Determination
|
Case number
|
12-24-139710
|
Financial firm
|
XL Insurance Company Se
Case number: 12-24-139710 8 December 2025
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a residential strata insurance policy issued by the financial firm (insurer) to the owners’ corporation of the building in which he owns a unit (unit). In May 2023, a claim was lodged for water damage to the unit due to a blocked drain on a neighbouring property overflowing during a storm event.
The insurer partially accepted the claim. It attended to some repairs, paid cash settlement amounts, and covered some loss of rent (LOR). However, it says part of the damage is from excluded causes, including gradual deterioration, wear and tear, and lack of maintenance.
The complainant is dissatisfied with the insurer’s claim assessment and handling. He also says the insurer’s trades caused additional damage. The complainant seeks payment of additional repair costs and LOR, provision of compliance certificates, and compensation for indirect financial loss and non-financial loss.
1.2 Issues and key findings
Is the insurer required to pay more for repairs?
Yes. The insurer is to pay the complainant $1,522.49 for missing kitchen cabinetry and is to assess the complainant’s concerns about the hot water system (HWS).
Is additional LOR payable?
No. The mould and moisture in the kitchen, bathroom and ensuite meant that the work AC undertook without authorisation would likely have been required anyway. This means the unit would have been unfit due non claim related damage in any event.
Is indirect financial loss compensation payable?
No. The policy excludes indirect financial loss. Based on the exchanged information, I am otherwise not satisfied the insurer should pay indirect financial loss outside the policy terms.
Is non-financial loss compensation payable?
Yes. The insurer’s poor claim handling and delays unreasonably caused the complainant major stress and inconvenience. It is to pay him $3,500 in non-financial loss compensation.
Why is the outcome fair?
The outcome fairly reflects the policy response to the claim and the insurer’s claim handling.
1.3 Determination
This determination is partially in favour of the complainant. If the complainant accepts the determination, the insurer must:
· take the steps outlined in section 2.1 below
· within 14 days, pay the complainant $3,500 in non-financial loss compensation.
2 Reasons for determination
The parties have submitted a large volume of information to AFCA. While this determination does not refer to all the material provided by the parties, I have considered everything in reaching my decision.
2.1 Is the insurer required pay more for repairs?
Yes. The insurer is to pay the complainant $1,522.49 for missing kitchen cabinetry and is to assess the complainant’s concerns about the HWS.
Complainant is required to show a claimable loss under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than not), that he suffered a loss claimable under the policy. This means he must show the loss was caused by a risk for which he is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy provides cover for accidental loss or damage to insured property during the period of insurance. The PDS defines ‘loss or damage’ as:
direct physical loss of, destruction of, or damage to Insured Property from any sudden and accidental cause not otherwise excluded by this Policy…
On 9 May 20213, the insurer was notified that the unit had sustained water ingress damage during a storm on 6 May 2023. The cause of the damage was noted as overflow from a blocked drain on a neighbouring property.
The insurer partially accepted the claim. Accordingly, at least to that extent, the insurer has acknowledged the existence of a claimable loss under the policy terms. However, it denies the damage sustained to the bathroom, ensuite, kitchen, and laundry is covered.
Once a complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Parties obtained expert reports
On 8 May 2023, builder P attended the unit at the complainant’s request. P reported to the insurer’s loss adjuster Y that during the claim event, flooring surfaces, walls, skirting boards, architraves, and joinery throughout the unit were damaged. P undertook cleaning and installed drying equipment.
Y inspected the home on 11 May 2023. It identified damage to kitchen cabinetry, bathroom and ensuite vanities, vinyl within the toilet and bathroom, and the hot water system and air conditioner. Y also identified minor damage to some skirting boards. Y said the main damage was to carpet and floating floors but noted that damage was not covered under the policy.
On 13 July 2023, restorer F attended the unit. Due to the moisture readings obtained and the damage present, F suspected there were issues with the shower recesses in the ensuite and bathroom. It arranged for plumber S to perform leak detection testing. F said the test results led it to believe the bathroom, ensuite, kitchen, and laundry damage were not claim related.
S performed the leak detection testing on 17 and 18 July 2023. It reported that:
· the grout lines and silicone seals in the main bathroom shower recess showed signs of deterioration which would allow water to leak through
· on spray and flood testing, water overflowed the shower base into the walls on both sides
· there was a corresponding increase in moisture levels recorded in the kitchen, and S believed the cause of damage in the kitchen was the leaking shower
· there were no seals around the shower spindles, and this would also allow water through
· the same issues were present in the ensuite shower recess, and they were causing damage in the laundry
· in addition, some vinyl flooring in front of the ensuite shower had been removed and there was no sign of waterproofing.
