Home / Open Corp Funds Management Ltd / Determination 12-24-153469

Determination 12-24-153469

Alleged inadequate disclosure of illiquidity and refusal of redemption request

FirmOpen Corp Funds Management Ltd
Decided2025-04-15
ProductInvestments · SMSF advice
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$26,400
SourceAFCA PDF

Summary

SMSF directors complained the responsible entity of a property fund did not disclose the lack of withdrawal rights and refused their redemption request. AFCA found in favour of the firm, adopting the recommendation that disclosure was adequate.

The PDS and constitution clearly and repeatedly disclosed the project was illiquid with no withdrawal facility, so the firm was not obliged to redeem units or find a buyer.

Issues

Subjects and remedies

smsfno remedy

Related

All Open Corp Funds Management Ltd determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-153469 | Financial firm | Open Corporation Funds Management Ltd Case number: 12-24-153469 15 April 2025 Determination overview Complaint This complaint is brought by Mr and Mrs K as directors of the corporate trustee of their self-managed superannuation fund (SMSF). The complainants submitted the financial firm, who was the responsible entity of the property fund that their SMSF invested in 2017, failed to: make proper disclosure about the unavailability of withdrawal rights and redemption facility for their investment approve their redemption request. The financial firm submitted its disclosure about the unavailability of withdrawal rights and redemption facility was adequate and it was not required to approve the complainants’ redemption request. Issues and key findings Were the findings in the recommendation correct? The findings in the recommendation were correct and are adopted in this determination. Why is the outcome fair? While I acknowledge the disappointment suffered by the complainants due to the poor outcome of their investment, the financial firm properly discharged its obligation to disclose the risks associated with the investment including that withdrawal rights and redemption facility were not available. Accordingly, it is fair in the circumstances that the financial firm should not be held responsible for any loss suffered by the complainants. Determination This determination is in favour of the financial firm. I agree with the case manager’s reasons for the recommendation and the recommended outcome. Reasons for determination Were the findings in the recommendation correct? The recommendation considered relevant issues and made accurate findings I am satisfied that the case manager’s recommendation contains an accurate summary of the complaint, the issues to be determined, the relevant law and the relevant ASIC Regulatory Guides. The findings in the recommendation are correct and are adopted in this determination. The recommendation made key findings The recommendation correctly identified the primary issue in dispute was whether the financial firm was entitled to refuse the complainants’ redemption request to withdraw their investment. After identifying the issue, the recommendation made the following findings: the financial firm properly disclosed the nature of the investment as illiquid and that it had no redemption or withdrawal facility the financial firm was not required to provide any alternative exit strategy. Firstly, as for whether the financial firm appropriately disclosed the illiquid nature of the investment and the absence of withdrawal rights and redemption facility, the recommendation referred to multiple statements contained in the fund’s PDS that explicitly stated investors had no withdrawal rights. The PDS made at least eight separate references to the above. The recommendation set out each of those references. Some of these statements also included a representation that the financial firm had no obligation to repurchase or redeem the units in the fund. Second, as for whether the financial firm was required to provide an alternate exit strategy, the recommendation clearly set out why the financial had no such obligation. The complainants submitted the financial firm had applied inconsistent withdrawal treatments as they were able to fully redeem the units they held in another fund that they also invested with the financial firm. The recommendation correctly stated each fund was governed by its own PDS and therefore a fair comparison could not be made between the two funds. It also repeated the representations contained in the PDS that the financial firm did not have any obligation to redeem or repurchase the complainants’ units. Lastly, the recommendation summarised the reasons for finding in favour of the financial firm, namely that: - the financial firm disclosed the project was illiquid and has no withdrawal facility in the PDS and constitution - the key information disclosed in the PDS was clear, concise and in plain language - [the financial firm’s other fund that the complainants also invested in]’s withdrawal offer was due to the project being wound up and the portfolios sold down which was governed by its terms and conditions in the PDS and trust deed - the financial firm was entitled to deny the complainants’ redemption request and was not obliged to repurchase their project units nor did it have to find a buyer to buy out their holdings, in accordance with the project’s PDS and constitution. The complainants rejected the recommendation The financial firm accepted the recommendation. The complainants rejected the recommendation. They did not provide any further submission in support of their rejection. The determination adopts the findings and the outcome of the recommendation I have reviewed the complaint file in its entirety including the various submissions made by the parties. Having conducted the review, I am satisfied the recommendation contains an accurate summary of the complaint, the issues to be determined, the relevant law and the relevant ASIC Regulatory Guides. The findings in the recommendation are correct and are adopted in this determination. Why is the outcome fair? The outcome is fair and reasonable While I acknowledge the disappointment suffered by the complainants because of the poor outcome of their investment, the financial firm properly discharged its obligation to disclose the risks associated with the investment including that withdrawal rights and redemption facility were not available. Accordingly, it is fair in the circumstances that the financial firm should not be held responsible for any loss suffered by the complainants. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted our determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Recommendation | Case number | 12-24-153469 | Financial firm | Open Corporation Funds Management Ltd Case number: 12-24-153469 6 March 2025 Recommendation overview Complaint The complaint has been brought by Mr and Mrs K (the complainants), directors of the corporate trustee for the Self-Managed Superannuation Fund (the SMSF). The financial firm is the responsible entity (RE) for the managed fund investment. The complainants say: the SMSF invested $26,400 in the OA Fund – PC Project Units (the project) in September 2017 they were not aware that the project was illiquid until the financial firm denied their withdrawal request in December 2023 the financial firm failed to find a replacement investor to buy out their holdings. The complainants are seeking for the financial firm to process their withdrawal request. The financial firm says the project was illiquid and did not offer any redemption or withdrawal facility. It says as the project is not listed on ASX, there is no secondary market to buy out the SMSF holdings. Issues and key findings Was the financial firm entitled to deny the complainant’s redemption request? Yes. The disclosure documents disclosed the project was illiquid and did not offer investors any redemption or withdrawal facility. The financial firm is under no obligation to provide an alternative exit strategy to the complainants. Why is the outcome fair? The outcome is fair in all the circumstances because the financial firm met its obligation by disclosing clearly in the PDS that the project was an illiquid fund and has no withdrawal facility. It is also the RE’s responsibility to ensure if a withdrawal offer is made, it needs to treat all unitholders equally. The financial firm is under no obligation to repurchase the complainants’ holdings or assist them in finding a buyer to buy out their holdings. Recommendation This recommendation is in favour of the financial firm. No compensation is payable. Reasons for recommendation Was the financial firm entitled to deny the complainant’s redemption request? Yes. The disclosure documents disclosed the project was illiquid and did not offer investors any redemption or withdrawal facility. The financial firm is under no obligation to provide an alternative exit strategy to the complainants. The complainants invested with the financial firm since 2017 The complainants say the SMSF invested in three different projects with the financial firm since 2017. Two of the projects have completed within the proposed completion timeframe and those investments were redeemed. Details of the investments are as follows: | OA fund investment | Start date | Initial investment amount | Redeemed date | Redeemed amount | PC project (the project) | 20 September 2017 | $26,400.00 | N/A | N/A | I Loan project | 4 June 2018 | $36,500.00 | 14 June 2022 | $36,500.00 | Rfund | 1 July 2019 | $8,000.00 | 31 July 2024 | $11,579.50 On page 69 of the project’s Product Disclosure Statement (PDS) - Part B dated 30 August 2017, the complainants were required to declare that by completing the application form, they accepted and agreed to be bound by all the terms and conditions of the offer as set out in the PDS, and the terms and conditions of the constitution as amended. As such, the terms and conditions set out the contractual obligations of the financial firm and the complainants. ASIC places disclosure obligations on the financial firm The Regulatory Guides were issued by Australian Securities and Investments Commission (ASIC) representing good industry practice to assist the members of the financial services industry in understanding their obligations. Regulatory Guide 234 Advertising financial products and services (including credit) (RG234), applies to any communication whose purpose is to inform consumers about or promote financial products and services. However, it does not include statements in a regulated disclosure document, such as a prospectus, Product Disclosure Statement (PDS) or Financial Services Guide (FSG) (RG234.10). Regulatory Guide 168 Disclosure: Product Disclosure Statements (and other disclosure obligations) (RG168) states the information in a PDS ‘must be worded and presented in a clear, concise and effective manner’ (RG168.76) and key information about the financial product should be in summary at the front of the PDS (RG168.97(f)). According to Regulatory Guide 46 Unlisted property schemes: Improving disclosure for retail investors (RG46), a Responsible Entity (RE) of an unlisted property scheme is required to disclose six benchmarks and eight disclosure principles in a PDS in a clear, concise and effective manner (RG46.124 to RG46.126). A PDS will generally be considered clear, concise and effective if it highlights key information, uses plain language, is as short as possible, explains complex information, including any technical terms and is logically ordered and easy to navigate (RG46.128). The financial firm disclosed the project was an illiquid fund and had no withdrawal facility The complainants say they found out the project was illiquid and has no formal redemption or withdrawal facility when they submitted a withdrawal request in December 2023. They say the financial firm breached ASIC’s Regulatory Guide (RG) RG168 by failing to clearly disclose risks including