Text of the determination
Determination
|
Case number
|
12-24-141569
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-24-141569 23 July 2025
1 Determination overview
1.1 Complaint
The complainant holds a business pack insurance policy (policy) with the financial firm (insurer). On 8 September 2020, she lodged a claim for roof damage from a hailstorm on 19 April 2020. The insurer accepted the claim and issued a cash settlement based on a scope of works (SOW) and a quote from her preferred builder, AC.
Later, the complainant submitted a variation SOW from AC, requesting additional funds for increasing the roof pitch and for items omitted from the original SOW. The insurer agreed to cover the omitted items. However, it rejected the rest, stating the additional work was unnecessary.
The complainant disputes this and seeks a further cash settlement, plus $2,500 compensation for non-financial loss (NFL) due to delays
A representative is assisting the complainant. Any reference within this determination to the complainant includes the representative unless otherwise stated.
1.2 Issues and key findings
Has the complainant established a valid claim for the disputed items?
No. This because the exchanged information shows the complainant has not established, on the balance of probabilities (that is more likely than not), the disputed items are required to return the property to its pre-loss condition.
Is the complainant entitled to NFL?
No. The exchanged information shows the insurer did not unnecessarily delay assessing the variation.
Why is the outcome fair?
The outcome is fair because the complainant has not established, on balance, the disputed items are required to return its property to its pre-loss condition. It would be unfair to require the insurer to accept this aspect of the claim.
The insurer did not unnecessarily delay assessing the variation. It would be unfair to require the insurer to pay NFL in this instance.
1.3 Determination
This determination is in favour of the insurer. Other than detailed in section 2.1 below, the insurer is not required to take any further action in relation to the variation. It is not required to pay NFL.
2 Reasons for determination
2.1 Has the complainant established a valid claim for the disputed items?
No. This because the exchanged information shows the complainant has not established, on balance, the disputed items are required to return the property to its pre-loss condition.
Complainant has onus to establish a valid claim
It is accepted insurance law that the complainant carries the initial onus to establish, on balance, a loss which is covered by the terms and conditions of the policy.
Only if the complainant can do this, will the onus shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
Policy covers accidental damage
The complainant holds a business pack policy with the insurer for the period 27 September 2019 to 27 September 2020. The policy covers accidental damage to the property at the insured premises during the period of insurance.
The parties agree the:
· roof is hail damaged
· complainant has established a claimable loss.
The dispute is about if the items in dispute are required to return the property to its pre-loss condition.
Policy cover is subject to terms and conditions
Under the terms of the policy, the insurer will:
· pay the cost to rebuild, replace, or repair damaged property to its original condition when new
· repairs will use readily available, commonly used materials in Australia and will not improve or extend the property beyond its original condition.
There is no dispute among the parties the complainant received a copy of the policy documents. The insurer is therefore entitled to rely on the terms of the policy in assessing the claim.
Insurer cash settled the claim
Upon claim lodgement, the insurer appointed a loss adjuster (YD), who engaged AB to inspect the roof. AB attended on 9 September 2020 with the complainant present. No hail damage was found, except minor damage to a letterbox (within the $250 excess). The claim was closed on 26 October 2020.
On 23 March 2023, the complainant’s representative requested the claim be reopened, stating AB’s report relied only on drone images and did not reflect actual roof area.
The complainant submitted a report, SOW, and quote from her preferred builder AC, identifying:
· significant storm damage to the main roof
· hail damage to approximately 50% of roof linings and flashings
· hail indentations visible in photos
AC’s quote: $34,149.78 (excl. GST) is for replacement of:
· roof sheeting
· battens
· tie downs
· three skylights
· apron flashings
The insurer appointed a building consultant (KM) to verify the damage. KM recommended full roof replacement due to widespread hail dents, to maintain warranties and uniform appearance. The complainant requested a cash settlement.
A comparable quote confirmed ACs was competitive. As the property is commercial, the insurer paid a cash settlement of $33,473 (AC’s quote minus builder’s warranty premium, margin, excess, and GST) on 27 September 2023.
The file notes:
· variations may apply if sarking or insulation is damaged during roof removal
· the complainant’s representative was advised to notify the insurer of any variations
· claim closed on 29 September 2023
Variation for framing requirement
AC conducted a further assessment on 21 November 2023. It identified additional works needed to restore the property to pre-loss condition. Key variations included:
· roof pitch below 1° required significant adjustment
· no allowance for material delivery
· upgrade from 0.42 to 0.48BMT Kliplok due to pitch change
· fascia replacement due to increased roof height
· missing allowances for dry pan flashing and skylight.
These changes resulted in a revised scope of works totalling $31,754.
On 17 July 2024, the complainant submitted an amended variation for $30,262, reflecting the removal of three duplicate skylights already included in the original quote.
Insurer rejects most of variation
Upon receiving the variation, the insurer engaged YD to assess the claim. YD sought further details from the complainant to review the variation. However, her response lacked sufficient information.
