Home / Suncorp Group / Determination 12-24-144368

Determination 12-24-144368

Cash settlement amount for storm damage (driveway, mould, skylight, internal and contents) and claim mishandling

FirmSuncorp Group
Decided2025-12-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$115,288
Non-financial loss$5,000
Amount claimed—
SourceAFCA PDF

Summary

Complainant's storm damage claim on home and contents policy was accepted but settlement was disputed. AFCA ordered cash settlements for driveway, mould and skylight, a fresh builder quote for internal repairs, contents and accommodation assessment, and $5,000 for non-financial loss.

Fair cash settlement is based on reinstating the original property only without betterment, with the insurer's claims mishandling warranting non-financial loss compensation but not indirect financial loss.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-144368 | Financial firm | AAI Limited Case number: 12-24-144368 28 October 2025 1 Determination overview 1.1 Complaint This complaint relates to a claim by the complainant under her home and contents insurance policy held with the financial firm (insurer), for damage to the insured property caused by storm in April 2024. The insurer accepted the claim for internal damage. While it initially declined cover for the driveway, it later accepted that aspect of the claim. The complainant wants the insurer to pay a cash settlement for the driveway and internal building damage in accordance with her quotes. Additionally, she seeks coverage for temporary accommodation. The complainant also says that the insurer has mismanaged the claim and is seeking compensation for her non-financial loss and indirect financial loss caused by the insurer’s conduct. 1.2 Issues and key findings Is the complainant’s quote a fair and reasonable basis for a cash settlement of the damage to the driveway? Yes. I consider the complainant’s quote for the repair of the driveway is a fair and reasonable basis for a cash settlement. However, I do not consider it fair and reasonable to require the insurer to pay for the optional items detailed in the quote that were not features of the original driveway. Is the complainant’s quote a fair and reasonable basis for a cash settlement of the mould remediation required at the property? Yes. I consider the quote from the complainant‘s expert to be a fair and reasonable basis for a cash settlement. Is the complainant’s quote a fair and reasonable basis for a cash settlement of the damaged skylight? Yes. The complainant’s quote is for the ‘supply and install’ of the skylight. Therefore, the cash settlement should be based on this quote, plus the quote for the skylight shade and flyscreen. Is the complainant’s quote a fair and reasonable basis for a cash settlement of the remaining internal damage at the property? No. There is insufficient information to show the cash settlement amount requested by the complainant reflects the repair costs of the damage. The parties are to work together to determine the repair costs as set out in this determination. Is the complainant’s quote a fair and reasonable basis for a cash settlement of the contents claim? No. The complainant‘s mould remediation quote includes contents remediation and assessment. Once the remediation is completed, the complainant must provide the remediation report to the insurer who is to settle the contents claim in accordance with the terms and conditions of the policy. Is the insurer required to pay temporary accommodation costs? Should the property be uninhabitable during the repairs, the insurer is required to pay the complainant‘s temporary accommodation costs in accordance with the terms and conditions of the policy. Is the insurer required to pay the complainant compensation for non-financial loss? Yes. I am satisfied payment of $5,000 compensation for non-financial loss is warranted in the circumstances. Is the insurer required to pay the complainant compensation for indirect financial loss? No. I am not satisfied payment of compensation for indirect financial loss is warranted in the circumstances. Why is the outcome fair? The outcome is fair in all the circumstances because: · the insurer has accepted the claim for both driveway and internal building damage · the cash settlement for the driveway should only cover reinstatement and should not include optional items · the complainant has provided multiple mould reports to show the extend of the damage, which the insurer has not disputed · the quote from the complainant’s mould expert (MS) is the most reasonable, as it includes strip-out, cleaning, assessment and remediating of contents · it is reasonable and appropriate for an updated internal building repair quote to be obtained given the mould experts identified additional damage · the insurer is only liable for the replacement cost of the original skylight · given the MS quote includes remediation and assessment of the contents, it is not reasonable for the insurer to pay the costs requested by the complainant before MS completes its assessment · it is fair to require the insurer to compensate the complainant for her non-financial loss caused by its mishandling of the claim · it is not fair to require the insurer to compensate the complainant for her indirect losses where its conduct is not the dominate cause of the loss and where the loss is too remote to have been in the insurer’s reasonable contemplation. 