Home / Allianz Australia / Determination 12-24-148271

Determination 12-24-148271

Cash settlement amount and scope of storm damage repairs, temporary accommodation and claim handling

FirmAllianz Australia
Decided2025-09-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$113,768
Non-financial loss$6,300
Amount claimed—
SourceAFCA PDF

Summary

Following storm damage, the insurer cash settled the claim at a level the complainant said was inadequate for repairs. AFCA found for the complainant, requiring settlement based on FL's quote plus 10% contingency, temporary accommodation, storage, the adviser's fees and $6,300 non-financial loss.

The insurer's builders refused to warrant repairs and its scope of works was incomplete, so a cash settlement based on FL's quote plus contingency was the fair way to cover storm damage under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay claimpay compensationpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-148271 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-24-148271 3 September 2025 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) on 2 January 2024 after storms damaged the property on or around 8 December 2023. The insurer accepted the claim for the damage from stormwater ingress to the property. It denied liability for the pre-existing cracking to the property caused by differential movement due to seasonal variations and other environmental factors. The insurer elected to cash settle the complainant for the repairs as both its builders TW and LY refused to warrant the work. A paid representative (DC) represents the complainant. For ease of reference both DC and the complainant will be referred to as ‘the complainant’, unless specifically mentioned. The complainant seeks the insurer to settle the claim based on the average of his builders’ (DS, NO and FL) quotes, allow temporary accommodation, pay DC’s fees and compensation for its claim handling. 1.2 Issue and key findings Is the insurer’s settlement fair? No. While TW and LY presented repair quotes, they refused to repair the damage. Their quotes are not actionable. The exchanged information shows the kitchen tiles sustained storm damage and should be included in the scope of works. The kitchen cabinetry requires replacement as part of the stormwater damage repairs to the property. The insurer’s settlement offer is inadequate to have the storm damage repaired by DS, NO or FL. It is fair the insurer pays for repairs based on FL’s quote plus contingency. It should allow six weeks temporary accommodation for the repair period and pay for contents storage. It is also fair the insurer reimburses DC’s professional fees as DC assisted the complainant with the claim and this complaint. Why is the outcome fair? The parties are bound by the policy terms and conditions. The insurer is liable for the loss covered under the policy. Its offer to pay non-financial compensation is fair. 1.3 Determination This determination is in favour of the complainant. Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to settle the claim as explained in section 2.1 and pay $6,300 non-financial loss compensation. It is not required to take any further action in relation to the claim or this complaint. 2 Reasons for determination 2.1 Is the insurer’s settlement fair? No. While TW and LY presented repair quotes, they refused to repair the damage. Their quotes are not actionable. The exchanged information shows the kitchen tiles sustained storm damage and should be included in the scope of works. The kitchen cabinetry requires replacement as part of the stormwater damage repairs to the property. The insurer’s settlement offer is inadequate to have the storm damage repaired by DS, NO or FL. It is fair the insurer pays for repairs based on FL’s quote plus contingency. It should allow six weeks temporary accommodation for the repair period and pay for contents storage. It is also fair the insurer reimburses DC’s professional fees as DC assisted the complainant with the claim and this complaint. Complainant must establish a claimable loss When making a claim, the complainant has the initial onus of establishing he suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim. Policy cover is subject to terms and conditions The policy covers loss or damage caused by storms and rainwater. It excludes cover for loss or damage caused by rainwater, run-off, hail, wind or water that enters the buildings through an open door, window or other opening (this exclusion does not apply to openings made by the storm or cyclone, or, if the complainant had selected the optional cover accidental damage). The complainant did not have accidental damage cover. The policy states the insurer would pay the reasonable cost of repairing or rebuilding the damaged part of the buildings to the same condition as when it was new. At the insurer’s discretion (acting reasonably), it may: · enter into a contract with a builder to repair or rebuild the home, or · pay the reasonable cost of repairing or rebuilding the home in cash or cash equivalent. Insurer accepted liability for storm damage to the property The complainant says prior to the weather events, the home did not have: · mould · paint peeling off the internal walls · sodden wet carpets · water damaged contents. After the complainant lodged the claim, restorer CW attended the property on or around 12 January 2024 to complete make-safe works. The complainant says that water came down the walls soaking into the carpet over the course of days. These were all caused by the severe weather and thereafter compounded by the completely ineffective coverings placed on the roof by the insurer’s contractors. The complainant acknowledges there is pre-existing minor cracking that is not part of the claim. This consisted of minor plaster repairs carried out many years ago due to normal house settling, a common occurrence in older homes. He does not request the insurer to repair these minor imperfections. TW’s report indicates it attended the property on 19 February 2024, six weeks after claim lodgement. It had appointed engineer IM (attended on 30 January 2024) to determine the cause of the cracking to the property. IM concluded there was cracking throughout the property, aged over years, from differential footing movement due to several factors including seasonal and environmental