Partial denial of storm damage claim (paved areas, stairs, tanks, garage) as pre-existing and excluded; make safe delay; front door declined
Text of the determination
Determination
|
Case number
|
12-24-149180
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-24-149180 28 November 2025
1 Determination overview
1.1 Complaint
The complainants hold home building and contents insurance with the financial firm (insurer). They lodged a claim for damage following storm activity, which started in December 2023.
The insurer partially accepted the claim and paid cash settlements for the roof and solar panels, and for non-restorable contents. It also paid some temporary accommodation (TA) costs. It denied damage to the external paved areas and stairs, septic and water tanks, and garage were storm related. It says that damage was pre-existing and from excluded causes.
The complainants maintain all the damage is from the storms or the insurer’s failure to attend to make-safe repairs they say it agreed to undertake. They also say the insurer indicated the entire claim had been accepted. They want the insurer to cover all damage, reimburse repair and expert costs, and compensate them for loss of income and for stress and inconvenience.
1.2 Issues and key findings
Is the insurer required to cover more of the damage?
Other than in relation to the front door, no. It has not been shown the disputed damage was storm related. Rather, that damage is likely pre-existing and from excluded causes. I am not satisfied the insurer represented that all the damage would be covered, or that it agreed to undertake extensive make safe works the complainants sought.
Is the insurer required to reimburse expert costs?
No. The complainants’ expert report did not assist them to establish an entitlement to coverage for the disputed damage.
Is indirect financial loss compensation payable?
No. The policy excludes indirect financial loss. Based on the exchanged information, I am otherwise not satisfied the insurer should pay indirect financial loss outside the policy terms.
Is non-financial loss compensation payable?
Yes. While the insurer’s claim handling has been generally reasonable, it delayed provision of sandbags as a make safe measure and incorrectly declined to cover the front door damage. The insurer is to pay each complainant $1,000 for the resultant stress caused.
Why is the outcome fair?
The outcome fairly reflects the policy response to the claim and the insurer’s claim handling.
1.3 Determination
This determination is partially in favour of the complainants. If they accept the determination, the insurer is to within 28 days pay the reasonable cost of replacing the front door plus interest, and $1,000 each ($2,000 in total) in non-financial loss compensation.
2 Reasons for determination
The parties have submitted a large volume of information to AFCA. While this determination does not refer to all the material provided by the parties, I have considered everything in reaching my decision.
The complainants have made several serious allegations about the insurer, including that it has engaged in systemic misconduct. They say their complaint is a test of industry standards. However, AFCA provides a dispute resolution service; it is not a regulator of insurers.
2.1 Is the insurer required to cover more of the damage?
Other than in relation to the front door, no. It has not been shown the rest of the disputed damage was storm related. Rather, that damage is likely pre-existing and from excluded causes. I am not satisfied the insurer represented that all the damage would be covered, or that it agreed to undertake extensive make safe works the complainants sought.
Complainants must show a claimable loss under the policy terms
The complainants are required to show, on the balance of probabilities (that it is more likely than not), that they suffered a loss claimable under the policy. This means they must show the loss was caused by a risk for which they are insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainants for loss or damage to their home or to their contents caused by a listed insured event. Those events include ‘Storm, cyclone, rainwater or run-off’.
On 16 January 2024, the complainants lodged a claim with the insurer. They said their home and contents had been damaged by hail and water ingress during storm activity between 22 December 2023 and 3 January 2024.
The insurer accepted that the roof and solar panels were hail damaged, and that some contents items had mould and water damage. It paid cash settlements for that damage. The insurer accepts the complainants established a claimable loss to that extent. However, it denies the storms damaged the external paved areas, rear stairs, septic and water tanks, or the garage.
Once the complainants prove the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Proximate cause of loss must be determined
In a general insurance claim, the term ‘proximate cause’ is used to describe whether an event is the cause of the loss or damage. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the only cause. It is a question of fact that depends on the circumstances of each case.
If there are several causes, each should be examined to determine whether it is a dominant, effective or operative cause of the loss. For example, if one cause would have caused the loss on its own, and the other cause would not have caused the loss without the first, then the first is the proximate cause.