1.3 Determination The determination is substantially in favour of the complainant. Should the complainant accept this determination, · within14 days of being notified of her acceptance, the insurer must pay the complainant the following amounts: > $72,685.25 (GST incl) plus 10% uplift in settlement of the claim for damage to the driveway > $30,591 (GST incl) plus 10% uplift in settlement of the claim for mould remediation > $11,210 (GST incl) plus 10% uplift in settlement of the claim for damage to the skylight > $607 for the skylight shade > $195 for the skylights flyscreen > $5,000 compensation for non-financial loss · as soon as practicable after the complainant’s mould expert completes the mould remediation, the insurer is to: > engage a new builder not previously involved in the claim to obtain an actionable quote to complete internal building repair. The builder must consider the mould damage identified by MS when preparing the quote > within 14 days of the receiving the quote, the insurer is required to cash settle the complainant for the quoted amount with a 10% uplift > assess the contents claim in accordance with the terms and conditions of the policy > assess the complainant's entitlement for temporary accommodation in accordance with the terms and conditions of the policy. 2 Reasons for determination 2.1 Is the complainant’s quote a fair and reasonable basis for a cash settlement of the damage to the driveway? Yes. I consider the complainant’s quote for the repair of the driveway is a fair and reasonable basis for a cash settlement. However, I do not consider it fair and reasonable to require the insurer to pay for the optional items detailed in the quote that were not features of the original driveway. Coverage of the policy The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. Insured events include storm, and it is not in dispute that the property was damaged by a storm. The insurer has accepted liability for damage to the inside of the property and the driveway. The parties have not reached an agreement regarding the settlement of the claim. Circumstances of the loss and claim for damage to the driveway The complainant lodged a claim for water damage to the driveway caused by a storm on 4 April 2024. On receipt of the claim the insurer obtained a builder’s report from JL and an engineer’s report from MC regarding the damage. Initially, the insurer determined the damage is due to long-term deterioration and declined the claim. This is because MC considered the proximate cause of the damage was inadequate drainage provisions allowing significant water flow over the driveway causing erosion to the loose road base. The complainant subsequently provided additional information to the insurer, including photographic evidence showing that the driveway had been rebuilt in January 2021. After reviewing these submissions and a supplementary response from MC, the insurer accepted the claim for the driveway. The parties are in dispute regarding a fair and reasonable cash settlement amount for the driveway damage. Complainant says the insurer should cash settle the claim based on her quote The complainant has provided a quote from builder JK for the driveway and has requested a cash settlement based on that quote. The complainant says she is seeking $208,792.65. This is because: · there were errors in MC’s report, and the insurer discarded its findings and accepted the damage · the MC report listed several items that were stated as required to be covered · the complainant is required to rebuild the driveway to the best of their knowledge and ability · the quote was prepared by JK constructions, and the insurer accepted their credentials and quote for an earlier claim in 2020. JK mentioned the quote is for the reinstatement of the driveway and provided a lump sum repair cost of $66,077.50 (GST exclusive). Additionally, the quote also provides the following optional items: · construction of shoulder V drains: $25,650 · installation of stormwater dissipater at the end of V drain: $2,000 · sealing driveway with AC10 asphalt paver (628sqm): $36,738 · concrete the driveway (628sqm): $96,084.00. The itemised quote provided excludes GST. Although the insurer accepted the damage, it did not provide a response to the complainant’s request or make any settlement offer, despite numerous follow-ups. Insurer is not liable for additional items related to the driveway Based on the exchanged information, I am not satisfied that the insurer is liable to pay the amount of $208,792.65 for the driveway repair. Page 76 pf the PDS details how building claims will be settled as follows: When you have a building sum insured and we settle your building claim we will not: … • pay extra to repair or rebuild the building to a better standard, specification or quality than it was before the loss or damage occurred except as stated in the meaning of ‘new for old’ (see page 77) or unless stated otherwise in your policy; ... Page 77 of the PDS describes ’new for old’ as follows: New for old’ means: • rebuild or repair with new items or new materials that are reasonably or readily available at the time of replacement or repair from Australian suppliers; • rebuild or repair regardless of age, with no allowance for depreciation. Same type, standard and specification as when new We will rebuild or repair to the same type, standard and specification (but not brand) to the damaged items as when new. If the same is not reasonably available from an Australian supplier, we will rebuild or repair with items or materials of a similar type, standard and specification when new. We can replace with a different brand. ‘New for old’ does not: ... • mean of a better standard, specification or quality than when new. The complainant referenced MC’s reports and stated that she is required to rebuild the driveway to the best of her knowledge, and that she is obligated under the PDS to incorporate that knowledge into the repair work to ensure future coverage. The MC report is a causation report and focuses on factors such as the age, design, drainage, pavement material (stabilised/stabilised road base), and thickness. I have also reviewed MC’s supplementary report and could not find any recommendations regarding how the driveway should be repaired. The information shows there is drainage in the driveway. Ag pipes were buried in trenches near the retaining wall, as evidenced by a photo provided by MC showing the pipe near the driveway entrance. JK’s base quote for repair of the driveway includes work for drainage swales, pits, and road crossing pipework. This indicates that the base quote for reinstating the driveway includes restoring the existing drainage provisions. Additionally, I have reviewed the photographs provided by both the complainant and MC. In her earlier submission, the complainant confirmed that the driveway pavement consists of cement-stabilised recycled road base. There is no information to show that the driveway has V-drain surface drainage or has been paved with asphalt or concrete, I am not satisfied these items were part of the driveway, and the insurer is not liable to pay for these additional items detailed in the JK quote. Given the above, the insurer is required to pay a cash settlement only for the amount necessary to reinstate the driveway, which has been quoted as $66,077.50 excluding GST. The insurer is to pay $72,685.25 (inclusive of GST), plus a 10% uplift to account for the transfer of risk and the loss of warranty on repairs. 2.2 Is the complainant’s quote a fair and reasonable basis for a cash settlement of the mould remediation required at the property? Yes. I consider the quote from the complainant‘s expert to be a fair and reasonable basis for a cash settlement. Insurer’s experts inspected the mould damage As stated, the insurer engaged its builder, JL to assess the internal damage. On 22 May 2024, JL confirmed the damage was caused by the claimed event and provided a summary of the damage including the following: Staining and mould growth to the plasterboard ceiling linings around skylight in hallway and staining to ceiling and walls within second bedroom. The insurer’s restorer RX attended the property on 6 June 2024 to assess the mould damage. RX reported the following: · mould growth was observed on the ceiling, walls, and door · the complainant advised that they believe water was entering through the skylight in the hallway · moisture readings indicated levels within benchmark, so no drying equipment was installed · two air scrubbers were installed, and HEPA filtration was implemented to capture mould spores in the affected areas. The information shows the insurer received a quote of $32,806.88 from JL for the repair but it considered the amount to be excessive and requested a dual assessment. The dual assessment was carried out on 11 October 2024 with JL, the internal assessor (AC) and the complainant. JL noted a worsening of the mould staining, and their report includes photographs of mould damage to the building including contents. JL recommended treatment of the surface mould by its restorer RX. AC confirmed the contents have mould damage and determined a hole needed to be cut in the bedroom for further assessment to the cavity. AC stated: Assessor reassured the customer that when the plasterer and the restoration team attend they will be attending on the same day. After their assessment they will provide us with a report advising us of what is happening in the ceiling cavity and walls. From there JL will be able to provide us with a thorough scope of works and once approved repairs can commence. Assessor has also requested that when restoration attend they treat the visible mould as a make safe in the bedroom and hallway, cupboards and doors. The insurer’s restorer, RX re attended the property on 16 October 2024 and reported: · water leaked through the roof a few months ago and the insured has had the roof repaired · as a result of the incident mould has formed on the structure · water has also entered through the sky light causing bubbling and water staining to the ceiling · a temporary mould make-safe was completed, including sanitising, installing air scrubbing equipment, and setting up plastic containment · inspection holes were cut as requested and no moisture was found in the cavity · inspection holes were sealed with plastic and doorway containment was installed to the bedroom. The insurer subsequently approved two quotes from JL to repair the property. One quote was for mould remediation, including strip-out work, totalling $12,894.08 and the other was for internal repairs, totalling $18,624.06. The complainant says RX did not conduct mould remediation during its visit on 16 October 2024. In November 2024, the insurer requested a hygienist to attend