Home / Youi / Determination 12-24-138324

Determination 12-24-138324

Claim for storm damage declined and renewal refused

FirmYoui
Decided2025-07-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed storm damage to her home and challenged the insurer's refusal to renew her policy. AFCA found in favour of the insurer on both the claim denial and the renewal refusal.

The complainant did not establish on the balance of probabilities that storms caused the damage, which the engineer attributed to long-term foundation movement, and the insurer met its section 58 notice obligations when refusing renewal.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-138324 | Financial firm | Youi Pty Ltd Case number: 12-24-138324 30 July 2025 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under her home building insurance policy on 17 November 2023 for storm damage to the insured property. The insurer denied the claim on the basis the damage was not caused by storms but over an extended period due to various factors not covered or excluded under the policy. The insurer refused to offer a renewal for the period 2024/25 given the ongoing issues with the property. The complainant seeks the insurer to insure the property and accept the claim because heavy storms damaged her property in the October/November 2023 period. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. The complainant has not established a claimable loss under the policy. The exchanged information shows the property had suffered from foundation/building movement and cracking over a long period. The complainant has not established the damage to the property was caused by storm(s). The information from the insurer’s engineer (S) does not support the complainant. The evidence does not show a causal link between an insured event and the damage observed. Is the insurer entitled to refuse policy renewal? Yes. The complainant has not shown the insurer made an error in refusing to offer a renewal for the period 2024/25. The insurer satisfied the legislative requirements by notifying the complainant of its refusal to offer a renewal. Why is the outcome fair? Parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the claim and is not required to take any further action in relation to the claim or this complaint. 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Yes. The complainant has not established a claimable loss under the policy. The exchanged information shows the property had suffered from foundation/building movement and cracking over a long period. The complainant has not established the damage to the property was caused by storm(s). The information from the insurer’s engineer (S) does not support the complainant. The evidence does not show a causal link between an insured event and the damage observed. Complainant must establish a claimable loss When making a claim, the complainant has the initial onus of establishing she suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim. Policy cover is subject to term and conditions The policy covers loss or damage to the property caused by: · storm, lightning, wind, hail, snow and storm water overflow from roof gutters and their downpipes or from the area immediately around the premises. This includes instances where the storm causes mechanical, electrical or electronic (including computer software) breakdown or failure; or · landslip or subsidence that occurs within 72 hours of, and directly because of, a storm that occurred within the contract period. The policy defines a storm as a violent atmospheric event which includes a thunderstorm, cyclone or strong wind with or without rain, hail or snow, but not rain showers alone. The maximum amount payable for each incident is the sum insured noted on the policy schedule. The policy defines an incident as an unforeseen, unintended, and unexpected event which occurs suddenly and at a specific place and time. The policy does not cover for loss, damage or legal liability caused by, resulting or arising from a failure to keep the property in good condition. It defines good condition as the insured property is appropriately maintained, kept structurally sound and in a state of good repair. This includes servicing and maintaining as specified by the manufacturer, repairing cracks in a reasonably timely manner, and regularly cleaning gutters. Parties provided different views on the cause of the damage The complainant says: · the structural movement and cracking were caused by one identifiable weather event namely, a significant period of excessive rainfall and stormwater accumulation in the weeks leading up to 17 November 2023, resulting in saturated soil conditions · the pattern of weather activity constituted one event, a cumulative stormwater event, sufficient to cause sudden and serious foundation movement · S did not use the Australian standards applicable to the property at the time of construction when assessing the cause of the damage. S is from another State and so are his qualifications, meaning differences in jurisdiction and legislation · S said there was a lack of drainage as an issue on the right side of her property, however, he failed to mention the 12m drain and three down pipes on that side of the house · since there is no evidence of erosion in the extension, it suggests that water hasn't been an ongoing or significant issue in that area, meaning the lack of drainage cannot be the issue · the insurer did not perform geotechnical investigation or soil testing to support its assessment · damage from soil movement due to excess water is often delayed, and soil instability can occur after gradual saturation. Defective design or pre-existing conditions do not automatically exclude cover if a storm triggered or materially contributed to the damage · her builder BF’s report provided expert opinion linking excess stormwater to be the likely cause of structural movement. The insurer says: · for the claim to be accepted, the damage must be caused by a single storm event and not be specifically excluded from cover · the damage has occurred over time, which is confirmed in the expert opinion obtained from S where he said, ‘Previous patching/painting repair works to a large number of internal cracks and the brickwork, and historical packing, suggest a historic building movement issue.’ · at claim lodgement, the complainant said existing cracks were getting bigger in addition to new cracks · damages incurred by movement/subsidence overtime are specifically excluded under the policy · S used AS2870 – 2011 standard as a reference only. It was used to note building movement characteristics such as stepped and vertical brickwork cracking. Insurer entitled to deny the claim The data from the Bureau of Meteorology shows it recorded 32.6mm rain on 5 October 2023 and 24mm rain on 21 November 2024. The complainant says subsidence and cracking to the property occurred after these events. The remaining calendar days in both months, prior to claim lodgement, show minimal or no rain. The policy generally excludes cover for damage caused by subsidence unless the damage occurred within 72 hours of and directly because of a storm. I acknowledge the complainant’s submission that no major structural concerns were observed at the time of the building inspection in 2015. The building inspection report dated 30 July 2015 observed the following concerns indicating there were signs of building movement at the time: · Kitchen and Dining Area - there was some mildly visible joints and repairs to the ceiling lining - this was not considered significant at the time of the inspection · Living Room - there was some mildly visible joints and repairs to the ceiling lining - this was not considered significant at the time of the inspection · Hallway - there was some mildly visible repairs to the ceiling lining - this was not considered significant at the time of the inspection · Wall Construction Exterior - bagged and painted exterior, there was movement cracking of the masonry on the right elevation, however, the assessor did not consider the cracks to be structurally significant at the time of the inspection · Floor Construction - there were some squeaky floorboards. Squeaky floorboards are not generally structurally significant and, in this instance, the assessor had no concerns regarding structural integrity. There was an added joist under the area of the kitchen that was supported on pine rounds that had collapsed. As this was not part of the original structure this was not considered relevant as it may have been installed to prevent squeaks or bounce · Carport Front - the support post was leaning but as this was a proprietary structure, design by supplier, the assessor was unable to assess the structure apart from a superficial surface appearance which appeared good. After claim lodgement, the insurer’s builder D assessed the damage. He indicated the cause of the damage appeared to be due to general property movement. D recommended the insurer appoints an engineer to confirm the cause of the damage. S assessed the property and concluded the cracking and building movement observed throughout the dwelling was consistent with a combination of: · long-term subsidence of the foundation material · inadequate footing embedment depths · inadequate drainage provisions · constructing extension footings without movement/isolation joints to accommodate for differential footing/foundation movements While I acknowledge S did not undertake detailed soil investigations, S’s report states: Our foundation proving confirms that the original footing system has a shallow embedment depth of circa 100 mm below natural ground which can encourage building movements and wall cracking at weaker points which are typically around door and window openings, as is the case. S considered damage was long-term and ongoing given the evidence of previous paint/patch repairs and historic jacking/packing. During his assessment S did not consider the ant infestation or backyard water ponding to be affecting the structure of the detached garage or the dwelling. The responsibility first remains with the complainant to show the damage to the property was caused by storms. If the damage was a result of subsidence, then the policy covers the damage if it occurred within 72 hours of, and by the storm. The information shared by the complainant at claim lodgement (see section 3.2) and the observations from the 2015 building report above indicate the property has suffered from ongoing movement. While the complainant believes S used the building standards in 2011 finding the building was non-compliant, S clearly states he only used this information to assess the type of damage to the property and the causes of same. The complainant raised several concerns about S’s observations and findings based on her research into the various points. However, she did not provide any report from an expert supporting her concerns or showing the dominant cause of the damage to the property was the storms in October/November 2023. The complainant submitted an annexture from her builder BF’s report indicating the damage to the property was caused by storms. However, she did not share the full report so that I may understand BF’s analysis and how they arrived at the conclusion, given the above findings and the history of cracking at the property: Cause The likely cause of structural movement was excessive storm water, which displaced foundation soils and potentially caused washout under the supporting structure. I accept the complainant undertook repairs to the minor cracking observed in 2021 ensuring her home was maintained in good condition. However, I am satisfied the