Insurer partially denied the claim
Based on the reports of F and S, the insurer says the complainant has not shown that the damage to the bathroom, ensuite, kitchen, and laundry are claim related. Instead, it submits that damage is excluded because the PDS states on page 27 that the policy does not cover loss or damage caused by:
· wear, tear, gradual deterioration or developing flaws
· lack of maintenance or failure to maintain the property in a reasonably good state of repair.
It is reasonable that the claim is cash settled
The PDS confirms on page 28 that the insurer may cash settle a claim and, in deciding whether to do so, will act reasonably.
It is not in dispute that the unit sustained accidental damage due to the blocked drain overflowing. However, the insurer says there is also damage present which is not covered by the policy. It says as a result, its builders cannot warrant completion of claim-related repairs, so it has paid and offered cash settlement amounts.
The complainant initially wanted the insurer to complete repairs but is now open to a cash settlement. The change in the complainant’s position reflects his loss of faith in the insurer and its trades to adequately complete repairs.
I am therefore satisfied that it is reasonable that the claim be cash settled.
A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is typically applied to the quoted amount to allow for contingencies. It should also serve to compensate for the transfer of risk and the loss of the lifetime guarantee.
Insurer has paid and offered cash settlement amounts
The insurer initially arranged for builder AC to undertake claim related repairs.
On 12 January 2024, Y reported to the insurer that most of the repairs had been undertaken. Mould had been found behind a kitchen kickboard. Y asked AC to remove all the kickboards so a proper review could be undertaken. Unfortunately, without authorisation, AC removed all the kitchen cabinetry and cut the plaster away to a height of 1,300mm.
On 27 March 2024, the insurer paid the complainant $8,058.60. That was the amount AC had set out in a quote dated 28 February 2024 for repairs to the ensuite, laundry, toilet, and bathroom. In its IDR response dated 22 August 2024, the insurer said it paid that amount to the complainant due to AC:
· completing extensive demolition that was not required
· uncovering pre-existing building conditions that needed rectification before the claim related repairs could be completed.
On 26 April 2024, the insurer paid the complainant $7,826.32 as a further cash settlement. It says that was based on AC’s quote dated 28 February 2024 for repairs to the kitchen required due to AC’s actions. The quote also included an allowance for garage door painting.
While this complaint has been before AFCA, the insurer has offered the following additional cash settlement amounts, which the complainant is willing to accept:
· $522.50 – door repainting
· $4,212.51 – air conditioning unit replacement
· $500.00 – electricity excess usage costs
· $4,017.42 – what builder J charged for the kitchen and garage work on top of AC’s quoted amount. The amount charged also included rectification work following removal of the mould containment barrier the insurer had installed.
If the insurer has not yet paid all those amounts to the complainant, it should promptly do so, and pay interest under section 57 of the Insurance Contracts Act, 1984 (ICA) on the unpaid amounts from 24 April 2025 (date of complainant’s acceptance) to the date of payment..
Complainant seeks more for repair costs
The complainant maintains that the damage to the bathroom, ensuite, kitchen, and laundry are claim related. He submits that:
· as shown in photos he has provided, on strip out of the bathroom and the ensuite, there were no signs of moisture damage or mould
· S’s ‘belief’ is not sufficient to amount to a professional opinion on causation
· the claim event occurred in May 2023, and the kitchen was not stripped out until January 2024. Even though driers had been used previously, the kitchen still required extensive further drying. The amount of moisture could not have come from the bathroom shower
· the vanities and kitchen kickboards did not show signs of moisture related swelling until after the claim event
· in the circumstances, the insurer should cover the additional amounts J charged him for work on the bathroom, ensuite, and kitchen.
The complainant has provided an email he received from J on 12 June 2024. J said:
It would appear that the cause of damage to the bathroom walls could be attributed to the lack of silicone evident in the shower corner. Upon deconstruction of the shower, we only found grout filling the 90o angle of the shower corner and this, over time, has lead [sic] to water ingress into the wall cavity and surrounds.
In addition, the complainant has provided J’s report dated 10 June 2024 on the vanities in the ensuite and bathroom. J said on removing the vanities, they had water related swelling to the chipboard panels and MDF side panels.
The complainant has provided a photo of the replacement HWS the insurer had installed. The photo shows the HWS is resting directly on the ground and has rust on the bottom front corner. The complainant says the HWS should have been installed on a concrete pad, and if that had been done, the corrosion would not have occurred.