the property for assessment, but this was declined as the complainant confirmed with the hygienist that temporary surface mould remediation should be done before mould testing. The insurer subsequently cancelled the mould testing. RX re attended the property on 25 November 2024 on the request of the complainant to complete surface clean. RX noted: · the complainant requested a surface clean only as she declined the provision of the SOW until reinstatement works are confirmed · skylight has visible mould however, unable to complete the surface clean as it’s inaccessible · mould affected contents are also present in the affected areas · it completed a surface clean of the hallway and bedroom · air scrubbers remain onsite. As the complainant continued to dispute the extent of the water and mould damage, the insurer engaged a hygienist, NM, to conduct a mould assessment and provide a SOW and recommendations to achieve post-remediation verification (PRV) on 8 March 2025. However, the complainant considered this approach inappropriate, stating that remediation work should be completed before testing for PRV clearance. In March 2025, the insurer requested another dual assessment for the mould-related building and contents damage. The information indicates that the complainant expressed discomfort with this request, stating that the matter could be resolved based on previous assessments conducted by the insurer. Furthermore, she stated that the dual assessment could not be scheduled due to the internal assessor’s availability. It was not until AFCA progressed the case to determination that the insurer booked a dual assessment with its internal assessor. Given the delay, the complainant considers that the insurer missed the opportunity to conduct a timely dual assessment. Complainant provided her own quotes and mould summary report The complainant says the insurer’s restorer did not treat the mould and the dual assessment on 11 October 2024 confirmed this. The complainant is seeking $30,591.00 for mould remediation as quoted by her mould expert, MS. The complainant says: · the make-safe work has not been completed, and the SOW for the make-safe remains outstanding · the insurer was granted access to assess the internal damage on more than 16 occasions · the complainant was advised that another site assessment is required. However, the insurer’s claims team has repeatedly stated that its assessor is unavailable · the SOW prepared was mutually agreed upon, and there is no valid reason why settlement has not occurred · the insurer’s SOW did not include remediation of the investigation holes · the insurer instructed the complainant to obtain her own quotes, which fall within the guidelines and parameters set by the insurer · the complainant has undertaken extensive non-claim-related works totalling over $3,500. The complainant provided three mould experts’ (MD, MC and MS) reports to support her claim. MC and MD conducted visual inspections and provided summary of the damage. Both considered the mould damage was caused by water leaking into the property and elevated moisture levels creating ideal conditions for mould to thrive and spread throughout the property. Both MC and MD provided photographs showing mould visible in all bedrooms, office, study, kitchen, dining, lounge, family hallways, entry and pantry. The reports also show visible mould on contents. The executive summary from MS states: Based on the site assessment, [MS] recommends that remediation works be conducted at the premises to return the internal environment to “Normal Mould Ecology”. [MS] also recommends that, prior to the commencement of any remediation works, all excess/elevated moisture and water leak issues are identified and rectified. It is fair for the insurer to pay cash settlement in accordance with the MS quote Based on the exchanged information, I am satisfied that the amount of $30,591 quoted by MS for mould remediation is a fair and reasonable basis for a cash settlement. The insurer’s builder JL and restorer RX attended the property in May, June, and October 2024. JL’s reports are a short summary and mainly consist of photographs showing mould and staining to the hallway and second bedroom. JL did not assess the contents. RX reported in June 2024 that the complainant advised them that the water was entering through the skylight but there is no further inspection or other action at the time. During the dual inspection with JL, RX, and the insurer’s internal assessor in October 2024, JL observed that the damage had worsened, with staining becoming more pronounced. This suggests RX did not perform surface remediation, and the lack of surface cleaning contributed to the deterioration. While the insurer’s assessor requested an inspection hole to be cut, the information shows that no further inspection was conducted beyond moisture testing. The insurer subsequently approved mould remediation, including strip-out works for the hallway and one bedroom. Given that the insurer did not carry out additional inspections beyond moisture testing, and later approved the mould remediation with strip out, I am not persuaded that such inspection was necessary. I note JL had inspected the property four times, including a dual inspection with the insurer’s internal assessor. The restorer, RX, also attended the property three times before approving the SOW for mould remediation. I acknowledge the