Claim declined for storm damage to basement wall on grounds of inherent/structural defects and retaining wall exclusion
Text of the determination
Determination
|
Case number
|
12-24-139469
|
Financial firm
|
Insurance Australia Limited
Case number: 12-24-139469 19 February 2026
1 Determination overview
1.1 Complaint
The complainants held a home building and contents policy with the financial firm (insurer) for their home in New South Wales. The policy period was from 13 January 2022 to 13 January 2023. The building cover was $1,063,912 and there was a basic excess of $1,000.
The complainants lodged a claim for storm damage to a basement wall. The complainants were represented by their son. In this determination, the complainants and their son are referred to as the complainants.
The insurer accepted that the complainants had made a valid claim for storm damage.
The insurer denied the claim. The insurer said that the cause of the damage to the wall was caused by inherent and structural defects and was excluded under the policy. The insurer also said that only a percentage of the damage to the wall was covered and that the component of the wall which was a ‘retaining wall’ was not covered by the policy.
1.2 Issues and key findings
Was the insurer entitled to decline the claim?
No. The insurer accepted that the complainants had established a valid claim. The insurer has not established that the cause of the damage was caused by inherent defects or structural defects or arising from faulty design. The insurer was obliged to accept the claim but was entitled to limit the insured amount to the component of the wall that was not a retaining wall.
Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim.
1.3 Determination
This determination is in favour of the complainants. Within 28 days of receiving notice of the complainants’ acceptance of the determination, the insurer shall:
· appoint a structural engineer and builder to prepare a Scope of Works (SOW) and an actionable quote to complete the repairs to the basement wall limited to that component of the wall which is not a retaining wall (62.5 per cent in total of the actionable quote)
· on receipt of the SOW and an actionable quote the insurer is either to appoint the builder to complete the repairs or cash settle the claim based on 62.5% of the actionable quote
· in the event that the insurer proposes to cash settle the claim, the insurer is to increase the actionable quote by 20% to allow for possible contingencies
· pay the complainants for their cost of the make safe works.
2 Reasons for determination
2.1 Was the insurer entitled to decline the claim?
No. The insurer accepted that the complainants had established a valid claim. The insurer has not established that the cause of the damage was caused by inherent defects or structural defects or arising from faulty design. The insurer was obliged to accept the claim but was entitled to limit the insured amount to the component of the wall that was not a retaining wall.
Coverage of the policy
The complainants’ policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance (subject to the conditions, limitations and exclusions) is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and the Certificate of Insurance (Certificate) (together referred to as the policy). The policy was provided to the complainants. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainants.
The Certificate recorded that the year in which the home was built was ‘Approximately 1980’.
Complainant has the initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a valid (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Proximate cause
When establishing the cause of the damage to the complainant’s property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause.
Policy covered storm damage subject to exclusions
The policy covered damage caused by a storm (page 30). Loss or damage to ‘retaining walls’ was excluded under the storm cover.
The complainants also held additional cover for accidental damage which was defined in the policy (page 96) as ‘damage that is caused unintentionally to your home or contents’. The accidental cover excluded damage caused by ‘inherent defects and structural defects’ (page 52). The accidental cover also excluded damage to retaining walls (page 52).
The policy also contained general exclusions (page 66) for loss or damage arising from ‘faulty design or workmanship’.
Insurer accepted that the complainants had made a valid claim
The complainants lodged a building claim under their policy after a storm event on 8 March 2022.
On 29 September 2024 the insurer accepted that the complainants had made a valid claim for storm damage but only to that part of the wall which was load bearing and not for damage to the retaining wall component.
Insurer declined the claim but sought further information
The insurer obtained a report from ST, consulting engineers, dated 5 April 2022 (based on an inspection on 31 March 2022). ST’s report stated that the age of the structure was that ‘based on the brick profile, [ST understood] the building was initially constructed around 1980’s’. ST concluded that:
· the gravity brick-work retaining wall was an unreinforced ’gravity‘ type structure which relied on its mass to resist overturning
· the pattern of damage was consistent with hydrostatic pressures, tree root growth pressures and long-term soil creep against the wall which was acting as a retaining wall.
ST’s initial opinion was that there were three possible causes for the damage. ST said that damage could be attributed to a combination of:
· defective original workmanship / design contrary to Building Codes, Australian Standards and Design Guides applicable at the time of construction
· tree root growth pressures
· hydrostatic pressures.
Within the report dated 5 April 2022, ST referred to ‘Design Review’ and stated:
· the applicable design code at the time of construction of the building would have been ‘AS 1640-1974: Brickwork in Buildings’
· that Standard referred to ‘tensile stresses not being permitted under earth pressure loading and that in certain circumstances which included ‘earth pressure, or other forces regularly applied’ the tensile strength was not permitted and the ‘tensile strength of brickwork shall be taken as zero’
· no tensile reinforcement was evident along the damaged wall
· design calculations indicated that the masonry ‘would have experienced tensile stresses as a result of the permanent soil back-fill pressure from the external front ground area, contrary to the design requirement’ of the Standard
· accordingly, the wall did ‘not comply with Australian standards or building codes/ ‘rules of thumb’ applicable at the time of its original construction.