Insurer relies on expert reports
The complainants purchased the home on 1 June 2023. In doing so, they had access to a pre-purchase property and pest report prepared by builder SE following an inspection on 22 March 2023. The insurer refers to the following findings by SE:
· efflorescence on brickwork/masonry, noted as a minor defect. SE said the dampness that causes efflorescence could be from ground water, atmospheric, dampness in masonry or mortar, or a failed waterproofing behind a subterranean wall
· surface moisture in the subfloor area, which could cause moisture problems for the building elements. SE noted aggie drains bedded in crushed rock were the preferred solution, and that appeared to have been implemented at the rear of the masonry wall
· minor settlement cracking and maintenance items throughout, mainly age-related and due to wear and tear
· wood rot in several areas, due to continued exposure to damp conditions. Replacement to prevent further deterioration was recommended
· excessive moisture, creating conducive conditions for termites. Dispersal of moisture from the immediate perimeter of the home was recommended
· evidence of previous termite management, wood rot activity and conditions conducive to timber pest attack, including the ground surface clearance for subfloor timbers.
At the insurer’s request, builder JL inspected the home on 23 January 2024. JL reported that the complainants wanted trenches dug around the home as make safe work to prevent further water ingress into the subfloor. JL said there was storm damage present but recommended a causation report be obtained from an engineer on the damage in the garage and the subfloor.
On 24 January 2024, JL’s plumber attended and recommended a subsoil drainage system be installed in front of the front outer wall. The plumber reattended on 31 January 2024. The complainants had dug a hole where the front stairs used to be. Water was collecting there then leaking through the external brickwork, said to be due to waterproofing having failed over the years. The complainants wanted trenches dug as make safe work to redirect the water.
Despite the insurer requesting on 31 January 2024 that sandbags be provided for use as a make safe measure, they were not delivered until 23 February 2024.
On 15 March 2024, JL reattended to review additional damage that had been raised. JL said:
· heavy, wind driven rain during the storm event had soaked the front door, causing it to expand, warp and crack
· the window frame damage was age related and due to long term movement, not the storm
· the paint damage on the masonry blocks in the gym was storm related, but repairs could not be warranted as the porous nature of the blocks meant the damage could reoccur
· it believed the storm event caused the septic and water tank movement which resulted in pipes breaking and leaking.
On 4 April 2024, plumber PP inspected the property and reported to the insurer that:
· the inground rainwater tank and the inground septic tank had shifted towards the home
· CCTV inspection of the drainage system showed pipes were filled with semi-clean water
· the flood line of the drainage pipe coincided with the water level in the rainwater tank, septic tank, and grease trap. A laser level confirmed their water levels were all aligned
· ‘I believe that groundwater and heavy rainfall have accumulated along the high side of the tanks, causing them to settle and fracture. Consequently, this has led to contamination between the rainwater and septic systems’.
On 16 April 2024, building consultant CF inspected the property. CF told the insurer that:
· Bureau of Meteorology data from a weather station about 10.5km from the home indicated 66.8mm of rain fell on 22 December 2023
· the land falls away from the street to the home by about 2.5m, and the ground level has been cut by a further 1.8m to allow the garage to be built under the home
· there was cracking to external paving around the water tank concrete lid in the backyard, to the external concrete driveway, and to the garage’s internal concrete slab
· stormwater drainage was inadequate and had been allowing water to be diverted to the home over years
· ‘the extensive rainfall during the noted period exacerbated the pre-existing condition; however, is not the proximate cause of the damage, and it is considered that if drainage at the Property was sufficient, the damage would not have occurred’
· lack of stormwater management played a pivotal role in surface water entering under the concrete slabs. That was a maintenance issue
· there was waterproofing to the garage wall’s exterior, but its extent could not be confirmed as the wall goes below ground level. Large rocks placed against the waterproofing may have pierced the membrane
· the cracking was not consistent with being caused by a one-off storm event. It had been occurring gradually over years due to inadequate drainage causing soil movement.
On 5 June 2024, plumber KQ inspected the sewer and stormwater lines. KQ said:
· both lines had a 2m backfall
· that could have been caused by seasonal (winter) ground movement and sinkage
· the grease trap had a significant 20-30mm fall between the inlet and the outlet, with the outlet pipe on a 15-degree increasing angle exiting the trap
· the grease trap tank outlet was notably deteriorated which could cause seepage when in use and full as the O-ring was exposed
· the grease trap tank may overflow during heavy rains, which could lead to grey water entering the rainwater tank as the rainwater tank inlet is lower than the grease trap lid
· the hose on the grey water pump out line was deteriorated and may leak during pump outs. As the hose is moveable, it could spray near the rainwater tank
· due to the backfall, the sewer pipe was holding sewage. An image taken at 7m appeared to show a potential break between the pipe and the tank
· markings in the pipe at 7.9m after cleaning indicated a re-occurring issue
· there was no conclusive evidence of cross connection causing the rainwater tank to be contaminated. However, the tank water should be tested.