insurer attempted to send its own hygienists to inspect the damage, however this occurred six months after the claim was lodged, at which point the mould cleaning had not been completed. This caused confusion, as the complainant had been informed that PRV testing should be conducted after surface mould remediation is completed, which did not occur. Regarding the request for another mould test, the complainant confirmed that this was also delayed due to the availability of the insurer’s internal assessor. The insurer does not dispute this. The complainant has provided multiple mould reports indicating that the mould damage extends to other rooms and contents. The insurer also did not respond to these despite numerous follow-ups. Based on the complainant’s mould reports and photographs, I am satisfied she has established, on balance, that the mould damage is more extensive than what was observed by JL, RX and the insurer’s internal assessor. Accordingly, I consider the complainant’s quote from MS to remediate the mould damage to be a fair and reasonable basis for a cash settlement for this damage. Given the above, the insurer must pay the amount of $30,591 for mould remediation, plus a 10% uplift to account for the transfer of risk and the loss of warranty on repairs 2.3 Is the complainant’s quote a fair and reasonable basis for a cash settlement of the damaged skylight? Yes. The complainant’s quote is for the ‘supply and install’ of the skylight. Therefore, the cash settlement should be based on this quote, plus the quote for the skylight shade and flyscreen. The parties disagree about the cost of the skylight repair As part of its assessment for the skylight damage, the insurer’s builder, JL, reattended the property and provided a variation report, which was received by the insurer on 3 January 2025. JL’s report stated that the skylight was not working but did not identify the cause of the damage. The insurer then engaged another expert, WG, to provide an electrical report. The report from WG, dated 30 January 2025, states: VELUX electric skylight has failed, due to water ingress in the motor. The motor has failed and is not repairable by us. VELUX model number VCS3046. No model number could be found on product, Checked measurements of unit and located matching VELUX model on VELUX website. Throat measurements are 875x1275. Photos attached. Unit requires replacement The information shows that the insurer subsequently accepted the skylight damage conditionally, based on the quoted amount of $7,993.07 provided by JL. However, the insurer applied a variation by removing supervision costs from the scope of works and reclassifying them as management costs, excluding the 16% margin that had been included. The complainant says the insurer has refused to include the replacement of the damaged bushfire-compliant skylight with an identical model. Instead, the insurer quoted a replacement for a non-compliant skylight with a lower-specification version, which the complainant considers incorrect. She has provided her own quote from her builder, TM to replace the skylight. TM quoted: · $6,600 for removing, supplying and installing new skylight with light block shade and flyscreen supplied by the complaint · $3,350 for patching the inspection openings and Gyprock near the skylight which including painting and scaffolding access to the skylight · $1,260 for supervision and consultation. The complainant also provided a separate quote for the costs of replacing the skylight ($2,679), shade ($551.82) and flyscreen ($177.27). Insurer should pay cash settlement to reinstate the existing skylight only Based on the available information I consider that the insurer should pay the amount quoted by the complainant, excluding the item relating to the replacement of the skylight itself. This is because the complainant’s builder, TM, has already included the supply of the skylight in their quote. Should the complainant accept this determination, within 14 days of being notified of her acceptance, the insurer is to pay the complainant · $11,210 (inclusive of GST) to replace the skylight, plus 10% uplift to account for the transfer of risk and the loss of warranty on repair · $607 for the skylight shade · $195 for the flyscreen. 2.4 Is the complainant’s quote a fair and reasonable basis for a cash settlement of the remaining internal damage at the property? No. There is insufficient information to show the cash settlement amount requested by the complainant reflects the repair costs of the damage. The parties are to work together to determine the repair costs as set out in this determination. Insufficient information to determine the appropriate cash settlement amount The complainant says the insurer should accept the quoted amount mentioned in the insurer’s internal assessor’s report dated 23 August 2024. This is because the quote was prepared following extensive input from JL’s estimator, roof assessor, and the complainant’s builder during an on-site assessment. I have reviewed the insurer’s internal assessment report. It noted receipt of a quote from JL for $32,806.88 for repairs. However, the insurer’s internal assessor considered the amount excessive. The report stated that the scoped pricing was inaccurate and that “the mould and staining to the wall [were] minor and would not require strip-out.” Based on the material exchanged, I am of the view that there is