Home / RACQ / Determination 12-24-144056
Determination 12-24-144056
Insurer declined cover for roof and skylight replacement after storm, saying damage was from wear and tear and gradual deterioration
Summary
The complainant claimed for roof and skylight replacement after a storm; the insurer covered resultant internal damage and lost rent but declined the roof. AFCA found in favour of the insurer.
The complainant did not establish a claimable loss, as the proximate cause was gradual deterioration and wear and tear, which are excluded under the policy.
Issues
- Claim denial primary · not upheld“proximate cause of the disputed damage is gradual deterioration and wear and tear. Therefore, the insurer is entitled to decline the claim.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
Text of the determination
Determination
|
Case number
|
12-24-144056
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-24-144056 12 June 2025
Determination overview
Complaint
The complainant held a landlord house and contents insurance policy with the financial firm (insurer). On 24 May 2024, he lodged a claim for damage to the property following a storm.
The insurer agreed to cover the resultant damage and loss of rent for the estimated period of the repairs. However, the insurer declined cover for the roof and the skylights as it says they were not damaged by the insured event (disputed damage).
The complainant disagrees and says that the insurer should cover the disputed damage.
Issues and key findings
Should the insurer cover the disputed damage?
No. The complainant has not established a claimable loss in relation to the disputed damage. On balance, the proximate cause of the disputed damage is gradual deterioration and wear and tear. Therefore, the insurer is entitled to decline the claim.
Why is the outcome fair?
I am not satisfied the complainant has established a claimable loss under the policy for the disputed damage. It would not be fair in the circumstances to require the insurer to cover the disputed damage
Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to this complaint.
Reasons for determination
Should the insurer cover the disputed damage?
No. The complainant has not established a claimable loss in relation to the disputed damage. On balance, the proximate cause of the disputed damage is gradual deterioration and wear and tear. Therefore, the insurer is entitled to decline the claim.
Onus on complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainant must prove the loss or damage was caused by a risk that is covered under the policy.
Once the complainant proves there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies.
Policy covers insured events subject to exclusions
The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by an insured event, and not subject to an exclusion, is covered. The insured events are set out in the PDS and include storm. However, the policy contains the following general exclusions:
Rust and mould
You are not covered for…Rust, corrosion, rot, mould or gradual deterioration. (But we will cover mould damage to your rental property or your contents that happens within 21 days of the first loss or damage caused by the insured events of storm, storm surge, flood/water runoff, tsunami, or leaks)…
Wear and tear
You are not covered for…Loss or damage caused by wear and tear through normal use.
Complainant says the disputed damage was caused by the storm
The complainant says:
the property is single storey with an asbestos roof and is tenanted;
after a severe storm and heavy rain the property began to leak on or about 16 May 2024;
water entered via numerous openings and was seeping through the laundry room, the main room and other areas of the property;
he lodged a claim with the insurer but they rejected it. They later agreed to cover the internal resultant damage but nothing else;
the tenant left the property due to the severe mildew caused by the storm event; and
he has replaced the roof and seeks that the insurer reimburse him for this cost.
The complainant obtained a quote from a roofer, SQ, dated 3 June 2024, for $32,340. The quote covers the cost of a new colorbond roof, roof insulation, all necessary flashings, fixtures and fittings and three new skylights.
SQ provided a report dated 18 September 2025 after the work was completed. It says:
The owner called us to fix the leak when it began, but we are not permitted to do so on asbestos. We advise the owner to purchase waterproofing supplies. The homeowner calls us once a month to get a quote for roof replacement. After inspecting the roof, we discovered that silicon and water-proof paint were applied in numerous areas. Still was suffering from serious leaks, which made quick action necessary. Our team…undertook a comprehensive reroofing of the property to address these issues effectively. The work involved replacing the existing roofing materials with high-quality alternatives to ensure durability and prevent future leaks. The new skylights have been installed with proper sealing/flashing to enhance their performance and longevity.