In an email KQ said the septic tank and grease trap looked to have been installed to code as at the time of installation. The rainwater tank inlets appeared to have been modified to allow for leaf catching. That could allow ground water to enter the tank. KQ noted the complainants had the tanks inspected and presumed any code violations would have been identified.
On 11 June 2024, the water quality in the rainwater tank was tested. The sample was contaminated with E. coli, which could indicate faecal contamination.
The insurer also obtained several reports from engineers. Engineer T inspected the home on 2 February 2024. T reported that:
· during heavy rain events, surface water flows down to the front of the home
· only nominal surface drainage had been installed in the past
· surface water management needed to be improved, to move water away from the home and from the gravel drainage system behind the large retaining wall in the garage
· it appeared water moves through the soil on the uphill side of the home. The subsurface water was going into the large retaining wall drainage gravel, through the waterproofing, and into the garage. Adequate subsurface drainage was required to catch the subsurface water before it builds up against the home
· soil had been built up against the home along the front and down the western side, so:
> subsurface water could move through to the home and permeate into the subfloor
> soil could hold moisture against the subfloor external walls, causing moisture issues
> if the soil is built up too high from the footings, the brick wall below floor level becomes a retaining wall, and it may not be designed for that purpose
> if the soil is too high, it can enable termites to enter the timber subfloor members
· the large retaining wall should have gravel behind it to relieve hydrostatic pressure and to drain water away from the area behind the wall
· the complainants’ comment that water was coming in under the retaining wall indicated the waterproofing and drainage was not functioning properly
· ‘A significant amount of surface and subsurface drainage work is required to adequately address the issues observed’.
T reinspected the home on 26 March 2024. T said:
· it believed the cracking to the garage slab, driveway, and rear slab was shrinkage cracking that had been occurring over a long period of time and was not caused by the rain events
· the septic tank and pit had a considerable lean on the top surface. They might have been affected by the rain event, and should be assessed by a qualified septic contractor
· the rear stairs landing was out of level. The timberwork for the landing and stairs was original and in poor condition, with evidence of wood rot. There were also inconsistencies between the footings. These were age related issues, not due to the rain events.
On 29 May 2024, engineer CR inspected the home. CR reported that:
· the primary cause of damage to the driveway was concrete plastic shrinkage cracking, contributed to by lack of adequate jointing and reinforcement, in conjunction with long term ground movement and root activity from nearby mature trees
· online images indicated the presence of some cracking in May 2014, and real estate images showed cracking present as of June 2022
· the primary cause of water ingress into the garage and subfloor was ground borne moisture accumulating behind the retaining walls and seeping through in the absence of an effective waterproofing membrane and free drainage material
· the movement damage, including to the patio slab over the rainwater tank, was the result of large fluctuations in moisture content of founding soils due to proximity of mature trees
· real estate images from December 2022 showed the fall in the mid landing of the rear verandah stairs was long term
· none of the damage was due to a one-off storm event.
In its supplementary report dated 3 July 2024 CR said:
· the sewer and stormwater pipe backfall issues were consistent with ground movement over time. That opinion was based on the extent of mature trees and vegetation in close proximity, and KQ’s identification of markings showing a re-occurring issue
· the backfall issue did not directly cause contamination of the rainwater tank. Unless there was a breakage in the pipe or at a connection, water would just sit in the backfall
· the fall and exposed O-ring within the grease trap was due to ground movement over time
· as the grease trap sits higher than the rainwater tank inlet, if the grease trap overflows during heavy rains, water from the grease trap could enter the rainwater tank
· therefore, the grease trap was a potential contamination point, as was the leaf catching modifications to the rainwater tank inlets as they allowed ground water to enter the tank
· in its opinion, the E. coli contamination was due to the modified rainwater tank inlets and the issues with the grease trap.
Insurer denied coverage for the disputed damage
The insurer says the proximate cause of the disputed damage was not the storm activity. Rather, that damage pre-existed the policy’s commencement on 1 June 2023 and is from excluded causes given that the PDS states on:
· page 17 that the storm insured event does not cover loss or damage caused by hydrostatic pressure or by rainwater entering the home through an opening not created by storm
· page 55 that there is no cover for loss or damage as a result of, caused by or arising from:
> gradual deterioration, wear and tear or lack of maintenance
> inherent defects including faulty design or materials, structural defects or poor workmanship
> soil movement including subsidence unless it is directly caused by and occurs within 72 hours of a storm.
