Home / Westpac / Determination 12-24-150679

Determination 12-24-150679

Bank released progress payments to a builder without adequate checks on insurance certificates and red flags; builder had lost its licence

FirmWestpac
Decided2026-02-04
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded$259,182
Non-financial loss—
Amount claimed$518,197
SourceAFCA PDF

Summary

Complainants' builder had lost its licence and was uninsured; they sought reset of two progress payments totalling about $518,197 after the bank released funds despite repeated non-compliant insurance certificates. AFCA found the bank partly at fault, with the complainants contributing, and ordered a $259,182 loan reduction plus interest refund.

The bank breached its duty of due care and skill (s12ED ASIC Act) by ignoring red flags before releasing payments, but the complainants failed to verify the builder, so liability is shared equally.

Issues

Subjects and remedies

home or building damagedebt waiver or reductionloan or hardship variationpay interest

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-150679 | Financial firm | St George Bank Case number: 12-24-150679 5 January 2026 1 Determination overview 1.1 Complaint The complainants, Mr W and Mrs W, were customers of the financial firm (the bank) with a pre-existing home loan over their principal place of residence (the property). In 2023, the complainants decided to renovate the property. On 8 May 2023, they entered into a contract with builders, Company H (the build contract), to perform the works for a set price of $863,940 (incl. GST). On 22 May 2023, the complainants applied for a home construction loan of $691,000 (the loan) from the bank. The loan was approved on the following day and was secured by a mortgage over the property. It was settled on 1 September 2023, and the loan proceeds were used to pay three of the six progress payments specified by the build contract on 1 September 2023, 11 October 2023 and 5 February 2024. Unfortunately, a dispute arose between the complainants and Company H and, in June 2024, the complainants discovered it had lost its building license in December 2022 and was therefore uninsured. The complainants terminated the build contract, and the construction was not completed. In summary, the complainants relevantly say the bank: · had a contractual obligation to satisfy itself the builder was appropriately licenced · had an obligation to actively verify the builder’s status and entitlement to progress payments prior to releasing funds and · failed to meet both sets of obligations. The bank says it was under no obligation to verify the builder was appropriately licensed and this was the complainants’ responsibility. It further says the progress payments were appropriately processed. 1.2 Issues and key findings Was the bank required to verify the builder’s licence? No. The bank’s reliance on the information provided by the borrowers and builder, in circumstances where the complainants had the obligation to verify their builder was appropriately licenced, was reasonable in the circumstances. Did the bank properly process the progress payments? No. The bank attempted to obtain the insurance documentation it required for its internal processes on multiple occasions. During these attempts it should have identified several ‘red flags’ about the builder and taken reasonable steps in response prior to releasing the progress payments. However, the complainants should also have undertaken proper due diligence and should not have authorised the progress payments without ensuring the relevant insurances were in place. Why is the outcome fair? The complainants’ situation is very unfortunate, and they have my sympathy. However, the position they find themselves in is not wholly because of the bank’s conduct. At a number of key stages, the complainants’ eagerness to advance the project and lack of due diligence has led to them being preyed upon by a predatory builder, Company H. It was Company H’s conduct which caused the financial situation the complainants are now in, and while I understand there is little recourse against Company H, it would be unfair for the bank to shoulder the entirety of the liability for the loss. 1.3 Determination This determination is partly in favour of the complainants. Within 14 days of the date the bank is advised the complainants have accepted this determination, the bank should: · reduce the amount outstanding on the loan by $259,182.00 (along with a further reduction for any interest charges applicable to this amount since 5 February 2024) and · work with the complainants to determine if they have the capacity to obtain sufficient further funding to allow the project can be finished. In all other respects, the loan should remain valid and without further variation. 