Insurer says storm was not the cause of the disputed damage
The insurer appointed a builder, AJ to attend the property. AJ engaged a roofer, EP, to assess the damage. EP says:
the roof overall is in poor condition with signs of aging, wear and tear;
the roof was found with overlapping joints to make the length and has been sealed with silicone over time as an attempt to stop leaks;
there are loose screws due to old age which have been patched with silicone;
the skylights are deteriorated and aging;
areas of the sheets were chipped in corners due to old age;
the water ingress is due to aging, wear and tear of the asbestos roof, sheets overlapping joints and loose silicone-patched screws. The damage is not storm related; and
a complete replacement of the roof is required.
AJ says that due to the age and dilapidated state of the asbestos roof, it is unable to warrant any internal repairs. It also says it spoke with the tenant when it carried out an inspection of the property on 28 May 2025. She said:
there have been multiple leaks throughout the residence over 8-10 weeks;
the first leak was detected around the skylights approximately six weeks ago and has been experiencing ongoing water ingress;
the second leak was in the laundry area and occurred approximately five weeks before the inspection; and
the third leak occurred 2-3 weeks prior to the inspection resulting in water staining on the plasterboard ceiling in the living area. There is also some surface mould in the area.
Proximate cause of the disputed damage must be established
In order to determine whether the claim should be covered, it is necessary to establish, on the balance of probabilities, the proximate cause of the loss.
The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances.
If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause.
Available information does not show disputed damage due to storm
Having reviewed all the available information, I am not satisfied the complainant has established a claimable loss in relation to the disputed damage.
I am persuaded by EP’s report that the cause of the water ingress is due to long term wear and tear and gradual deterioration of the asbestos roof sheeting and the skylights. I also accept EP’s views, which is confirmed by the photographic evidence, that there are overlapping joints and loose silicone-patched which have caused or contributed to the water ingress.
I acknowledge the complainant’s submission that there was a significant weather event on or about 16 May 2024. However, based on the information available, I cannot be satisfied that the storm caused the disputed damage, that there was a storm created opening or that the water ingress is as a result of the insured event.
Further, the report from the complainant’s roofer also says that the complainant contacted them when the leaks began and they recommended the use of waterproofing products. Despite the silicone and waterproof paint, there were still ‘serious leaks’. As a result, a total roof replacement was undertaken.
I consider that both the insurer’s and the complainant’s expert reports agree that the leaks were present for some time. Therefore, the disputed damage and the water ingress has not been caused by a single insured event. On balance, I consider the disputed damage has occurred gradually over time, thus resulting in water ingress. Therefore, even if a claimable loss had been established, the rust and mould and wear and tear general exclusions in the policy would apply to exclude the claim.
On balance, I consider the proximate cause of the disputed damage is the gradual deterioration and wear and tear of the roof and skylights. Accordingly, the insurer is entitled to decline the claim.
Insurer not required to take any further action in relation to resultant damage
The insurer accepted the complainant’s claim for internal resultant damage and paid the complainant a cash settlement for the repairs and loss of rent for the time required to carry out the repairs.
The complainant has not referred to any outstanding issues in relation to the resultant damage in the AFCA complaint lodged on 19 September 2024.
Nevertheless, I note the complainant raised further concerns in relation to resultant damage around the time the cash settlement was paid. The insurer arranged for AJ to inspect the premises again on 4 September 2024. AJ says no further damage attributable to the storm event was identified. On 2 October, the insurer also emailed the complainant to advise him of the result of the AJ inspection. The insurer asked the complainant if he had obtained his own quote for the further internal damage he was claiming for or, alternatively, to clarify the amount he was seeking to resolve the complaint (including how the complainant reached this figure). No further information was received from the complainant.
In the circumstances, there is insufficient information available in relation to the resultant damage to identify if there is anything in dispute or the extent of the dispute. Should the complainant have any further queries in relation to the resultant damage, he should provide the information requested on 2 October 2024 to the insurer and await their claim response.
Why is the outcome fair?
I am not satisfied the complainant has established a claimable loss under the policy for the disputed damage. It would not be fair in the circumstances to require the insurer to cover the disputed damage.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.