influences. The insurer initially partially accepted the claim stating the other damages to the property has occurred due to the following maintenance related issues: · water has entered due to box guttering that runs along north wall · leaking roof flashings and leaking through the roof sheeting due to the roof being in poor overall condition, with heavy corrosion The insurer subsequently accepted liability for stormwater damage to the hallway, lounge, kitchen and sunroom. This is fair in the circumstances. Complainant’s builders’ proposal to repair the full plaster is fair Both TW and LY provided their estimates to repair the property. However, they both refused to undertake repairs stating they were unable to warrant the work due to the pre-existing cracking and general movement at the property. While TW revised its quote for the repairs based on the insurer’s second engineer’s (SW) scope of works provided in July 2024, it still refused to repair the damage and warrant the work noting the following: In our opinion the reinstatement works should be applied to the plaster lining and painted surfaces in ceilings and walls for the hallway, living/lounge, sunroom and kitchen areas… Allow for the surface repair of internal wall cracks using the following procedure: • Hack off 150mm of render on both side of the crack, back to a competent substrate. • Reinstate the wall render using a compatible interior wall render, strictly in accordance with HB 161:2005 – Guide to Plastering and the manufacturer’s specifications, with feathering out to surrounding render to match existing finish and texture. The policy says the insurer must pay the reasonable cost of repairing or rebuilding the damaged part of the buildings to the same condition as when it was new. The exchanged information shows the complainant’s builders offered a repair solution which included a full plaster replacement of the damaged areas and not the work proposed by SW as above. Given the insurer’s builders’ refusal to complete the repairs at the property and the above, I am satisfied the complainant’s builders’ proposal to repair the full plaster instead of following SW’s scope of works above, is fair. Insurer liable for damage to the kitchen tiles Both the initial and final reports from restorer CW observed stormwater/moisture damage to the tiles: Property has been severely water damaged. The ceiling and walls have started to bubble and have mould and water staining developing all over the room. The roof has been replaced but all the remaining plaster inside the property will need to be replaced. Kitchen: The tiles have started to loosen the grout due to moisture going underneath. CW recommended the tiles should be replaced. While IM did not comment on the specific cause of damage to the kitchen tiles, SW indicated this was unrelated to the storm event. No expert explained why this damage is excluded from the repairs or scope of works. The insurer has not clearly explained why this damage should be excluded by the cover extended under the policy. One of TW’s quotes included replacement of the kitchen tiles. This included waterproofing and removing and refitting the kitchen cabinetry. This was later removed from the final repair quote because repairs to the damaged kitchen tiles was not included in the SW’s scope of works. SW’s flooring measurements show the middle of the kitchen flooring had lifted compared to the other section adjacent to this area. I note carpets at the property were removed and discarded as they were drenched with stormwater and considered non salvageable. This indicates the areas near the kitchen tiles suffered from moisture ingress from the storm. Given the above, I am satisfied the exchanged information shows the kitchen tiles sustained storm damage. It is therefore fair the insurer accepts liability for replacement cost of the damaged kitchen tiles. Insurer liable for kitchen cabinetry replacement The area of storm damage marked by SW includes the entire kitchen (see section 3.2). SW’s scope of works includes wall plaster repair, cracking repair and painting of the kitchen area. SW’s scope of works does not however explain how the builder is expected to repair the walls behind the splashback and cabinetry. The removal of the kitchen cabinetry also appears to relate to the replacement of the kitchen tiles. This is because the existing cabinetry will require removal for the tiles to be repaired. This work will include waterproofing to the subject area. TW’s quote initially included the removal and refitting of the cabinetry. This was subsequently removed as explained above. There is limited information about the type of existing cabinetry and if and how this may be removed and refitted. The complainant’s builders DS, NO and FL have all quoted for the replacement of the kitchen cabinetry. Given TW and LY have refused to undertake repairs, it is not fair to cash settle the complainant on the basis the cabinetry can be removed and refitted. Especially when the complainant’s builders, including FL, have not offered this option within their quotes. It is therefore fair the insurer pays for the kitchen cabinetry replacement as this allows the complainant to repair the storm damaged parts of the building pursuant to the policy terms. It is fair the insurer settles the claim based on FL’s quote The insurer says it proposed a cash settlement because the complainant delayed remedial works to the property. However, the exchanged information shows the complainant completed the remedial works suggested by the insurer and IM by April 2024. I accept the insurer’s builders TW and LY refused to complete the works because they could not warrant the repairs, not because their repair quote estimate was inadequate to complete the necessary repairs to the property. Based on SW’s scope of works, TW revised its estimate to $32,003.94. DS’s and NO’s quotes are over 12 months and were issued prior to SW’s scope of works. NO’s quote included replacement with a stone bench top when the complainant’s existing bench is not one made of stone. The insurer says their quotes also included the replacement of the carpets in several areas. However, the insurer had previously cash settled the complainant for this part of the claim. It is unclear if the complainant presented SW’s scope of works to FL. FL however did not follow SW’s scope of