liquidity constraints and RG 234 by failing to highlight the liquidity risks. The financial firm says the PDS and the fund constitution disclosed the project was an illiquid fund and has no withdrawal facilities in accordance with ASIC’s disclosure benchmarks and principles requirements. The financial firm also says according to section 601KA of the Corporations Act (the Act) ‘Members Right to Withdraw’, item (3) states the responsible entity (RE) must not allow a member to withdraw from the scheme: If the scheme is liquid – otherwise than in accordance with the scheme’s constitution; or If the scheme is not liquid – otherwise than in accordance with the scheme’s constitution and sections 601KB and 601KE. Sections 601KB to 601KE of the Act allow for the RE to make withdrawal offers when assets are available and able to be converted to money in time to satisfy the withdrawals. In the PDS, the financial firm disclosed the project was an illiquid fund, had no withdrawal facility and could not repurchase the project units, in summary as follows (Please refer to Section 3.2 for details): Part A of the PDS Page 8 Project Units - Withdrawal Rights – the project was regarded as illiquid and investors have no withdrawal rights and the RE has no obligation to repurchase or redeem project units. The project did not have a secondary market that can be traded Page 10 Withdrawal rights (Principle only) – no withdrawal rights for a project class Page 15 No Withdrawal Rights for Project Units – the financial firm do not intend to make withdrawal offers in respect of a project, unitholders are able to transfer their project units subject to approval but are not entitled to require the financial firm redeem or repurchase their project units Page 22 The project units offered are likely to be illiquid investments as there may not be a secondary market and there is no obligation on the financial firm to purchase or redeem project units Page 34 (4) projects units cannot be redeemed unless the RE in its absolute discretion notifies the unitholders in writing that they may redeem their units Part B of the PDS Page 15 ASIC – RG46 Disclosure Benchmarks and Principles, withdrawal rights (Principle only) – there were no withdrawal rights for the project and investment in the project is to be considered illiquid Page 20 Can you withdraw your investment or transfer your project units? – You will not have any right to withdraw your money from the project and it will not have any illiquid assets that could be used to fund for a withdrawal offer. The financial firm do not intend to list the project or the interposed entities on the ASX or any other secondary exchange Page 46 Financial Risks (3) The project units will not be listed on the ASX, therefore an established secondary market will not exist. No redemption or withdrawal facility is offered. An investment in the project should be considered medium term and illiquid. Based on the available information, the financial firm disclosed the project was an illiquid fund and there was no withdrawal facility. The key information was disclosed from page 8 of the PDS onwards and was clear, concise and in plain language. As such, I am satisfied that the financial firm met its disclosure obligations. The financial firm was not obliged to provide alternative exit strategy to the complainants The complainants say the financial firm provided inconsistent withdrawal treatment to investors as they received a full redemption offer for Rfund in July 2024. They say the financial firm failed to provide any alternative exit strategy or facilitate a buyout for the project. The financial firm says its PDS and constitution states the project could not be traded on a secondary market and it has no obligation to repurchase or redeem the project units from the complainants. As mentioned above, both Part A and B of the PDS disclosed in various sections that the financial firm was not entitled to redeem or repurchase the project units from the complainants. Clause 15.1(b) of the constitution also states the RE may however, in its sole and absolute discretion, redeem or repurchase some or all of the units that are subject to the repurchase request from a unitholder by using the liquid assets attributable to that Class. Clause 15.6(a) and (b) states when a scheme is not liquid, a unitholder may only withdraw from a scheme in accordance with a current withdrawal offer made by the RE which is in the interests of the unitholders as a whole (Please refer to Section 3.3 for details). According to Rfund ‘FAQ on Unit Redemption and Withdrawal Offers’, the withdrawal offer was due to the RE selling down the portfolio and winding up the fund, at which point, all investors were eligible for a full redemption. I am of the view that it is unfair to compare Rfund’s withdrawal offer with the project as their terms were governed by a different PDS and trust deed. Based on the available information, I am satisfied that the financial firm was not obliged to redeem or repurchase the project units from the complainants. The PDS disclosed clearly that the project was illiquid and cannot be traded on a secondary market. As such, the financial firm was unable to assist the complainants to find a buyer to buyout their holdings. The financial firm acted in accordance with its PDS and constitution Having considered the above, I am satisfied that: the financial firm disclosed the project was illiquid and has no withdrawal facility in the PDS and constitution the key information disclosed in the PDS was clear, concise and in plain language Rfund‘s withdrawal offer was due to the project being wound up and the portfolios sold down which was governed by its terms and conditions in the PDS and trust deed the financial firm was entitled to deny the complainants’ redemption request and was not obliged to repurchase their project units nor did it have to find a buyer to buy out their holdings, in accordance with the project’s PDS and constitution. Why is the outcome fair? The outcome is fair in all the circumstances because the financial firm met its obligation by disclosing clearly in the PDS that the project was an illiquid fund and has no withdrawal facility. It is also the RE’s responsibility to ensure if a withdrawal offer is made, it needs to treat all unitholders equally. The financial firm is under no obligation to repurchase the complainants’ holdings or assist them in finding a buyer to buy out their holdings. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has assessed this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this recommendation to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. O Fund – PC Project Units - Product Disclosure Statement Part A Page 8 Project Units – Withdrawal Rights Unless otherwise specified in the relevant project Part B PDS, a project is regarded as illiquid and project investors have no withdrawal rights and the responsible entity has no obligation to repurchase or redeem project units. Although project unitholders have the right to sell their project units to a third party, there is no organised secondary market on which the project units may be traded and any sale is subject to approval by the responsible entity. The units will not be listed on any securities exchange. Page 10 Withdrawal rights (Principle only) Principle – ‘Investors should understand whether they can withdraw their investment’. The disclosure in this Part A PDS and in the relevant Part B PDS helps investors understand how and when investors may be able to exit their investment in the Cash Class or a Project Class. Generally, you will have ongoing withdrawal rights on a monthly basis in relation to the Cash Class, but no withdrawal rights in respect of a Project Class. Page 15 No Withdrawal Rights for Project Units We do not intend to make withdrawal offers in respect of a Project. Project unitholders are able to transfer their Project units, subject to our approval, but are not entitled to require that we redeem or repurchase their project units. Page 22 General and Economic Risks The investment in project units under a Part B PDS should be considered as medium term. The project units under a Part B PDS are likely to be illiquid investments as there may not be a secondary market. There is no obligation on us to purchase or redeem project units or the underlying property assets Potential consequences Due to the illiquid nature of the investment in project units you may not be able to exit the fund Page 34 4. Redemption Project units cannot be redeemed unless the responsibility entity in its absolute discretion notifies the unitholders in writing that they may redeem their units. Cash units can be redeemed on a monthly basis….. Part B PDS Section 8 ASIC – RG46 Disclosure Benchmarks and Principles Page 15 Withdrawal rights (Principle only) Disclosure Principle – ‘Investors should understand whether they can withdraw their investment’. You will have no withdrawal rights in relation to your project units. Investment in the project is to be considered an illiquid investment and there is no withdrawal or redemption facility offered for your project units. It is intended that project unitholders will receive capital and profit returns at the end of the project when the Wholesale fund, the interposed entities and ultimately the project are, in that order, wound up. Page 20 Can you withdraw your investment or transfer your project units? You will not have any right to withdraw your money from the project. The project will own units in the Wholesale fund which will develop the property and as such it will not have any liquid assets that could be used to fund a withdrawal offer. We do not intend to list the project units or the interposed entities on the ASX or any other secondary exchange. You should consider your investment illiquid and be prepared to hold your investment for the term of the project…… Section 19 Risks Page 46 Financial risk 3. The project units will not be listed on the ASX, therefore an established secondary market will not exist. No redemption or withdrawal facility is offered. An investment in the project should be considered medium term and illiquid. Fund Constitution 1.4 Constitution Legally Binding (section 601GB) (a) The responsible Entity is bound by, and must act to give effect to, this Constitution as it applies to the Scheme for which it is the trustee. (b) The execution of an Application constitutes the consent of the Applicant to be bound by the terms of this Constitution 15.3 Repurchase of Project Units (c) While the Scheme is not Liquid: (1) if the Assets attributable to the project class comprise at least 80% in value of Liquid Assets, the Responsible Entity may give effect to that request at the time and in the manner set out in clause 15.5, provided that the Responsible Entity is satisfied that doing so: (A) treats the unitholders of the project class equally and unitholders of each class fairly; and (B) is in the best interests of unitholders of the Scheme generally; or (2) if the Assets attributable to the project class do not comprise at least 80% in value of Liquid Assets, the Responsible Entity need only give effect to that request if made under a Withdrawal Offer in the circumstances set out in clause 15.6. 15.6 When the Scheme (or Class) is Not Liquid – Withdrawal Offers Subject to compliance with Part 5C.6 of the Corporations Act, where this clause 15.6 applies by operation of clauses 15.2 or 15.3: A Unitholder may only withdraw, wholly or partly from the Scheme or particular Clas in accordance with a current Withdrawal Offer that may be made by the Responsible Entity in its discretion relating to the Scheme or Class and the procedures as contained in this clause. (b) A Withdrawal Offer may only be made by the Responsible Entity provided that the Responsible Entity is satisfied that the making of a Withdrawal Offer is or will be in the interests of the Unitholders as a whole.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.