2 Reasons for determination 2.1 Was the bank required to verify the builder’s licence? No. The bank’s reliance on the information provided by the borrowers and builder, in circumstances where the complainants had the obligation to verify their builder was appropriately licenced, was reasonable in the circumstances. The complainants say the bank failed to verify Company H had a current licence The complainants say the bank’s terms for a construction loan contract require the bank to obtain anything it requires to satisfy itself the builder is appropriately licenced before it will advance the first instalment: If you are using a builder ​If you are using a licensed builder or home improvements company, before you can access the first instalment of the loan amount, you’ll also need to give us: · ​A copy of the construction contract signed by you and the builder or home improvement company. We’ll also need anything we reasonably request to satisfy ourselves that the builder or home improvements company is appropriately licenced; […] The complainants say, had the bank asked appropriate questions, it would have been discovered that Company H had lost its licence in December 2022 and the progress payments would not have been made. A chronology of key events is set out at section 3.2 of this determination. The loan terms do not impose such an obligation An extract from the relevant loan terms is set out in section 3.3 of this determination. The wording of the clause relied on by the complainants does not oblige the bank to do anything in respect of the builder’s licence, merely be reasonably satisfied Company H was appropriately licenced. However, the bank’s documentation makes it clear the borrower has the responsibility to ensure they are using a licenced builder: Prior to entering into a building contract, you must confirm that your chosen builder is a licensed builder. You can check this by contacting the relevant Fair Trading or Consumer Affairs Departments in your State or Territory. While I accept the complainants’ position that had the bank done this check, it would have been revealed the builder was not licenced, the same can be said if the complainants had done so. In circumstances where the complainants had the obligation to ensure the builder was appropriately licenced, and the application and build contract contained representations the builder was appropriately licenced, it was reasonable for the bank to be satisfied on the basis of the representations made by the complainants in presenting the build contract. 2.2 Did the bank properly process the progress payments? No. The bank attempted to obtain the insurance documentation it required for its internal processes on multiple occasions. During these attempts it should have identified several ‘red flags’ about the builder and taken reasonable steps in response prior to releasing the progress payments. However, the complainants should also have undertaken proper due diligence and should not have authorised the progress payments without ensuring the relevant insurances were in place. The complainants say the bank was required to verify insurance The complainants also say the bank was obliged to ensure the builder’s risk insurance policy was sufficient. They rely on the same clause of the construction loan contract as above, which relevantly says: [​...] ​c. If you are using a builder ​If you are using a licensed builder or home improvements company, before you can access the first instalment of the loan amount, you’ll also need to give us: · ​[…] ​A copy of the builder’s risk insurance policy. The policy must provide enough cover for the property until the works are completed to our satisfaction; and […] The complainants say the insurance certificates provided by Company H were demonstrably incorrect and should not have been accepted by the bank. They say, had it not accepted those certificates, the two disputed progress payments would not have been made. There is a difference between Builders’ Warranty and Builders’ Risk insurance As a preliminary issue, it may help to explain: · Builders’ Warranty insurance protects the builders’ client in the event the builder cannot finish the project or fix any defects due to issues with the builder. · Builders’ Risk insurance protects the builder in the event of loss or damage to materials, fixtures or equipment used in the construction. As a result, the existence or otherwise of the insurance required by the bank would not have provided an avenue of redress for the complainants. There was a process required prior to release of progress payments The bank explained how the progress payment system works in its Guide to Residential Building Loans where it relevantly said: The [bank] Residential Building Loan progress payment system has been specially designed to be simple and efficient. It ensures that, at all times, the borrower has control of their finances and that the builder receives prompt payment. The building process is split into standard construction stages. Each construction stage and payment amount is represented as a percentage of the total construction cost you give us when you apply for your loan. The Progress Payment Schedule will detail these stages and percentages together with the actual payments to be made to the builder by the borrowers and/or [bank]. Please note: Borrowers must contribute any money they have agreed to contribute towards the construction before [bank] makes any progress payment to the builder. […] Prior to any funds being advanced or made available [the bank] requires: 1. You to complete all requirements as set out in “Our requirements before we make a loan advance/funds available” clause of the Loan Agreement General Terms and Conditions; and 2. You to complete all requirements as set out in “Our additional requirements if you have a building loan/sub-account” clause of the Loan Agreement General Terms and Conditions. These include providing [the bank] with a copy of the: • Signed contract with the builder • Council or Private Certified Approved Plans and Specifications (if not previously provided to us); and • Any additional items that have been specifically requested by our valuer. The Bank’s