works. The works described in FL’s quote ($96,750) was mostly similar to DS’s and NO’s quotes. The insurer says on 20 August 2024, it offered $38,404.73 and this represents the fair and accurate value of the claim plus a 20% uplift. It recently increased the offer to $67,613.68 plus $13,522.73 for uplift/contingency (20%). The insurer’s appointed quantity surveyor CF performed a desk top review of the quotes and concluded TW’s repair estimate was fair and reasonable. This does not assist the insurer as I do not accept that SW’s scope works were complete and that TW’s quote is actionable. I am not satisfied that SW’s scope of works is fair and reasonable. This is because it did not address the damage to the kitchen tiles and the works required to the kitchen cabinetry. There is no builder’s actionable quote which agrees to complete the works at the property, based on SW’s proposed scope of works. SW’s scope works states that the builder may submit a request for variation: If there are any significant variations, difficulties, upgrades because of Codes or Building Standards, or additional damage not uncovered or reported / included in the Scope of Works presented, then the instructing principal should be notified immediately for clarification and further instructions should be sought possibly involving the Silver Wolf Projects if that is appropriate or if we can assist…. In the event of unspecified damage being determined or requirements of change of method of reconstruction, the prime contractors will advise and seek the approval of the Insurers and Loss Adjuster in writing prior to work commencing or continuing…. All contractors are urged to digitally photograph and record any issues that are of concern, any damage that may have been caused in the undertaking of these works or any aspects that may give rise to variations or disputes. If the complainant is cash settled based on TW’s quote, he will be disadvantaged as he will not be entitled to submit a variation. The insurer has not explained how the complainant is to arrange repairs with any of his builders given the cash settlement it offered is lower than their respective quotes. The complainant says the condition of the property continues to deteriorate. Given the above, I am satisfied it is fair in all the circumstances the insurer cash settles the repairs based on FL’s quote ($96,750). This is because: · both TW and LY refused to complete repair work at the property · SW’s scope of works is inadequate and incomplete · FL’s quote is based on a fair scope of works where the storm damaged areas will be repaired pursuant to the policy terms · FL’s quote is the most recent quote. Further it is also fair a contingency of 10% is added to FL’s quote, as settlement. This is to account for the fact FL’s quote is eight months old as well as the transfer of risk. This should cover any variances that may be required for asbestos testing and handling. This allowance should also cover any damage that may have worsened between the date of FL’s inspection and the time when repairs commence. The insurer should therefore pay $106,425 for repairs. Insurer should pay for temporary accommodation during repair period The policy extends cover for temporary accommodation: Alternative accommodation for you and your pets If your home building is damaged by an insured event during the period of insurance to such an extent that you can’t live in it, we’ll pay the rental costs for accommodation for you and your pets for the period it reasonably takes, to repair or rebuild your home building. The complainant and his wife M live at the property. It appears the complainant regularly travels overseas. The exchanged information shows M moved into a temporary accommodation in April 2024 after the insurer’s expert(s) determined the home was uninhabitable. The complainant exhausted the 12-month policy limit in April 2025. The insurer extended the temporary accommodation until May 2025. The complainant and M had no choice but to move in with their daughter, after the insurer stopped paying for temporary accommodation. This is not fair. I acknowledge the policy benefit for temporary accommodation is limited to 12 months. However, the complainant would not have required temporary accommodation over the policy limit if the insurer’s initial cash settlement was adequate to complete the repairs to the home. The complainant had no choice but to wait for AFCA to provide an outcome before repairs to the damaged property commenced. The insurer has not indicated the timeframe required to complete the repairs. The complainant has indicated it could take up to six weeks. Given the above and the complainant’s personal circumstances, it is fair the insurer pays six weeks of temporary accommodation costs pursuant to the policy terms and conditions. Insurer liable for storage cost The policy extends cover for the cost of moving and storing contents. TW’s quote included $3,428.73 (with builder’s margin and GST) for packing and storage of contents within the property. The complainant submitted an estimate of $2,833 for the same. Given the reasons above and because FL’s quote does not mention its estimate includes packing and storage of contents, it is fair the insurer pays $2,833 for this benefit. Insurer’s offer to pay DC’s professional fees is fair DC requested the insurer to reimburse his fees. He provided a detailed expense sheet listing his charges for the service provided to the complainant. Given the reasons explained above and below, I am satisfied DC assisted the complainant to advance his position with the claim and this complaint. He provided various submissions and responses in support of the complainant. The insurer’s offer to reimburse DC’s professional fees of $4,510 is fair in the circumstances. Finally, the insurer apologised and acknowledged that its claim handling interfered with the complainant’s enjoyment and peace of mind. It offered to pay $6,300 non-financial loss compensation. I consider this offer to be fair in all the circumstances. 2.2 Why is the outcome fair? The parties are bound by the policy terms and conditions. The insurer is liable for the loss covered under the policy. Its offer to pay non-financial compensation is fair. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 SW’s damage assessment

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.