Determination 12-24-137989

Cash settlement for storm damage (building, temporary accommodation, contents) and claim handling

FirmYoui
Decided2026-08-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$39,000
Non-financial loss$10,800
Amount claimed$549,141
SourceAFCA PDF

Summary

Complainants disputed the insurer's cash settlement and handling of a storm claim. AFCA partially upheld the complaint, requiring a to-code re-quote with a 20% uplift, further temporary accommodation, contents assessment, professional costs and non-financial loss compensation.

The policy does not exclude upgrading damaged parts to meet current codes, so the insurer could not limit liability to like-for-like repairs, and its handling of the claim was inadequate.

Issues

Subjects and remedies

home or building damagemental healthnatural disasterpay claimpay compensationpay interestpay non financial lossreassess claim

Related

All Youi determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-137989 | Financial firm | Youi Pty Ltd Case number: 12-24-137989 28 August 2026 1 Determination overview 1.1 Complaint The complainants are represented in this complaint. Unless otherwise stated, I have referred to the complainants and their representative as ‘the complainants’. The complainants lodged a claim with the financial firm (insurer) for storm damage that occurred on 30 November 2021 (first claim). The insurer accepted the first claim and appointed a builder to provide a repair quote. Before the first claim was settled, a second storm occurred on 26 February 2022, and the complainants lodged a second claim. This determination relates only to the second claim. Although the insurer initially declined the second claim, it later accepted it and cash settled the accepted damage in line with a scope of works (SOW) and quote it obtained. During the AFCA complaint, the complainants completely repaired the property. The complainants dispute the cash settlement amount (including the amount paid for temporary accommodation) and the insurer’s handling of the claim. 1.2 Issues and key findings Should the insurer increase its cash settlement for the building damage? Yes. The insurer should increase its cash settlement to cover repairs in line with current building standards. Should the insurer cover further temporary accommodation costs? Yes. The insurer has paid the complainants $48,360 for temporary accommodation. The policy allows up to 12% of the sum insured ($728,000) to be paid per claim. This totals $87,360. The insurer must pay the remaining balance of $39,000. Should the insurer increase its cash settlement for contents? Yes. The insurer and its restorer were informed of additional contents damaged in the second event, but the insurer did not assess these items. The insurer must work with the complainants to determine a fair settlement amount for the rest of the damaged contents. Should the insurer cover the complainants’ professional costs? Yes. It was reasonable for the complainants to seek expert and professional assistance with the claim and this complaint. It is fair for the insurer to cover some of the complainants claimed costs, above AFCA’s $5,000 limit. Should the insurer pay non-financial loss compensation? Yes. The insurer did not appropriately handle the claim. This caused the complainants significant stress and inconvenience for an extended period. The insurer should pay each complainant $5,400 in non-financial loss compensation (totalling $10,800). Why is the outcome fair? The outcome is fair because the insurer has not fairly assessed its liability for the storm damage. It is fair to require the insurer to take further steps to determine its fair liability for the damage and settle the claim accordingly. 1.3 Determination The determination is partially in favour of the complainants. If the complainants accept this determination, within 21 days of receiving notice of their acceptance, the insurer must: · pay the complainants: > $10,800 non-financial loss compensation > $14,311 to cover expert and professional costs, plus interest in line with section 57 of the Insurance Contracts Act 1984 (Cth) (Act) > $39,000 for temporary accommodation · engage with the complainants and any relevant expert to start assessing the rest of the damaged contents (and cash settle this aspect in a timely manner) · engage an expert to provide a quote based on the insurer’s engineer (CR) ‘to code’ scope of works (SOW) dated 14 November 2022. Within 14 days of receiving the above quote, the insurer must increase its cash settlement for the building damage in line with the quote and pay the complainants accordingly: · less the amount it has already cash settled the complainants for, and · plus a 20% contingency uplift to account for transfer of risk and the loss of lifetime guarantee. If the insurer has not paid any other amounts it previously agreed to, it must include these in its cash settlement. 