The complainant maintains that the unit has always been well maintained. In support, he has provided inspection reports prepared by his managing agent during the period 12 September 2017 to 22 June 2022.
In relation to the cash settlement payments the insurer made on 27 March 2024 and 26 April 2024, the insurer says no offers were made beforehand. He says he was therefore not given the opportunity to assess their adequacy such as by obtaining competing quotes.
The complainant also says the $7,826.32 payment on 26 April 2024 was not for kitchen repair work. Rather, that amount was paid as compensation for the insurer’s delays and miscommunications. He says he was told that by Y, and particularly emphasises an email dated 16 April 2024 from Y to the insurer in which Y said:
Per our discussion, we have already created a report recommending payment in the amount of $7,826.32 [incl] GST, to the insured for the significant delays caused as a result of miscommunication with [AC].
The complainant wants the insurer to cover the cost of mould remediation, including a post remediation verification (PRV) certificate. He notes that Y had recommended to the insurer that AC be required to undertake mould remediation as its unauthorised kitchen strip out.
Additionally, the complainant wants the insurer to obtain from AC compliance certificates for the electrical and gas disconnection in the kitchen, and for the kitchen plumbing work. The complainant says he is a retired electrical engineer so understands the applicable laws.
Insurer is required to pay more for repairs
Based on the exchanged information, I am not satisfied that the complainant has shown that the damage to the bathroom, ensuite, kitchen, and laundry are claim related. Rather, it is more likely than not the damage to those rooms is from excluded causes. That is because:
· I find the conclusions of F and S persuasive, and note that they are supported by what J said in its email to the complainant dated 12 June 2024
· contrary to the managing agent’s inspections reports, the findings of F, S and J confirm that the shower recesses were affected by wear, tear, gradual deterioration and maintenance issues
· the most recent inspection report pre-dates the claim event by nearly a year
· the photos the complainant has provided of themselves are not enough to justify dismissing the findings of F, S and J
· no expert evidence has been provided in support of the complainant’s contention that the moisture in the kitchen in January 2024 could not have come from the bathroom shower.
I am also not persuaded that the insurer’s $7,826.32 was compensation for delays and miscommunication as opposed to for repair work necessitated by AC’s unauthorised strip out. The amount paid is the specific sum AC had quoted. Further, while Y recommended payment of compensation, there is nothing to show the insurer accepted that recommendation. To the contrary, it denies it and notes that Y did not have authority to make binding claim decisions.
However, the insurer in effect agreed to rectify the damage AC caused to the kitchen. While it has paid the $11,843.74 J charged for that work, on 7 October 2024 J also separately charged the complainant $1,384.08 plus GST ($1,522.49 incl GST) for ‘kitchen related additional materials’ including replacement of missing cabinetry.
It is therefore reasonable that the insurer pays the complainant another $1,522.49 plus interest under section 57 of the ICA from 7 October 2024 to the date of payment.
As the kitchen work has been completed, there is no need to apply a contingency uplift.
I acknowledge that J also charged the complainant $4,906.70 In relation to the vanity units. However, as noted above, I am not satisfied the claim event damaged the vanities. Further, AC’s quote dated 28 February 2024 which formed the basis for the $8,058.60 cash settlement payment included $858 per vanity unit and there is nothing to show that allowance was unreasonable.
I acknowledge that the complainant is concerned that he was not given the opportunity to assess the adequacy of the insurer’s cash settlement payments before they were made. To the extent that has caused him frustration, it is to be considered in terms of any entitlement to non-financial loss compensation.
The issue the complainant has raised concerning the HWS is a warranty issue. As the insurer authorised the repair in question, it is reasonable to require it to investigate the complainant’s concerns and, if they are deemed valid, rectify the situation.
While AC revealed the presence of mould in the kitchen, I am not satisfied that the mould was due to the claim event. Therefore, the insurer is not required to remediate it or to obtain a PRV certificate.
The insurer has offered to assist the complainant to obtain any required compliance certificates from AC. I am satisfied that is sufficient.
Therefore, if the complainant accepts this determination, the insurer must:
· within 14 days pay him a further $1,522.49
· promptly investigate the complainant’s concerns about the HWS and, if they are deemed valid, rectify the situation
· assist the complainant to obtain any required compliance certificates from AC.
2.2 Is additional LOR payable?
No. The mould and moisture in the kitchen, bathroom and ensuite meant that the work AC undertook without authorisation would likely have been required anyway. This means the unit would have been unfit due non claim related damage in any event.