The insurer declined the claim on 8 May 2024 based on ST’s Report. Importantly, the insurer acknowledged that ST had ‘failed to demonstrate their findings with regards to the tree roots and hydrostatic pressure’. The insurer’s acknowledgement and concession were appropriate ones. However, the insurer also sought further information to be prepared by it and to be obtained by the complainants regarding the storm event and the amount of rainfall regarding the claimed damage.
Insurer engaged a further engineer
The insurer engaged another engineer, JK, to prepare a report dated 28 May 2024 (based on an inspection on 21 May 2024).
JK said:
· the Bureau of Meteorology (BOM) records for the closest weather station (1.3 kilometres from the complainants’ property) showed that:
> over the period 1 to 8 March 2022, 420 mm of rain was measured (compared to a mean rainfall of 114 mm)
> the rainfall over those eight days was more than three and half times the mean monthly March rainfall
> further, 197 mm of rainfall was measured over the last week or so of February 2022 which was just over the entire February mean monthly rainfall
> the ’rainfall intensity over this period was therefore significant, and implies that the ground would have been saturated, or near saturated, a few days into March 2022
· the complainants had informed JK that:
> during a period of continuous rain, they measured 150mm on a particular day in early March 2022 (which was consistent with the BOM records which showed 155mm on 3 March 2022)
> the gutters along the northern side were not coping with the runoff and were overflowing
> the overflow was ’reportedly significant (like a waterfall) and flowed over the surface of the backfill directly behind the northern basement wall
> shortly thereafter the complainants ’noted that the northern basement wall had deflected’.
JK concluded:
· the damage was ‘triggered by the heavy rain’ in late February 2022 and early March 2022
· this heavy rain resulted in the ground becoming increasingly saturated which caused lateral hydrostatic pressure on the wall
· the wall was not ‘designed/ constructed to meet retaining wall standards’ and the increased pressure caused it to rotate/ tilt and bulge inwards
· had the wall been designed/ constructed to ‘retain up to 1.8m of backfill, it would have been of reinforced concrete and reinforced concrete block construction with full drainage provisions.
In summary, JK concluded that the damage to the wall was the:
result of an inadequate design/ construction of the wall. The inadequate design/ construction relates to the inadequate strength and lack of free draining backfill of the wall. This [conclusion] is generally consistent with [ST’s] findings, except that [JK] found no evidence of tree roots which may have contributed to the damage.
Complainants engaged an engineer
The complainants relied upon an expert report from KY, structural and civil engineers, dated 28 June 2024. KY stated that structural drawings were not available and that it had not carried out design check calculations for the existing structures and could not comment on the original structural design. KY concluded that:
the damage sustained to the foundation wall at the front elevation indicates that mortar and brick displacement between the linear courses have rotated inward, this displacement is consistent with the effect of a single movement.
The damage by rotation of the wall is consistent from occurrence with a rush of water accumulating behind the wall exerting hydrostatic pressure against the wall face. The magnitude of this pressure increases linearly with the depth of the water rise, leading to rotation of the wall from excessive hydrostatic pressure.’
Reference from the Bureau of Meteorology archives show at the time of the stated damage to the foundation wall there was indeed a CAT event in February-March 2022 where the [complainants’] region sustained up to 119mm of rainfall on a single day alone. The high volume of rainfall is forced to impact water table fluctuations subjecting the wall to cyclonic loading and reducing the effective normal force of the foundation wall. It is noted that notwithstanding functioning stormwater infrastructure to the wall, the drainage of water from the wall would have abstained from the sheer volume of 119mm of rainfall in a single day.
Insurer elected to deny the claim
As referred to above, on 29 September 2024 the insurer accepted that the complainants had made a valid claim for storm damage but only to that part of the wall which was load bearing and not damage to the retaining wall component. In its letter of 29 September 2024, the insurer referred to the ‘specific reason’ it said that it was entitled to deny the claim. The insurer said:
In consideration of JK’s report, [the insurer was] satisfied tree root activity [was] not a contributing factor to the wall’s failure. [The insurer was] satisfied, had the wall been built to relevant standards at the time of construction, it ought to have been able to withstand the increased pressure, from the saturation of the ground from the rain events of February and March 2022. As such, [the insurer’s] position, the proximate cause of the damage [was] faulty design/workmanship.
On 12 March 2025, the insurer provided calculations from ST (in a Supplementary Report dated 28 February 2025) that the proportion of the wall that was a retaining wall was 37.5% and that the load bearing component was 62.5%. In its calculations, ST made an allocation for the load bearing sections of the wall and gave equal weighting to those sections which performed a dual function (namely, the function of load bearing and the function of retaining wall).