insufficient information to determine an appropriate cash settlement amount for the internal damage at the property. This is particularly the case given that additional mould damage was identified by the complainant’s mould experts after the insurer’s builder had submitted its quote. Parties are to work together to obtain a new quote Given there is insufficient information regarding the cost of the internal repairs, the parties must work together to obtain a new quote for these repairs after the mould remediation is completed. Should the complainant accept this determination, the insurer is to: · as soon as practicable after the complainant’s mould expert MS completes the mould remediation, engage a new builder not previously involved in the claim to obtain an actionable quote to complete internal building repairs. The builder must consider the mould damage identified by MS when preparing the quote. · within 14 days of the receiving the quote, cash settle the complainant for the quoted amount plus a 10% uplift for transfer of risk and loss of warranty on repairs. Should the parties disagree regarding the insurer’s liability for the claim related internal repairs the complainant can make a further complaint to AFCA. 2.5 Is the complainant’s quote a fair and reasonable basis for a cash settlement of the contents claim? No. The complainant‘s mould remediation quote includes contents remediation and assessment. Once the remediation is completed, the complainant must provide the remediation report to the insurer who is to settle the contents claim in accordance with the terms and conditions of the policy. The MS quote includes mould remediation of content and assessment The complainant has provided her list of quotes for mould remediation and replacement for her contents. I accept the contents have mould damage as this was reported by RX, the insurer’s assessor during the dual assessment in October 2024 and the complainant’s mould experts. However, considering MS’s quote included remediation and assessment of the contents, I do not consider it fair for the insurer to simply pay the costs as quoted by the complainant without further input by the mould expert, MS. Insurer is to consider MS’s assessment report fairly and pay cash settlement I consider it is reasonable for MS to complete the remediation and assessment of the contents before the insurer considers a cash settlement. Once the MS contents report is received, the complainant is to provide it to the insurer within 14 days, along with information to demonstrate the replacement values are like-for-like, for the insurer to consider. The insurer must consider this fairly and pay replacement costs for contents that cannot be treated through mould remediation. Should the parties disagree regarding the insurer’s liability for the contents benefit the complainant can make a further complaint to AFCA. 2.6 Is the insurer required to pay temporary accommodation costs? Should the property be uninhabitable during the repairs, the insurer is required to pay the complainant‘s temporary accommodation costs in accordance with the terms and conditions of the policy. Complainant likely to require temporary accommodation I accept the damage was caused by the storm event and mould damage is extensive and temporary accommodation will likely be required. The insurer has agreed that it will review the accommodation quotes from the complainant to arrange settlement. While the complainant provided links to properties for temporary accommodation, she also confirmed the properties are no longer available. Should the complainant accept this determination, as soon as practicable after receiving the reports regarding mould remediation and the internal repairs, the insurer is to assess the complainant's entitlement for temporary accommodation in accordance with the terms and conditions of the policy. Should the parties disagree regarding the insurer’s liability for the temporary accommodation benefit the complainant can make a further complaint to AFCA. 2.7 Is the complainant entitled to compensation for non-financial loss? Yes. I consider payment of $5,000 compensation is warranted in the circumstances. AFCA may award compensation in certain circumstances Under section D.3 of the AFCA Rules, we may award the complainant compensation for non-financial loss capped at $6,300 where the insurer’s actions have caused an unusual amount of: · physical inconvenience · time taken to resolve the situation · interference with the complainant’s expectation of enjoyment or peace of mind. In deciding whether to award compensation, AFCA expects complainants to be moderately robust, to bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to manage the situation. I am not satisfied, on balance, the facts give rise to two claims for compensation The complainant says the driveway damage and the internal damage should be treated separately for the purpose of her claim for compensation for non-financial loss. She says the insurer has treated the claims separately for the purposes of explaining the differences in the two complaints and service handling issues. I am not satisfied the issues in dispute give rise to two claims for compensation for non-financial loss. This complaint is, in part, about the handling of the claim. Claims handling encompasses the various things including but not limited to communication, delay, quality of assessment reports