As a result, YD arranged for KM to revisit the property on 31 May 2024 and provide a supplementary report. KM found:
· the existing roof sheeting resembles Lysaght Klip-Lok 406. However, it lacks manufacturer markings and was screw-fixed, suggesting it may be an imitation product
· the roof pitch is consistently 1°, so no adjustment is needed. Metroll Metlok Cyclonic 680 is a suitable alternative
· the roof is trussed, not hand pitched. Existing tie-downs are adequate; no upgrades are required
· no extra materials are needed, making transport costs unjustified.
However, KM acknowledged that some necessary items (site clean, parapet capping replacement, and additional roof sheeting) were omitted from the original SOW. It concluded these works, quoted at $2,920, were the only substantiated variation required.
The insurer’s offer to pay this amount was rejected by the complainant.
Complainant disputes denial
The complainant disputes the insurer’s denial. On 29 April 2025, she submitted an amended variation that she says aligns with the findings of KM. This is because:
· it addresses all compliance issues identified, including the use of 0.48BMT Kliplok roofing, tie-down upgrades, and flashing/capping replacement
· the revised SOW removes previously unsupported items and includes only works necessary to meet relevant Australian Standards, including AS1684 and the relevant guidelines for sheet metal roof repairs in cyclonic areas.
Insurer rejects amended variation
The insurer says the complainant’s claim that her revised variation reflects KM’s recommendations is incorrect. The additional items remain excessive, unnecessary, and inconsistent with KM’s findings.
It says:
· site clean-up (over 500 m²): already included in the original settlement
· material transport and hire: previously linked to roof pitch changes, which are no longer required. This cost is now unnecessary
· scaffolding and edge protection: original quote includes sufficient edge protection (50LM). Additional edge protection is unjustified per KM and YD
· KlipLok Roof Sheeting (0.48BMT): required for compliance. Insurer has offered an extra $390. The complainant has not substantiated the claimed $24.67/m² cost difference.
· parapet capping replacement: already included in the original settlement
· dry pan flashings (A/C units and skylights): deemed unnecessary by KM due to small penetrations
· large tie-down for pitched roof: assessed as excessive and not required beyond original allowance.
Variation further amended
The complainant made further amendments to the variation on 2 July 2025. The insurer has reviewed the variation and notes it still includes additional costs already rejected. Furthermore, while some of the items have been removed, it is clear the complainant intends to request these costs again via further variations.
Based on the information already exchanged, the insurer says its offer to pay a further $2,920 is fair and represents the only additional cost that should be considered.
On balance, insurer’s offer is reasonable
Both YD and KM conclude that AC’s proposed variation is unnecessary to restore the complainant’s roof.
I find KM’s detailed on-site engineering report persuasive. This is because it addresses each item in the variation, explaining why the additional works are either unnecessary or already covered in the initial settlement.
The report includes technical justifications and references to building standards, such as the rationale for excluding pan flashing.
In contrast, the building certifier’s report prepared by PB relied on by the complainant is based on a video call, lacks a clear methodology, and does not confirm the necessity of the works. PB only recommended an engineer visit the site.
In addition. the insurer provided multiple roof images showing a consistent pitch of at least 1 degree. The complainant submitted a single image showing sagging in one section, which does not demonstrate that the entire roof fails to meet pitch requirements.
Based on this, I am not satisfied the complainant has shown the variation works are necessary to meet building standards or restore the roof to its pre-event condition.
The insurer also addressed the complainant’s concerns about omissions in the original scope. Following review, it acknowledged errors such as the exclusion of site clean-up and parapet capping.
I am satisfied, on balance, the insurer’s offer of an additional $2,920 based on the complainant’s builder’s costings and market rates for roof sheeting is fair in all the circumstances.
Within 14 days or receiving notification the complainant accepts this determination the insurer must pay the complainant $2,920 in full and final settlement of the claim.
2.2 Is the complainant entitled NFL?
No. The exchanged information shows the insurer did not unnecessarily delay assessing the variation.
AFCA’s approach to NFL
Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if the loss was partially caused by the actions of the complainant, or by factors outside the insurer’s control.
Compensation for NFL not warranted
The complainant says she is entitled to $2,500 NFL because the insurer caused unnecessary delays assessing the variation. I am not satisfied this occurred.
This is because the exchanged material shows the insurer has shown it did not cause unreasonable delays in handling the variation claim. Its timeline and supporting documents indicate that key delays (specifically from 21 December 2023 to 9 February 2024 and 27 March to 8 May 2024) were due to inaction by the complainant and AC, including failure to coordinate inspections with YD and KM.
Based on the clear timeline and correspondence, I am satisfied the insurer responded appropriately and in a timely manner. There is no information to show the claim handling was unreasonable or it caused the complainant undue stress or inconvenience.
The insurer is not required to pay NFL.
2.3 Why is the outcome fair?
The outcome is fair because the complainant has not established, on balance, the disputed items are required to return its property to its pre-loss condition. It would be unfair to require the insurer to accept this aspect of the claim.
The insurer did not unnecessarily delay assessing the variation. It would be unfair to require the insurer to pay NFL in this instance.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.