mortgage preparers will send a list of requirements specific to your Loan Agreement to your solicitor. If any of the above documentation cannot be provided prior to any land settlement, the Bank may agree to defer receipt of that documentation until prior to the first progress payment. Please note that funds will not be released for the construction prior to receipt of all requisite and outstanding documentation. ​In the circumstances giving rise to this complaint, the complainants paid the deposit and 1st progress payment invoices were paid from the complainants’ contribution. Therefore, these payments were not paid from the credit available under the loan and are not part of this complaint. The complaint focuses on the second and third progress payments: · The 2nd progress payment invoice (frame stage) from Company H: > was in the amount of $259,182.00 > was dated 6 October 2023 > was signed by the complainants on 6 October 2023 and submitted to the bank on the same day > matched the description and amount as set out in the Progress Payment Schedule contained in the build contract signed 10 July 2023. · ​The 3rd progress payment invoice (lock up stage) from Company H: > was in the amount of $259,182.00 > was initially dated 10 January 2024 but was resubmitted to the bank on 2 February 2024 after the amount was amended to reflect the Progress Payment Schedule > was signed by the complainants (but undated) and > matched the description and amount as set out in the Progress Payment Schedule. ​By signing the progress payment invoices and submitting them to the bank, the complainants: · acknowledged the build had reached the stage indicated by the builder and · authorised the bank to make the payment to the builder on their behalf. However, the complainants say this was done subject to the bank’s requirements to be satisfied of matters set out in the loan contract – specifically that a copy of the builder’s risk insurance policy had been provided. The bank says it was appropriate to accept the Certificate of Insurance While multiple copies of Company H’s builder’s risk insurance certificate were provided, and rejected, the bank says it relied on a version of the certificate of insurance provided to it on 27 July 2023. This certificate: · was for an Annual Construction Works Policy · had no interested party listed · listed Ms W as the Named Insured · additional Insureds listed were : Principal, Head Contractor, Project Manager, Sub-Contractors as defined in accordance with the applicable policy wording (not provided) · had an incorrect address for the Insured Address and · covered the period 27 July 2023 to 27 July 2024. Despite the flaws in the Certificate, on or about 24 February 2025, the bank discussed the certificate internally with a senior assessor and he advised, while not in line with the credit policy, the certificate would have been accepted anyway as (verbatim): · The second page depicts all the public liability details of a policy so therefore it had public liability coverage which is only provided for builder risk not individual insurance policies. · The “your insured” list of the builders types and people working on the build · And the policy type is “annual construction works policy” which once again only refers to a Builder Risk Ins policy. The bank did not apply due care and skill However, the decision to proceed despite the defects in the certificate was a deviation from the bank’s internal policy. The bank’s procedures relevantly require the following must be checked on a certificate of currency before an invoice can be paid: · ​Builder’s name/owner’s builder's name · ​Public liability or third-party cover – must be included for a minimum of $1million · ​Policy is current – check the policy has not expired, if it has, request a new policy · ​Risk insurance will be required for external contractors which require structural works, example: pool and shed construction · ​Builders’ Risk Insurance is not required when the progress payment request is not required for initial deposit only, the document will be required at the next progress payment stage. However, this is not applicable for owner builders. Homeowners’ warranty is not Builders’ Risk Insurance and cannot be accepted. The certificate of currency relied on does not comply with the bank’s internal policy as it is not in the name of the builder. It is an annual construction works policy which would generally be in the name of the builder. The bank has confirmed: · an annual construction policy should be in the name of a builder · an owner builder insurance policy would generally be in the name of the property owner and · it would have been clear to the progress payment team that the loan was not an owner builder loan. In addition to the contractual obligations arising under the contract, the bank is required, under section 12ED of the Australian Securities and Investments Commission Act 2001 (the ASIC Act) to provide its services with due care and skill. While I accept the bank had received signed authorisation for the invoice payments from the complainants, in circumstances where a number of insurance policies had been rejected as non-compliant, and there were obvious issues with the certificate relied on, the bank should have made further enquiries with the builder and the complainants before releasing the funds to Company H. From the bank’s subsequent conduct in requesting another certificate of currency on 9 October 2023 (the fourth), it appears the bank was ultimately