2 Reasons for determination 2.1 Is the insurer liable to pay additional cash settlement for building damage? Yes. The insurer should increase its cash settlement to cover repairs in line with current building standards. Circumstances and history of the claim A storm in 2021 damaged the property, and the complainants lodged the first claim with the insurer. The 2021 storm caused water to enter the ceiling above the kitchen and bathroom and flood the downstairs area. The insurer cash settled the claim for $47,336.81 (which included a 20% uplift). Before the first claim was settled, a second storm occurred on 26 February 2022, prompting the complainants to lodge a second claim. The second claim is the subject of this complaint. After initially declining the second claim, the insurer: · changed its decision and accepted the claim, and · paid the complainants a cash settlement for the damage to northern part of the property (which includes a sunroom and deck). The insurer’s cash settlement was made on the basis that the repairs would be to the standard the property was in before it was damaged. The parties dispute whether the cash settlement is: · fair and in line with the terms of the policy, and · sufficient to appropriately repair the damage to the property. The complainants also say the insurer’s delays caused mould damage at the property as the insurer failed to mitigate or contain the water damage. While the claim and the AFCA complaint have been open, the complainants have repaired the property and attempted to sell it. The complainants say the cost of the repairs they undertook was $549,140.90. Insurer not liable for all works the complainants completed The complainants say as more than 50 percent of the building was affected, the entire house needed to be repaired to comply with applicable codes and standards. The complainants have referred to sections 80 and 81 of the Building Act 1975 (QLD) in support of their position. The commentary from the complainants’ building certifier is: Due to the extent of foundation damage and movement of the building a RPEQ [Registered Professional Engineer of Queensland] structural engineering report on the condition of the whole building is necessary to enable the building certifier to determine if Section 80 should be applied. After addressing Section 80 the building certifier would then determine if Section 81 had to be applied as the full extent of required works could likely change expanding the scope of work to half the volume of the existing building, therefore. triggering Section 81. There is no persuasive information to show the entire house was damaged by the second storm. It is also unclear whether: · any of the repairs the complainants undertook are for damage related to the first claim · the storm damage (and its repairs) constitutes more than half the total volume of the existing building/structure, and · it would have been a condition on the repairs to the storm damage that any part of the existing building or structure must comply with current building standards. Further, the policy excludes upgrades to undamaged parts of the house to comply with current building codes, regulations and laws. I am not persuaded the complainants have shown a reasonable basis to require the insurer to cover all the works they did to the property. This includes any costs related to the construction loan the complainants obtained to pay for the work. Insurer cannot limit liability for repairs to old building standards The insurer’s cash settlement for the property repairs was based on a quote from its builder LJ for $191,185.40 (plus a 20% uplift). This was done on a ‘like for like’ basis (i.e. based on the condition of the property before the damage), and not in line with current building standards. The insurer says it is not responsible for upgrades, complete demolition or rebuilding of the property. The complainants have referred to the product disclosure statement (PDS) which sets out how an insured is to select the sum insured amount for their building and contents: 1. To cover your buildings and contents: You select an overall current replacement value for buildings and for contents. For buildings · Allow for the total cost of re-building, including replacement of all fixtures, fittings and structural improvements at the premises. When deciding how much to insure your buildings for, you should calculate the replacement cost of your buildings at today’s prices and allow for the costs to meet current building codes, regulations and laws. The value of the land should be excluded because it is not covered. The complainants say this supports a finding such costs are indemnified by the policy. I also note the following general exclusions: 2. additional costs resulting from your buildings or any part thereof not being compliant with building codes, regulations or laws, including any required approval by the relevant building authority, that were already in place when the buildings were originally built, subsequently altered or renovated; 3. upgrading undamaged parts of your buildings to comply with current building codes, regulations and laws; It is not in dispute the northern wall (and surrounding area) was damaged by the storm. The cost to repair the damage is not an additional cost resulting from the building not being compliant with building standards in place at the time the house was built. The cost to repair the damage to current standards is a cost resulting from the insured event. The policy does not exclude the cost of upgrading damaged parts of the building to meet current building requirements. This is consistent with the complainants’ observations about the calculation of the sum insured. Where the damage is accepted, I do not consider the insurer is entitled to limit its liability to cover repairs that are not compliant with current building codes, solely on the basis it considers this to be an upgrade. Complainants’ quotes are not fair and reasonable The complainants provided a breakdown of the work they undertook to the property, as well as previous quotes they obtained. It appears at least some of this work was completed by JJ, a builder who quoted the complainants $1,070,853.30 for the works to the entire house. Having considered the complainants’ quotes, I do not consider them to be fair and reasonable, as they include work to the entire house, not just work to repair the storm damage. The insurer is not required to increase its cash settlement: · to cover the work the complainants undertook, or · in line with the complainants’ previous