The insurer also denies that it ever represented to the complainants that the claim would be fully accepted, or that it committed to undertake make safe works. It says the PDS indicates on page 59 that it is an insured’s responsibility to make safe and to take steps to mitigate further damage. Accordingly, any make safe work it does is on a goodwill basis.
Complainants say disputed damage should be accepted
The complainants say they experienced repeated severe storm activity between December 2023 and March 2024, and that the Insurance Council of Australia classified the period as a catastrophic weather event. They submit that damage then occurred within a three-month period across multiple unrelated sections of the home.
The complainants consider that the insurer misrepresented SE’s pre-purchase report. They submit that the report only referenced two minor defects and provided some general information. Further, that the report did not require any action to be taken, and that SE has told them none of the disputed damage was present at the time of inspection.
In relation to the insurer’s expert reports, the complainants submit that:
· conflicting and inconsistent views on causation have been provided and have not been reconciled
· none of the reports referred to the catastrophic weather events, ’even though the severity of those events should have been recognised as a clear and obvious contributing factor’
· no soil, moisture, or hydrological testing was conducted to confirm or exclude storm-related ground movement
· the insurer selectively quoted and reworded the expert opinions in a distortionary way
· the experts were biased and unduly influenced each other.
The complainants’ engineer CY inspected the home on 14 March 2025, and reported that:
· SE’s report concluded that the home was in good condition overall, and in a similar condition to other well-maintained buildings of the same age
· the complainants had lived in the home for six months with no issues until the storm events
· its inspection identified areas that appeared to have been recently damaged by the storm events, including the garage floor, septic tank, water tank, and grease trap
· there was significant cracking to the garage concrete slab. Many of the cracks appeared to be new. Based on a photo SE had taken, it appeared the slab’s condition had deteriorated significantly since 22 March 2023
· ‘The underlying cause of the new damage to the concrete is uncertain and further detailed investigation would be required to confirm this’
· the septic and water tanks had subsided to some degree and appeared to be leaning towards each other. The grease trap had also sagged and was also not level
· ‘it was not possible to identify the exact cause of the subsidence issues visually without undertaking excavation work’
· based on the standard of SE’s report, it was difficult to imagine that the new damage to the garage floor and the subsidence of the septic and water tanks would not have been identified if they were present when SE inspected the home
· that strongly suggests the damage had occurred since 22 March 2023.
The complainants have provided an email dated 25 March 2025 from the buyers’ agent who assisted them in buying the home. He said the home was well maintained and in good condition, the garage was in good working order, and the driveway was serviceable with no major cracking. There were no obvious issues with the tanks. There were minor issues with the home, but none that ‘set off alarm bells’.
In addition, they have submitted an email dated 26 March 2025 from the selling agent. He said there were no major issues with the home, and only minor standard settlement cracks.
The complainants have also provided a letter dated 26 June 2024 from their bulk water carrier. He said he delivered water on 20 December 2023, and there were no cracks on the patio, including the area around the water tank’s two lids.
They have also submitted several videos, including of rainfall run-off on the property, and of water ingress into the garage/gym.
Additionally, the complainants say that the driveway was further damaged by trucks arranged by the insurer to deliver shipping containers for storage of restorable contents.
The complainants maintain that the insurer committed on several occasions to attend to make safe work. They say they relied on those representations and delayed their own remediation activities, but the insurer did not deliver any make safe assistance. They submit this resulted in more damage to the home due to further storm activity.
The complainants also say the insurer said their claim had been accepted, in an email dated 16 February 2024. They say the email and the insurer’s cash settlement payments led to a reasonable belief that all damage would be covered. Further, that they relied on the insurer’s representation to their detriment, including by undertaking make safe work themselves.
They say the doctrine of promissory estoppel prevents the insurer from resiling from its representation.
