1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a strata policy the owner’s corporation holds with the financial firm (insurer).
The complainant says that on 21 September 2021, an earthquake damaged his property. The insurer partially accepted the claim and repaired damage to the complainant’s bathroom and has agreed to cover the damage to the skirting board and plasterboard.
The complainant says the flooring was also damaged in the earthquake. The insurer has declined this aspect of the claim.
1.2 Issues and key findings
Is the insurer liable for damage to the floors?
Yes. I am satisfied the proximate cause of the damage to the floors was the earthquake event.
Is the complainant entitled to compensation?
Yes. The insurer should pay $2,000 in non-financial loss compensation.
Why is the outcome fair?
This outcome is fair having regard to the policy wording, the nature and timing of the damage, the complainant’s credible account, and the insurer’s acceptance of related claims.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of the determination, the insurer is to:
· accept the claim and repair the damage to the floors in accordance with the policy terms, including arranging and paying for temporary accommodation if required
· pay the complainant $2,000 in non-financial loss compensation.
2 Reasons for determination
2.1 Is the insurer liable for damage to the floor?
Yes. I am satisfied the proximate cause of the damage to the floors was the earthquake event.
Policy covers accidental damage subject to exclusions
It is established insurance law that the complainant is required to show, on the balance of probabilities (that it is more likely than not), that he has suffered a loss covered by the policy. This means it must show the loss was caused by a risk for which it is insured.
Subject to the terms and conditions set out in the policy, the complainant’s building is covered for ‘Damage’ that occurs during the period of insurance. The policy defines Damage as:
any partial or total accidental physical loss of, or destruction of property from any sudden and accidental cause not otherwise excluded by this Policy.
The term ‘accidental’ is included in the definition of ‘Damage’ but is not defined in the policy. Therefore, it is appropriate to apply the normal and ordinary meaning. It is accepted insurance law that accidental means unintended and unexpected from the complainant’s point of view.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the responsibility to show it is more likely than not the exclusion or condition applies.
It is not in dispute that the complainant has established a valid claim. The insurer has repaired the damage to other parts of the complainant’s property, including the bathroom. It has also agreed to repair damage to the sliding door and skirting board. The only item in dispute is whether the insurer is liable for damage to the flooring. The insurer says the damage to the flooring is not covered because it is excluded under the terms and conditions of the policy.
The insurer says the damage was caused by:
· a defect in design and construction,
· vibrations not related to the earthquake event,
· wear and tear, or
· gradual deterioration.
Parties disagree about the cause of damage
It is not in dispute that the flooring has sustained damage and is now ‘springy’ in various sections when walked upon. The complainant says he noticed damage to the flooring after the earthquake in 2021.
The complainant says he cannot understand why the flooring is excluded when the insurer has accepted and repaired damage to other parts of the property.
The complainant also provided a pre-purchase inspection report from HB dated 22 September 2020. The report referred to the chipboard flooring beneath the carpet in the bedrooms squeaking slightly when walked upon but did not make any reference to the floor bouncing, squeaking or moving in the lounge room, which the complainant says has occurred after the earthquake.
The complainant says, in submissions he made to AFCA:
In conclusion, my floors did not move or bounce before the earthquake. I have a building report at the time of purchase that does not mention floor movement. I have an insurance representative with an engineer’s report that clearly identifies bathroom tile movement and cracking, floor skirting movement, plaster wall board movement and window frame movement all these have been repaired (with exception of the sliding door / window). It would be impossible for the floor skirting to move without the floor also moving. The floor is attached to all of these parts
The insurer says that the damage to the floor is not covered. It says the proximate cause of damage is that the flooring was not installed in accordance with the building requirements at the time of construction.
Expert reports vary in opinion
There have been several experts comment on the cause and extent of damage in this matter, including damage to other parts of the property.
The complainant submitted a report from KE Engineers, prepared as part of his contents insurance claim. The report identified several areas of damage observed during the inspection, including:
· cracking and delamination of the bottom row of wall tiles on the rear bathroom wall.
· failure of three screws securing the plasterboard wall lining near the sliding door.
· delamination of a section of skirting board at the wall corner near the balcony.
KE concluded that these issues were consistent with movement caused by the earthquake, attributing the tile damage, sliding door issues, and skirting board separation to shaking during the seismic event.
The insurer then engaged an engineer, IE, who prepared a report that the insurer agrees did not sufficiently report on the flooring, but recommended that the insurer conduct deconstructive testing to determine the cause of the damage.
After this, the insurer engaged a builder, PO, to attend the site and deconstruct part of the floor. PO prepared a report dated 23 April 2024 that said:
· he attended to investigate movement related issues with the subfloor system
· during inspection, he removed sections of the floating floor to expose the particle board underneath which is installed onto engineered floor joists
· the particle board has been attached to the joists using liquid nails and 90mm nails – the adhesive appears to have de-bonded
· a cut out had been made in the particleboard flooring before they arrived which could contribute to the moving floor
· inspection revealed that most of the nails originally used to secure the subfloor were no longer effective because the particle board could be seen moving up and down when walked on while the nails remained stationary
· he noticed a height discrepancy of about 10mm between two of the observable joists
· he created a small cutout near the window to assess any damage to the floor directly underneath – there was no evidence of separation of connections to wall plates or damage to the joist, suggesting the issue does not stem from the joist to wall plate connection failure
· these issues are not something that is generally expected to be resulting from an earthquake
· he recommended that if the claim was accepted, temporarily removing the floating floor and installing new fixings to re-secure the particleboard flooring to the joists
· he provided a quote for repairs of $4,110.61 which included a 20% margin.