quotes. Insurer should obtain updated quote and increase its cash settlement For the above reasons, I do not consider the insurer is entitled to limit its liability for the repairs to the damage on a ‘like for like’ basis. I am therefore not persuaded the insurer’s cash settlement is fair and reasonable. The JJ quote does not break down the repairs sufficiently for me to determine what is solely related to the storm damage. For this reason, I have not had regard to it when determining a fair outcome for this complaint. The insurer obtained two SOWs from CR (one ‘like for like’ and the other ‘to code’). The insurer obtained a quote based on the like for like SOW. I consider it appropriate for the insurer to obtain an actionable quote based on CR’s ‘to code’ SOW. This must be based on rates available to the complainants. I acknowledge the complainants have taken issue with CR’s involvement in the claim and the complaint. However, CR’s SOW is generally similar to the SOW included in the insurer’s other engineer’s report from V, which the complainants’ engineer, MB, largely agrees with. However, it is more comprehensive and was completed on the basis that the works comply with current building codes (whereas the V SOW does not). I consider the CR ‘to code’ SOW most persuasively sets out the repairs that would have been required to fix the storm damage up to current building standards. To the extent additional expert reports would have been required to complete these repairs, allowance should be made in the SOW. To the extent it is helpful in determining the appropriate cash settlement amount, the insurer’s experts may (but do not have to) have regard to the actual costs the complainants incurred when they repaired the property. As the SOW is to be amended, this must include updated provision for cleanup and demolition costs. I do not consider either party’s estimated costs to be reliable. The insurer must cash settle these repairs based on the updated SOW, plus a 20% uplift to account for transfer of risk and loss of repair guarantee, less the amount it already paid the complainants. If the insurer has not made the payment for asbestos removal to the lower floor (which it agreed to) it must do so. To the extent any of the damage caused by the 2021 storm has been covered by the repairs awarded in this determination, the insurer may take this into account when reaching any settlement figure for the first claim, should the complainants pursue that claim. No persuasive information to show mould remediation costs should increase In relation to the mould at the property, the complainants say as part of the repair process: · mould affected parts of the house were removed and replaced with new sealed material, and · the remaining building elements were fully dried and cleaned. The complainants have referred to some of the work set out in the MB SOW as relating to mould remediation. Apart from including professional cleaning of the house where required, there is no expert commentary to: · say what was required to remediate the mould (whether that be cleaning, or demolition and replacement), or · to support the work set out in the MB SOW was for mould remediation or repairs to the second claim related damage. The SOW for the first claim suggests some of the work the complainants say was for mould remediation was likely for repairs to damage related to the first claim. Some of the work has already been cash settled (for example, the replacement of the kitchen joinery). The insurer’s cash settlement included a $15,000 allowance for mould remediation, PRV and clearance. It is unclear how this was calculated. There is also no information to show this was insufficient to remediate the mould the second storm caused. The AC photographs show there was mould throughout the ground floor of the house. The insurer’s restorer, RX, completed an initial assessment report which recommended the removal and disposal of non-salvageable carpet. As the complainants have repaired the property, it is no longer possible for the parties to arrange a further assessment to determine what a fair cash settlement amount might otherwise have been for the mould damage. The best available amount to me is the amount allowed for in the insurer’s quote. The insurer has paid a 20% uplift on this amount. The insurer is not required to increase the allowance for mould remediation for the second claim. 2.2 Is the insurer required to pay further temporary accommodation costs? Yes. The insurer has paid the complainants $48,360 for temporary accommodation. The policy allows up to 12% of the sum insured ($728,000) to be paid per claim. This totals $87,360. The insurer must pay the remaining balance of $39,000. Insurer should increase temporary accommodation cash settlement It is not in dispute the insurer accepted the damage was caused by the storm event and paid to cover the complainants’ temporary accommodation. While the complainants have been living in the property next door (which they own), it is not for me to disturb what is accepted between the parties. The insurer also does not dispute this arrangement and was aware of it when determining the complainants’ entitlement to temporary accommodation cover. The insurer says it has cash settled the temporary accommodation costs across both claims, up to the policy limit (which is 12% of the sum insured). The exchanged information shows it has paid: · $39,000 for the first claim, and · $48,360 for the second claim. I note, however, the complainants have referred to these amounts in the opposite order. I acknowledge the insurer says the property was not uninhabitable following the 2021 storm. I have not considered the complainants’ entitlement to temporary accommodation cover under the first claim. The PDS says the payment of accommodation costs is for each claim. The insurer cannot rely on the payment it made for the first claim to say the policy limit has been reached on the second claim. There is no supporting information about how the insurer determined the amount it paid the complainants for temporary accommodation. The claim notes suggest it decided to pay out what it considered to be the balance of the entitlement in February 2023. On this basis, I consider it fair for the insurer to cash settle the complainants the rest of their entitlement (being $39,000). 