not satisfied about the validity of the certificate provided on 27 July 2023. The bank has not been able to provide a suitable explanation for why this was the case if it was prepared to release the 3rd progress payment on the basis of the 27 July 2023 certificate. The loss caused to the complainants was reasonably foreseeable The bank is an experienced credit provider with a range of policies and procedures which are designed to ensure it meets its obligations to its customers and its legal requirements to manage risk and prevent foreseeable harm to them. In circumstances where a builder has, on multiple occasions, been unable to provide such a standard document as a compliant Builders’ Risk Insurance Certificate, a lender with internal and external obligations to check the validity of such, and noting the ‘reg flags’ on the document, should reasonably have been aware that there was a real possibility other pieces of documentation provided were similarly defective. This is also the case in the circumstances where the invoices in question were presented prematurely and needed to be re-submitted as the purported works had not in fact been completed for each stage at the time of initial presentation and this was uncovered by the bank’s valuer’s inspections. While I accept the bank had no obligation to certify either the quality, or the completion, of the works per se, this is another indicator of poor conduct by the builder which should have led the bank, reasonably, to protect its position, and that of its customers, through making further enquiries. It would not have been onerous for the bank, at this stage, to make enquiries about why a compliant certificate of currency was proving hard to obtain and run a free online search for the builder’s licence. A lack of a builder’s licence would be a core reason why the insurance was not able to be obtained and would suggest an explanation for the deficiencies in the insurance documents. It is also reasonably foreseeable if builders’ risk insurance was unable to be obtained, then there may be other issues with the builder which may jeopardise the build, and ultimately the bank’s security over the loan via mortgage over the property and therefore cause the complainants’ loss. The complainants have suffered direct financial loss I am satisfied, had the bank exercised due care and skill and challenged the certificates of currency properly, it is more likely than not Company H would have fabricated (as they appear to have done with the certificates provided) a certificate which met the bank’s requirements. However, had the bank taken an additional step of inquiring about the builder’s status more thoroughly, then the general deception by Company H of operating without a licence is likely to have been revealed. The complainants seek the two progress payments, totalling $518,196.90, to be ‘reset’. Doing so would essentially make the bank wholly liable for the loss arising from the conduct of Company H. Essentially, while this money was drawn down from the loan and paid to Company H for works (eventually) completed: · a recent site inspection has revealed multiple defects with the works carried out by Company H and · the dispute between the complainants and Company H has taken so much time the property has been exposed to the elements and damage has been incurred to the compliant works undertaken. No new builder is willing to certify the works and finish the build, and the cheapest option obtained by the complainants is to demolish the partially built structure and start again. While Company H has obtained the benefit of the funds despite its apparent breach of contract, there is apparently no realistic prospect of success in recovering the monies paid given the number of other creditors caught in Company H’s collapse. Company H is now in liquidation. Further, the lack of a licence has revealed a lack of valid builders’ warranty insurance which may otherwise have been available to assist the complainants. In these circumstances, I accept the complainants are now liable to repay the monies advanced under the progress payment schedule but have not received a benefit from those funds. In saying this, I am satisfied the most proximate cause of the loss is the conduct of Company H and not that of the bank. However, had the bank met its obligations, it is more likely than not the loss would have been significantly mitigated. It should be noted I said mitigated, not prevented. The bank refusing to release the progress payments (as it should have done) would not have affected the complainants’ obligations under the build contract to make those payments. While there could have been a dispute about the complainants’ and Company H’s rights and responsibilities earlier had the issues come to light prior to the first disputed payment on 11 October 2023, I am not satisfied the complainants, at that stage, would have avoided all subsequent losses. The complainants contributed to their loss In addition, I reiterate my earlier observation this was also an obligation on the complainants prior to entering the build contract. Had they properly verified their builder, none of the issues would have arisen. In this regard, the complainants say: The contract that we signed had a valid builders license matching a name on the contract, but this now appears to have been done without that builders knowledge. The build contract signed by the complainants listed: · the builder as “[Company H trading name] – Company S” · the ABN of Company H, the entity behind the trading name on the contract and · the NSW builder licence number of Company S who held a contractor licence until 28 August 2025. There is nothing on any other document provided to AFCA which refers to Company S aside from the build contract. In addition, the complainants say: In selecting the builder, we obtained multiple quotes from builders and when settling on this builder, we did undertake multiple points of verification. This included 1. checking the ABN and Builder’s License numbers that were presented on the contract. 