Insurer is not required to cover more of the damage
Based on the exchanged information, I am not satisfied that the proximate cause of the disputed damage was the storm events. Rather, it is more likely than not that damage is from excluded causes. This is because:
· there is clear evidence of pre-existing moisture penetration issues and settlement cracking, as well as movement and wood rot damage to the rear stairs. That is documented in SE’s pre-purchase report and the online and real estate images
· there is no expert opinion that unequivocally says that the cracking/movement damage to external paved areas and the garage is due to the storms:
> CF, T and CR said that was from excluded factors, not the storms
> JL thought the paint damage on the masonry blocks was storm related, but noted the damage could reoccur as the blocks were porous (i.e. the waterproofing had failed)
> CY said the garage floor appeared to have been damaged by the recent storm events, but also said the ‘underlying cause of the new damage to the concrete is uncertain’
· in relation to the septic and rainwater tank movement:
> PP said it ‘believes groundwater and heavy rainfall have accumulated along the high side of the tanks, causing them to settle and fracture’. That reasonably suggests hydrostatic pressure over time caused the damage
> KQ said it may have been caused by seasonal (winter) ground movement and sinkage, and that there were signs it was a re-occurring issue
> CR said it was consistent with ground movement over time
> CY said the tanks appeared to have been damaged by the recent storm events, but also said ‘it was not possible to identify the exact cause of the subsidence issues visually without undertaking excavation work’
> even assuming the storm activity led to soil movement that affected the tanks, there is no reasonable basis to conclude the movement occurred within 72 hours of the storm
· the conclusions of CF, T and CR are overall consistent. Their reports are detailed and contain scientific data, test results, and numerous supporting images
· CY’s report is less detailed and contains fewer supporting materials
· I therefore find the reports of CF, T and CR persuasive
· while the storms may have contributed to or exacerbated the damage, that is not sufficient to make it the proximate cause
· the complainants’ reliance on section 54 of the Insurance Contracts Act, 1984 (ICA) regarding proximate cause is misplaced
· I acknowledge there are some inconsistencies between the opinions of the insurer’s experts. However, I do not consider that is a basis to not have regard to those opinions. I also consider it is an indication those experts are independent
· I am not satisfied there is persuasive evidence of bias or undue influence tainting the insurer’s experts
· a temporal connection between an event and damage of itself does not establish causation
· I acknowledge the complainants have provided very detailed submissions on causation. However, I am not satisfied they have the requisite expertise to be regarded as experts
· I also acknowledge the comments made by the buyers’ agent, the seller’s agent, and the water carrier. However, appropriately, they have not expressed a view on causation.
The exception to my conclusion is in relation to the front door. In its report following reattendance on 15 March 2024, JL said the front door had been damaged by storm. No contrary expert opinion has been submitted. If it has not already done so, the insurer is to pay the complainants the reasonable cost of replacing the front door, plus interest under section 57 of the ICA from 1 April 2024 (allowing a period for processing of JL’s view).
Based on a careful review of the exchanged information, I am not satisfied that the insurer committed to undertaking make safe work of the kind the complainants were after. Furthermore, make safe repairs are intended to be temporary measures, and would not typically include extensive excavation and landscaping.
Further, while the insurer delayed providing sandbags, it is questionable whether they would have provided even a temporary effective solution. To the extent that delay caused the complainants stress, it is best considered in terms of their request for non-financial loss compensation.
I am also not satisfied that the doctrine of promissory estoppel applies to prevent the insurer from denying the disputed damage. This is because:
· an indication that a claim is accepted does not mean every aspect of damage will be covered, such as damage that is yet to be identified
· there is nothing to show the insurer represented all aspects of the claim were accepted
· the exchanged information does not show that it agreed to cover the disputed damage
· it does not appear that the complainants delayed undertaking make safe works. To the contrary, they had significantly advanced such works within two weeks of claim lodgement
· that the complainants undertook make safe works does not establish detrimental reliance as they were ultimately responsible for that work in any event.
In the absence of any expert evidence commenting on it, I am unable to accept that trucks the insurer arranged damaged the driveway. I note that the complainants may have rights against the truck company if that damage did occur.
Other than for the front door, the insurer is not required to cover more of the damage.
2.2 Is the insurer required to reimburse expert costs?
No. The complainants’ expert report did not assist them to establish an entitlement to coverage for the disputed damage.
AFCA may require insurer to contribute to a complainant’s professional costs
The AFCA Rules enable us to require an insurer to contribute to professional costs incurred by a complainant, usually capped at a total of $5,000. When considering whether to require an insurer to contribute, we look at matters like the complexity of the complaint and whether the complainant needed to incur costs to understand or establish their claim.
Insurer is not required to reimburse expert costs
The complainants want the insurer to reimburse them the cost of CY’s report.
I acknowledge the claim and the resulting complaint have involved issues of some complexity. However, I am not satisfied the complainants needed CY’s report to understand those issues. Rather, the report was obtained to contest the insurer’s position. Further, CY’s report has not assisted them to establish an entitlement to coverage for the disputed damage.