The insurer then engaged a report by CH, a building consultant who said the unit is on level 4 which was renovated in the 1990’s – this unit was added at that time. The subfloor consists of a lightweight flooring structure that consists of steel beams notched into the brickwork, timber beams, engineered hyjoists and yellow tongue flooring.
He reviewed the earlier reports from IE and PO and concluded that the movement and squeaking in the flooring were not caused by the earthquake, but were more likely due to natural material movement over time and poor installation practices during construction.
He observed squeaking and movement in multiple areas of the apartment and conducted a floor level survey that showed a maximum variation of 13mm, with midspan deflection of 20–30mm when weight was applied — indicating significant springiness in the hyjoists.
He attributed the cause of damage to the original builder not installing the floor properly. He also said the damage has been caused by movement in the floor over time. In support of his assertions, he had several photos and referred to relevant Australian codes he said applied at the time. He concluded that:
· the floor had insufficient nail fixings because the nails were spaced at 450mm mid-sheet and 300mm at board ends, rather than the required 150mm at joins
· the glue bonding the flooring to the joists had become brittle and was no longer effective
· multiple nail heads were embedded below the surface using a pneumatic tool
· height differences of up to 10mm were recorded between varying joists where floor leveller had been applied to level the floor to an acceptable standard
· the floor structure was found to bounce up to 30mm when under a live load
· sanding marks and water stains suggested the flooring was exposed to elevated moisture during construction
· nails were observed protruding through the top cord of the hyjoists.
On the basis of these reports, the insurer declined the claim.
Insurer is to cover damage to the flooring
The complainant holds an accidental damage policy with the insurer. The insurer has already accepted and repaired damage to other parts of the property arising from the earthquake on 22 September 2021. The complainant has consistently stated that the flooring did not squeak or bounce prior to the earthquake, and this is supported by a pre-purchase inspection report dated 22 September 2020, which noted only minor squeaking in the bedrooms (under the carpet) and no evidence of floor movement or instability.
The insurer declined the flooring component of the claim on the basis that the damage was not sudden or accidental, but rather due to poor installation or gradual deterioration. However, the insurer’s expert reports were obtained two and three years after the event, and do not definitively exclude the possibility that the earthquake contributed to the damage. The first expert (IE) acknowledged that destructive testing was not conducted and that the damage was localised, but this does not rule out earthquake-related movement. The insurer agrees that IE’s report did not adequately address the issues with the flooring.
The insurer’s building consultant, CH, attributed the flooring issues to poor installation and gradual deterioration, rather than earthquake-related damage. CH referred to various aspects of the subfloor construction and cited Australian Standard AS1860 (1998) to support his conclusions. However, upon reviewing the report and photographic evidence, I am not satisfied that the alleged defects are sufficient to exclude cover under the policy. Specifically:
· water staining was observed in one image (Image 12), but it appeared isolated to a small section. There is no evidence that this caused structural damage or contributed to the flooring movement.
· a photo showed sanding of floor joins, but no explanation was provided as to why this breached any building code or standard.
· a small amount of floor leveller had been applied to the north corner of the living room subfloor. Again, no reasoning was given as to why this was problematic or non-compliant.
· CH identified two nails driven below the flooring surface, but AS1860 permits this immediately prior to sanding.
· one nail was shown protruding through the top plate of a hyjoist. Given the scale of the floor, this appears to be an isolated issue and not indicative of systemic failure. This also could have occurred after the earthquake.
· CH noted that nail spacing was approximately 450mm mid-sheet and 300mm at board joins, whereas AS1860 requires 150mm spacing at joins. This may be a technical breach, but it is unclear whether this applies throughout the property or only in one location.
In contrast, the complainant’s evidence is contemporaneous, consistent, and credible. He reasonably argues that if the floor skirting and wall linings moved, then the floor itself must have moved, as these elements are physically connected. The insurer’s own contractors removed part of the flooring during earlier repairs and did not resecure it, which may have contributed to the current issues.
The insurer bears the burden of proving that an exclusion applies. While there may be evidence of some construction deficiencies, the insurer has not shown that these were the proximate cause of the damage. The available information supports that the damage was sudden, unintended, and unexpected from the complainant’s perspective, and therefore falls within the scope of cover.
2.2 Is the complainant entitled to compensation?
Yes. The insurer should pay $2,000 in non-financial loss compensation.
AFCA may award non-financial loss compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, AFCA may award compensation for non-financial loss (capped at $6,300) where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation or interference with the complainant’s expectation of enjoyment or peace of mind.
Insurer’s offer is fair
I acknowledge that the complainant initially delayed the claim due to difficulty paying the policy excess, when deciding whether to lodge a claim against this insurer or his contents insurer. However, after the claim was lodged, the insurer delayed in assessing the claim, appointing an expert and making a claim decision which contributed to a poor claims experience.
I note that the insurer has acknowledged that the complainant’s experience was not ideal and that the claimed damage was not identified in a timely or appropriate manner. The insurer also conceded that the report prepared by IE did not adequately address the flooring aspect of the claim.
In recognition of this, the insurer has offered $2,000 in non-financial loss compensation. Having reviewed the claim notes, I consider this amount to be fair and an appropriate reflection of the stress and inconvenience experienced by the complainant.
2.3 Why is the outcome fair?
This outcome is fair having regard to the policy wording, the nature and timing of the damage, the complainant’s credible account, and the insurer’s acceptance of related claims.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.