patch painted areas around the current cracking damage and packing of piers further support the insurer that the property has suffered from ongoing cracking over a long period. Based on the exchanged information, I am not satisfied the dominant or effective cause of the damage was a storm(s). The evidence does not show a causal link between a storm event and the damage observed. In the absence of any contrary expert evidence, I find S’s analysis of the circumstances surrounding the loss, his observations and conclusions persuasive. They are plausible, logical and consistent with the available information. Given the above, I am not satisfied the complainant has shown on the balance of probabilities the damage to the property was caused by storms or from subsidence that occurred within 72 hours of the storms in October/November 2023. The insurer is therefore entitled to deny the claim and it is not necessary to address if the insurer has established the policy exclusions apply. 2.2 Is the insurer entitled to refuse policy renewal? Yes. The complainant has not shown the insurer made an error in refusing to offer a renewal for the period 2024/25. The insurer satisfied the legislative requirements by notifying the complainant of its refusal to offer a renewal. AFCA has limited jurisdiction over insurer’s decision to refuse cover ​Under the AFCA Rules, AFCA cannot generally consider a complaint about an insurer’s decision not to offer insurance. There are some exceptions. This includes where the complaint is that the decision was made indiscriminately, maliciously or on the basis of incorrect information. Complainant has not shown the insurer made an error in refusing renewal When renewable insurance is due to expire, the insurer must provide a notice under section 58 of the Insurance Contracts Act 1984 (Cth). The insurer’s notice must: · be provided at least 14 days before the policy expires · say when the policy will expire On 23 July 2024, the insurer notified the complainant that it would not offer to renew the home insurance policy from 4 September 2023. This is because the property risk fell outside of its underwriting guidelines. The insurer shared a link where the complainant may seek cover from other insurers. The insurer explains the insured property’s risk was reviewed by its underwriter and they decided to refuse cover for the oncoming policy period. It provided notice over a month before the renewal giving the complainant ample time to find another insurer. The underwriter found the home insurance product did not suit or meet the needs of the complainant, due to the following general exclusions: · we will not pay for repair of any item that has poor or faulty design specification, materials, planning or workmanship, or a defect · subsidence or landslip · failure to keep your property in good condition. While the complainant says the insurer’s decision to refuse renewal was based on incomplete and disputed information without sufficient procedural fairness, as explained above, the complainant has not shown that storms damaged the property. Given the above, history of cracking and movement at the property, S’s observations and recommendations on the works required, I am not satisfied the complainant has shown the insurer made an error in refusing renewal for the oncoming policy period. The insurer also provided six weeks’ notice of its decision to refuse renewal, complying with the legislative requirements. The insurer is therefore entitled to refuse renewal for the policy period 2024/25. 2.3 Why is the outcome fair? Parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Claim lodgement on 17 November 2023 WHAT HAPPENED? Three and a half years after I got my bathroom renovated, I noticed a patch of water on my carpet. There was no obvious place where the water was coming from so I got a plumber in. He said it was the tape ware, which was under warranty, so he fixed it. I then noticed one or two random ants and then there were more and more. I trace them from inside and found that they were coming in from where the water had pooled between my bedroom and ensuite. I have a house on stilts I went outside and saw they were going into the door frame of the door that goes underneath the house. There was thousands of them. I exterminated them and I noticed they were still appearing in my ensuite. So I went exploring and they were still getting in close to the door but this time through a crack in the render. Then I walked around the property to see if I could see any other ants and then I saw that existing cracks were getting bigger and new cracks. Theres cracks externally and internally throughout my house and it looks like my window frames and door are coming away from the brick work. There are 3-4 different entry point where the ants are getting into my house. When we first moved into the house my husband screwed screws in the floor to stop the creaking and I've recently noticed that it's creaking more than it used to. All these things are happening, and its peaking my curiosity as to why. I feel something is happening with the structure of my home. I would like it to be noted that when it rains heavily the back corner of my yard floods. I've tried to mitigate this by adding a rock rubble hole (hole with rocks in it covered with a tarp and mulch over the top) but that wasn't working so I've called [A] Canberra to log a job about it. Icon Water came and inspected it for a storm water problem and they deemed it as not there problem and so its still an open ticket. [A] Canberra need to come out and see if its an infrastructure issue with the nature strip at the back of my house. DAMAGE/LOSS DESCRIPTION: Building: External cracks, internal cracks, roof gable, house movment. Claim Incident Type: WSD (storm damage) (sic)

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.