Accordingly, the insurer is not required to reimburse the cost of CY’s report.
2.3 Is indirect financial loss compensation payable?
No. The policy excludes indirect financial loss. Based on the exchanged information, I am otherwise not satisfied the insurer should pay indirect financial loss outside the policy terms.
AFCA can award compensation for indirect financial loss
Under paragraph D.3.2 of its Rules, AFCA may require an insurer to compensate a complaint for indirect financial loss (also known as consequential loss). The maximum amount we may award is capped at $6,300.
We may not award indirect financial loss under a general insurance policy that expressly excludes such liability. However, we may make such an award outside the policy terms if the insurer’s conduct justifies doing so.
Complainants seek indirect financial loss compensation
The complainants acknowledge that the PDS states on page 57 that consequential loss, such as loss of income’ is excluded. They say they are not seeking compensation for loss of income under the policy. Rather, they say the insurer’s unreasonable claim handling has caused them loss of income for which the insurer should compensate them.
The complainants refer to:
· one of them being medically certified as unfit to work for a week in May 2024 and four days in November 2024 due to stress
· having to pay for make safe and other repairs, and the time they spent on those repairs
· medical expenses incurred because one of them sustained a wrist fracture due to a fall on the unrepaired retaining wall, and developed bilateral tendonitis from undertaking repairs
· loss of income due to multiple changes in TA and from having to meet with the insurer’s trades and experts.
Indirect financial loss compensation is not payable
As the PDS excludes consequential loss, I am unable to award indirect financial loss compensation under the policy.
Based on the exchanged information, I am otherwise not satisfied the insurer should pay indirect financial loss outside the policy terms. This is because:
· for the reasons outlined in section 2.1 above, the insurer was not obliged to attend to the make safe work sought or to rectify the disputed damage
· while I accept that the insurer delayed provision of sandbags, to the extent that delay caused the complainants stress, it is best considered in terms of their request for non-financial loss compensation
· an insured has an obligation to reasonably assist an insurer with its claim investigations, and this invariably has a time impost for which an insurer is not typically responsible
· the complainants have not provided any documents to establish the losses said to have been incurred due to being away from work because of the insurer’s actions.
2.4 Is non-financial loss compensation payable?
Yes. While the insurer’s claim handling has been generally reasonable, it delayed provision of sandbags as a make safe measure and incorrectly declined to cover the front door damage. The insurer is to pay each complainant $1,000 for the resultant stress caused.
AFCA can award compensation for non-financial loss
Under paragraph D.3.3 of its Rules, AFCA may award up to $6,300 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind.
Where there is more than one complainant, and each complainant suffered non-financial loss, each can be awarded compensation.
AFCA takes a conservative approach to awarding compensation for non-financial loss. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation.
Non-financial loss compensation is payable
The complainants say the insurer has caused extensive delay, mishandled their claim to an unconscionable extent, treated them in a rude and dismissive manner, and made repeated misrepresentations. They refer to ongoing difficulties in relation to TA arrangements, including premises not suited to their needs and an abrupt cancellation prior to a public holiday.
They consider that the insurer has not acted towards them with the utmost good faith as required by section 13 of the ICA. Further, that it has failed to comply with its obligations pursuant to the General Insurance Code of Practice (Code).
The complainants submit that the insurer’s actions have caused an immense physical and emotional toll.
I acknowledge the storm events, the damage to their home and contents, and the claim process have presented major challenges and stress for the complainants. However, I consider the insurer has generally handled the claim reasonably. This includes because:
· It appears to have handled the claim overall in accordance with the Code
· to the extent delays were experienced, they were often for reasons outside the insurer’s control, such as availability of trades and experts following the catastrophic weather event
· it offered TA at an early stage, and ultimately paid for a week of TA beyond the policy limit to enable the complainants to make alternative arrangements
· the exchanged information does not establish that it abruptly cancelled TA prior to a public holiday, or that it acted towards the complainants in a rude and dismissive manner
· for the reasons outlined above, I am not satisfied the insurer made misrepresentations.
However, I accept that there were delays in the provision of sandbags and that this would have caused the complainants stress and frustration. It also appears that the insurer declined to cover the front door damage despite a report from JL stating that was storm related. I accept this was stressful and frustrating for the complainants.
I am therefore satisfied that it is fair to require the insurer to pay each of the complainants $1,000 in non-financial loss compensation.
2.5 Why is the outcome fair?
The outcome fairly reflects the policy response to the claim and the insurer’s claim handling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.