The insurer said that it was entitled to decline the whole of the cost of the repairs to the damaged wall because ‘the wall ought to have been constructed sufficiently to both retain the soil and maintain the load bearing requirements’. The complainant challenged those calculations on 10 May 2025 but did not provide their own calculations.
Based on the information provided, I accept ST’s evaluation of the retaining wall percentage was a fair calculation. Further, the insurer’s position that it pays the cost to repair ‘the part of the [complainants’] home that was damaged’ was consistent with the policy (page 74) and supported by engineering calculations.
In its Supplementary Report, ST also provided calculations of the tensile stress on the ‘non-functioning’ and ‘functioning’ drainage conditions. However, ST did not provide any explanation of those terms. ST concluded that the resultant tensile stress (MPa) of those respective conditions was 1.3 and 0.204 but, again, did not provide any explanation of those terms. ST simply repeated its earlier conclusion that the wall was ‘non-compliant’ and said that it maintained:
that the damage to the retaining wall [was] consistent with insufficient structural capacity/ tensile stress from long-term earth and hydrostatic pressures contrary to AS 1640-1974.
On 27 March 2025 the insurer said that it maintained its position and denied the complainants’ claim in its entirety.
Insurer not entitled to decline the claim
Based on the exchanged information, I am not satisfied that the insurer was entitled to decline the claim for the damage to the wall (excluding that part (37.5%) comprising a retaining wall).
The complainants said that the house may have been built earlier than the 1980s. However, they did not provide any details of the specific date of the construction of their home and they had insured the building, according to the Certificate as referred to above, on the basis that it was built in approximately 1980. It is fair in the circumstances for that date to be used to determine the insurer’s obligations under the policy
It was not disputed that the wall had been undamaged from its construction in the 1980s until the storm event. There had not been an issue with the wall previously or prior to the storm event.
The storm event was, according to the BOM records, and the complainants’ account (which was recorded in JK‘s report), a significant one. JK described it as of significant intensity and KY concluded that the damage was ’consistent with the effect of a single movement’ and ’a rush of water accumulating behind the wall exerting hydrostatic pressure against the wall face’ which subjected the wall to ’cyclonic loading’.
The insurer’s expert, ST, had initially said that there were three possible causes - defective design at the time of construction, tree root growth pressures and hydrostatic pressures. The insurer, and its second engineer (JK), conceded that those second and third causes were not the cause of the damage.
However, the insurer’s experts did not address, or address sufficiently, the cause of the damage being the storm itself which was of significant intensity and subjected the wall to cyclonic loading. ST prepared two reports and in its Supplementary Report it concluded that, rather than there being three causes as it had concluded in its first report, that the damage was consistent with insufficient structural capacity/ tensile stress from long-term earth and hydrostatic pressures.
Based on that information, that conclusion was not consistent with JK‘s conclusion that the storm was of significant intensity. Further, it was not consistent with KY’s conclusion, which was persuasive as it was supported by the BOM rainfall data and the complainants’ account, that the damage was caused by a single, cyclonic loading event during the storm period.
It is fair in the circumstances and based on the information exchanged, to conclude that the storm was the dominant, effective or operative cause of the damage to the wall. This conclusion is consistent with AFCA’s common sense approach to proximate cause.
Claim to be settled in the following way
The complainants provided a quote for replacement of the entire wall in the amount of $193,050 (including GST) on or about 11 March 2025. The insurer did not accept the complainants’ claim and under the policy it was entitled to engage its own repairers in the event that it accepted the claim (in whole or in part).
It is fair, and consistent with the policy, that the insurer be given the opportunity to engage its own repairers.
Accordingly, the insurer should appoint a structural engineer and builder to prepare a Scope of Works (SOW) and an actionable quote to complete the repairs to the basement wall limited to that component which is not retaining wall (62.5 per cent in total of the actionable quote). On receipt of the SOW and actionable quote the insurer is either to appoint the builder to complete the repairs or cash settle the claim based on 62.5% of the actionable quote.
In the event that the insurer proposes to cash settle the claim, the insurer is to increase the actionable quote to allow for possible contingencies. When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. Further, if additional works are identified, the insurer will include those.
Therefore, when the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power. AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for this transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs. In the circumstances, it is fair for there to be an uplift of 20% in the event that the insurer cash settles the claim.
Insurer should pay for make-safe works
On 29 September 2024 the insurer apologised for not conducting make-safe works and offered to reimburse the complainants for the cost of installing the make safe props on receipt of an invoice from the complainants’ repairer who performed those works. The complainants provided a quotation dated 3 September 2022 from CC, constructors, for the make-safe works in the amount of $16,592.40 (including GST).
The insurer should also reimburse the complainants for the make safe works performed by their repairer.
2.2 Why is the outcome fair?
The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.