retaining wall.
The complainant explained that he could not afford to engage an expert engineer to prepare a report. The insurer engaged experts, including the preparation of S’s Supplementary Report some 8 months after S’s First Report. S’s Supplementary Report relied upon a British Engineering Code and provided no basis for its adoption in Australia and, rather, acknowledged that the construction of the retaining wall predated the ‘earliest relevant Australian Standards (AS 4678:2002 – Earth-retaining structures) and the Building Code of Australia (BCA 1988). Based on the information the insurer’s poor claims handling caused an unusual degree of stress, delay, or inconvenience to the complainant and it is fair for there to be an award of non-financial loss compensation in the amount of $3,000.
2.3 Why is the outcome fair?
The outcome is fair because the resolution of the claim should be determined based upon the exchanged material and the terms and conditions of the policy. An award of non-financial loss is also fair in the circumstances.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.