and make safe works. While there were different parts of the property damaged by the storm necessitating different assessment by different experts, the ongoing discussions and communications between the insurer and the complainant were occurring at the same time, even though at times they were related to the driveway damage and at times the internal damage. I consider the claims handling as a whole constitutes a set of events and facts that together lead to the losses, and it is appropriate to treat the claims handling as one claim for compensation for non-financial loss. Complainant and her family endured delay, stress, frustration and inconvenience Based on the exchanged information, I am satisfied that the insurer’s assessment of the claim caused a high degree of stress, frustration, and inconvenience. This is because: · the insurer’s builder, JL, provided reports that were brief and generic in nature, describing only visual observations and failing to address issues such as the cause of damage · the insurer continued to engage JL for additional assessments, despite its own assessors expressing dissatisfaction with JL’s reports · further reports from the insurer’s other experts confirmed mould damage, the need for strip-out works, and skylight replacement, supporting the complainant’s position · reports from the complainant’s mould experts show that the insurer’s internal assessor and its expert did not consider damage to other areas of the property or the contents · the restorer, RX, did not complete temporary surface mould cleaning until 25 November 2025, six months after the claim was lodged leaving the complainant and her family living in the mouldy property · the insurer delayed in settling the claim for the driveway damage after it accepted liability · the insurer did not respond to the complainant’s mould reports or quotes, which further delayed the claim · the insurer communicated poorly with the complainant. The complainant says she has been extremely anxious throughout the claims process. She also says she has had to postpone important appointments and has been unable to enjoy her home with her family due to the delays, particularly regarding the mould remediation. I accept the above actions of the insurer delayed resolution of the claim and caused undue stress, upset and disruption to the complainant and her family. I consider payment of compensation for non-financial loss is warranted in the circumstances. Should the complainant accept this determination, the insurer is to pay to the complainant the $5,000 compensation for her non-financial loss. 2.8 Is the insurer required to pay the complainant compensation for indirect financial loss? No. I am not satisfied payment of compensation for indirect financial loss is warranted in the circumstances. AFCA can award compensation for indirect financial loss Under section D.4 of the AFCA Rules we can award compensation for indirect financial loss capped at $6,300 per claim. These are financial losses that are indirectly the result of a financial firm's misconduct. The complainant is seeking compensation for the following indirect financial losses: · damage to her three cars caused by driving along the damaged driveway · interest cost on her home loan due to being unable to refinance to a more favourable product because of the lack of clarity about the status of the claim. I am satisfied the policy does not cover these costs. While I agree the insurer mishandled the claim, I do not consider payment for compensation for indirect financial loss is warranted in the circumstances. I accept the complainant may have damaged her car while using the driveway, however I consider the dominant cause of this damage is the state of the driveway due to the storm damage it sustained. I consider the loss related to the additional interest paid to be too remote, in other words this loss is not sufficiently related to the poor claims handling, and it would be unfair to require the insurer to compensate the complainant for this loss. 2.9 Why is the outcome fair? The outcome is fair in all the circumstances because: · the insurer has accepted the claim for both driveway and internal building damage · the cash settlement for the driveway should only cover reinstatement and should not include optional items · the complainant has provided multiple mould reports to show the extend of the damage, which the insurer has not disputed · the quote from the complainant’s mould expert (MS) is the most reasonable, as it includes strip-out, cleaning, assessment and remediating of contents · it is reasonable and appropriate for an updated internal building repair quote to be obtained given the mould experts identified additional damage · the insurer is only liable for the replacement cost of the original skylight · given the MS quote includes remediation and assessment of the contents, it is not reasonable for the insurer to pay the costs requested by the complainant before MS complete its assessment · it is fair to require the insurer to compensate the complainant for her non-financial loss caused by its mishandling of the claim · It is not fair to require the insurer to compensate the complainant for her indirect losses where its conduct is not the dominate cause of the loss and where the loss is too remote to have been in the insurer’s reasonable contemplation. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.