Policy covers LOR in specified circumstances
As set out on page 22 of the PDS, the policy covers LOR where a lot has been leased out or is substantiated by a signed lease that shows it would have been leased out. The complainant must show the lot was made unfit to be occupied for its intended purpose by loss or damage that is admitted as a claim.
Insurer has paid LOR
At the time of the claim event, the unit was occupied by the complainant’s son and his partner. They were paying the complainant $714/fortnight in rent. The complainant refunded or did not collect rent from them after the claim event.
The insurer has paid $14,701.43 for LOR during the period 5 October 2023 to 31 July 2024.
The insurer submits that:
Loss of rent payments had continued for periods during which the unit would be considered fit to be occupied, and whilst the tenants remained within the unit…The decision to refund rent or not collect it is not what determines coverage under the loss of rent benefit. The Financial Firm did not seek to recover or reduce the claim amount by amounts that it has been determined would not have been allowed for in view of the policy coverage, but also do not believe it reasonable to expect a further amount should be payable
Complainant seeks additional LOR
The complainant seeks an additional $2,034.80 for LOR up to 8 September 2024, when the kitchen was rendered functional again. He says the lack of functionality was caused by AC’s unauthorised strip out.
Insurer is not required to pay additional LOR
I acknowledge that AC stripped out the kitchen without authorisation. However, the presence of mould and moisture means much if not all that work would have been necessary in any event. I have already determined the mould and moisture in the kitchen (and the bathroom/ensuite) were not due to the claim event.
In the circumstances, the insurer is not required to pay additional LOR.
2.3 Is indirect financial loss compensation payable?
No. The policy excludes indirect financial loss. Based on the exchanged information, I am otherwise not satisfied the insurer should pay indirect financial loss outside the policy terms.
AFCA can award compensation for indirect financial loss
Under paragraph D.3.2 of its Rules, AFCA may require an insurer to compensate a complaint for indirect financial loss (also known as consequential loss). The maximum amount we may award is capped at $6,300.
We may not award indirect financial loss under a general insurance policy that expressly excludes such liability. However, we may make such an award outside the policy terms if the insurer’s conduct justifies doing so.
Complainant seeks indirect financial loss compensation
The complainant says that to complete the repairs to the unit, on 5 July 2024 he had to take $30,000 out of his superannuation fund. He says his fund delivers an annual investment return rate of 15.22% and that the insurer should pay him the loss of investment return the withdrawal of $30,000 caused him.
In addition, the complainant says his son had planned to purchase the unit and had even started renovating it before the claim event occurred. He says the event and the delay in completion of repairs has meant the sale is yet to go through. He wants the insurer to reimburse him interest he has paid on his home loan since 1 February 2024, being the date he says AC should have completed the kitchen repairs.
Indirect financial loss compensation is not payable
The PDS confirms on page 28 that consequential loss is excluded. I am therefore unable to award indirect financial loss compensation under the policy.
Based on the exchanged information, I am otherwise not satisfied the insurer should pay indirect financial loss outside the policy terms. This is because:
· the repairs the complainant paid for were not covered for the reasons set out above
· while AC performed unauthorised strip out work, it is likely much if not all that work would have been necessary in any event due to the non claim related mould and moisture.
2.4 Is non-financial loss compensation payable?
Yes. The insurer’s poor claim handling and delays unreasonably caused the complainant major stress and inconvenience. It is to pay him $3,500 in non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under paragraph D.3.3 of its Rules, AFCA may award up to $6,300 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation for non-financial loss. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation.
Non-financial loss compensation is payable
The complainant says the insurer’s poor claim handling and delays have caused him stress and frustration, have affected his sleep, and have taken a toll on his health. He considers the insurer misled him particularly in relation to the reason for the $7,826.32 cash settlement. He also says the insurer has failed to comply with the General Insurance Code of Practice.
The insurer has acknowledged that the claim has taken longer than it should have, that it and its service providers should have communicated more regularly and more clearly, and that there were issues with claim and project management. It also accepts that AC’s unauthorised strip out work caused the complainant distress.
Having carefully reviewed the exchanged information, I am satisfied that there have been multiple instances of delays and miscommunication by the insurer. I accept that those aspects have unreasonably caused the complainant major stress and inconvenience.
Even acknowledging the various payments that the insurer has made outside the policy terms, I am satisfied it is fair to award the complainant $3,500 in non-financial loss compensation.
2.5 Why is the outcome fair?
The outcome fairly reflects the policy response to the claim and the insurer’s claim handling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.