2. We physically visited another in progress house renovation that the builder was nearing completion located was in [suburb]. This presented well and appeared from the outside to be of good quality. 3. We reviewed the builder’s website and social media, which also contained photographic evidence of other works that had been completed or were underway. 4. Lastly, the builder was and still is listed on the Master Builders of Australia website. See below screenshot as of 03rd January 2025 While I accept the complainants’ comment the NSW Builders Licence matched that of “a name” on the build contract, I am satisfied the complainants should have taken reasonable steps to understand how Company S related to the construction project, particularly in circumstances where: · the Licence number and ABN did not match · the builder undertaking the work in [suburb] has not been identified as either Company H or Company S · online photographs on websites and social media are not good evidence of anything and · the Master Builders Association NSW website is still not up to date (it still lists Company H) but does not purport to endorse any of the builders listed or verify the accuracy or quality of information provided on its website. Given the above, had the complainants taken additional steps to verify the information in the build contract, or engaged solicitors to do so for them, Company H’s deception would have been realised before the complainants were bound by the build contract. In addition, even if I were to accept the above submission by the complainants about why it was not readily apparent to them there was an issue with the licence, the reasoning put forward by the complainants equally applies to the bank. The complainants say they were not in a position to identify the issues with licencing and insurance but say the bank should have been. I am not satisfied this is the case. At the very least, the complainants were aware of the multiple requests for the builders’ risk insurance, and this could have prompted them to check there were no issues with the builders’ warranty insurance – this could have been verified by a phone call to the insurer on the certificate presented with the build contract. In the circumstances, I am satisfied the complainants’ errors contributed to their loss. The complainants should share liability with the bank In the circumstances, it is fair the parties should share liability for these losses. The bank should reduce the amount outstanding on the loan by $259,182.00 and refund any interest charged to the loan on this amount from 5 February 2024 (the date of the second progress payment being released). The bank should also work with the complainants to determine if they have the capacity to obtain sufficient borrowing so the project can be finished. 2.3 Why is the outcome fair? The complainants’ situation is very unfortunate, and they have my sympathy. However, the position they find themselves in is not wholly because of the bank’s conduct. At a number of key stages, the complainants’ eagerness to advance the project and lack of due diligence has led to them being preyed upon by a predatory builder, Company H. It was Company H’s conduct which caused the financial situation the complainants are now in, and while I understand there is little recourse against Company H, it would be unfair for the bank to shoulder the entirety of the liability for the loss. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Chronology Timeline of key events | Date | Event | 30 Sept 2022 | Company H obtained Certificate of Insurance for projects up to $600,000 | 2 Dec 2022 | Company H builder’s licence cancelled | 8 Feb 2023 | Initial Company H Build Contract signed by the complainants | 17 Apr 2023 | Annual Construction Works Policy Certificate of Currency purportedly issued in Mr BLG’s name for incorrect address and contract value | 8 May 2023 | Second Company H Build Contract signed by the complainants | 12 May 2023 | Property inspection by bank’s agent values property ‘as if complete’ at $2.5m | 22 May 2023 | Loan application made to bank for $691,000 | 23 May 2023 | Loan offer made by the bank for $691,000 | 6 Jun 2023 | Loan acceptance deadline | 10 Jul 2023 | Third Company H Build Contract signed by complainants | 27 Jul 2023 | Annual Construction Works Policy Certificate of Currency purportedly issued in Mrs W’s name | 8 Aug 2023 | Amended contract provided by Company H to update Progress Payment Schedule | 15 Aug 2023 | Company H issued invoice for completion of Base Stage in the amount of $86,561.10 which had previously been fully paid Company H issued invoice for completion of Frame Stage in the amount of $259,182 – signed by complainants on 6 October 2023 | 16 Aug 2023 | Demolition due to start on pre-existing property | 1 Sept 2023 | Construction loan settled | 5 Oct 2023 | Valuer’s Progress Inspection Report confirmed construction reached the Frame Stage | 10 Jan 2024 | Company H issued invoice for completion of Lock Up Stage in the amount of $259,182 – signed by complainants (undated) | 4 Jun 2024 | Building Commission NSW advised Company H licence had been cancelled | 24 Jun 2024 | Company H provided Notice of Termination of Build Contract | 13 Nov 2024 | Company T inspection of property identified shortfalls to frame stage completion 3.3 Relevant contractual information Loan Offer – Additional Information 4. Building Loans [​...] ​c. If you are using a builder ​If you are using a licensed builder or home improvements company, before you can access the first instalment of the loan amount, you’ll also need to give us: · ​A copy of the construction contract signed by you and the builder or home improvement company. We’ll also need anything we reasonably request to satisfy ourselves that the builder or home improvements company is appropriately licenced; · ​A schedule of the required payments you need to make; · ​A copy of the work specifications and planned finishes; · ​A copy of the council approval for your work and approved plans · ​A copy of the builder’s risk insurance policy. The policy must provide enough cover for the property until the works are completed to our satisfaction; and · ​If requested, a copy of a certified quantity surveyor’s report. Guide to Residential Building Loans, effective 17 May 2020 Choosing a builder It is wise to take your time in selecting both the design and builder of your new home. If you are using your own plans, select at least three licensed builders to quote on the work. The Housing Industry of Australia (HIA) or the Master Builders of Australia (MBA) can provide member lists as a starting point. If you are not buying a standard design from a building firm, your builder will need to take away a copy of your plans and specifications. It is a good idea to write down exactly what the builder is to quote on. Otherwise, one quote may vary greatly from another, due to extra work that one builder has included, which another has not. You will find most builders will supply an itemised quote for construction. Ask to see some of the builder’s most recent jobs and ask the owners questions about the builder’s workmanship standards and professionalism. Make absolutely sure your builder is licensed and qualified to do the work. When you have made your choice, ask your solicitor to help you with all the details in the building contract. The HIA and the MBA have standard, proforma construction contracts that are most useful and accepted throughout the industry. You may care to use these. Please ensure your chosen builder has a copy of this [bank] “Guide to Residential Building Loans” and discuss with them the standard progress payment percentages. Borrower’s responsibilities Insurance is compulsory for all building works greater than a certain value depending on your State or Territory. As the borrower, you should ensure that your builder has discussed this with you before signing any building contract. You can find out more about this by contacting the relevant Fair Trading or Consumer Affairs department in your State or Territory. Before your construction commences you must ensure that your builder is fully insured and holds a Contractor’s Risk Insurance policy (in SA it’s called a “Builders Indemnity Insurance”, in WA “Builder’s Risk Insurance” and in NSW it is referred to as “Home Warranty Insurance”.) We recommend that you check that the insurance covers the construction period until practical completion of your home. Does your builder have a current Builder’s Licence? Prior to entering into a building contract, you must confirm that your chosen builder is a licensed builder. You can check this by contacting the relevant Fair Trading or Consumer Affairs Departments in your State or Territory. Plans and specifications You must provide a set of council or private certified approved plans and specifications to us prior to the construction commencing. Building Contract You must provide [bank] with a copy of your signed contract with the builder. How to ensure quality of construction It is your responsibility at all times to ensure that you are satisfied with the quality of construction. This will require regular checks on workmanship. If unsure what to look for, make a point of finding out, or appoint a suitably qualified person to attend on your behalf. If substandard workmanship or materials is detected and advice is needed, you should contact our Progress Payment Department or your lender immediately. The builder should also be informed of your dissatisfaction immediately and your solicitor may need to be informed if the matter is serious. Ensure quality of construction from the start. We recommend that you retain a suitably qualified person to regularly inspect construction as it progresses, but especially for completion of the frame stage. Bank’s Credit Policy – Construction Loans 2.6 Documentation Required from Borrower […] Tender or contract must: […] include the builder’s business name and Builders licence number […] Builder’s Risk Insurance (including Public Liability). The insurance should cover the minimum replacement cost. It must remain current during construction. […] Not required when the progress payment request is for an initial deposit (as advised by the progress payment instruction) to formalise the builder’s contract with the customer. The document will be required at the next progress payment stage. […]

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.