2.3 Is the insurer required to increase its cash settlement for contents? Yes. The insurer and its restorer were informed of additional contents damaged in the second event, but the insurer did not assess these items. The insurer must work with the complainants to determine a fair settlement amount for the rest of the damaged contents. Insurer should increase contents cash settlement The exchanged information shows the insurer offered the complainants a $28,274 cash settlement for the contents portion of the claim. As part of the ongoing dispute about contents, RX reattended the property for a contents assessment. RX’s report dated 4 February 2025 shows the insurer asked its trades to review the external items, including those in the shed (which were placed there after the first storm but further damaged by the second storm). However, this was not done, as RX stated that contents stored outside the building were not claim-related. RX also noted in its report the insured requested an assessment of the contents in the shed, but there is no information to show this was done. When the complainants provided a list of contents stored outside the main dwelling, the insurer asked the complainants to demonstrate how these items were damaged by the second event. I have reviewed this list and I accept there is water damage to the additional contents claimed. It is plausible these items were damaged by the second storm. Considering the insurer and RX chose not to conduct further assessment, it is reasonable for the insurer to accept liability for these items. The complainants and the insurer are to work together to establish the appropriate replacement costs for the damaged items the complainants submitted. The insurer should then cash settle the claim for contents in accordance with its policy. 2.4 Is the insurer required to pay professional costs? Yes. It was reasonable for the complainants to seek expert and professional assistance with the claim and this complaint. It is fair for the insurer to cover some of the complainants’ claimed costs, above AFCA’s $5,000 limit. Insurer should cover some of the complainants’ professional costs I acknowledge the complainants say some of the reports they obtained should be considered part of the repair costs. The AFCA Rules provide that, unless special circumstances apply, an insurer may be required to contribute up to $5,000 towards the legal or other professional costs incurred by the complainant in the course of the complaint. In this case, I consider special circumstances apply to require the insurer to cover some of the complainants’ costs, above the $5,000 limit. The insurer has agreed to cover the costs the complainants incurred to obtain the MB causation report ($6,229.38) and an engineering report ($1,100). These costs total $7,329.38. The insurer has also agreed to pay interest in line with section 57 of the Act on these costs. This is fair. I also consider it fair for the insurer to cover the costs incurred to obtain the MC report in reply ($4,306.50). I consider this was helpful in determining the outcome of this complaint. It is apparent the complainants engaged a building certifier, DC, to assist with responding to the insurer’s experts. The complainants are claiming $3,085.50 for these costs. There is no supporting invoice to show DC charged this amount, or what those costs were for. As the information from DC is limited, I do not consider the insurer is required to cover these costs. I am also not persuaded the insurer is liable for the complainants’ costs to obtain: · the SOWs as I do not find they persuasively set out the repairs the insurer is liable for, or · the geotechnical reports, as I have not relied on them in this complaint. The plumbing and gas invoices, and the invoice for TE relate to the septic tank, which is not related to the second claim. I do, however, consider the complaint and the circumstances of the claim were sufficiently complex and novel that obtaining legal advice and engaging a paid representative was reasonable. I consider it fair for the insurer to reimburse the full amount of these costs (being $4,504.50 for legal costs and $5,550 for representative costs). This is subject to the complainants providing the second invoice for the representative’s costs. This is on top of what the insurer has already agreed to cover. The insurer must also pay interest in line with section 57 of the Act from the date of payment to the date it reimburses these costs. 2.5 Should the insurer pay non-financial loss compensation? Yes. The insurer did not appropriately handle the claim. This caused the complainants significant stress and inconvenience for an extended period. The insurer should pay each complainant $5,400 in non-financial loss compensation (totalling $10,800). Award of non-financial loss compensation is warranted The complainants lodged their first AFCA complaint in 2023, which was separated into two separate complaints to consider each individual claim. AFCA’s approach to non-financial loss compensation is set out below in section 3.1 of this determination. Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss for complaints lodged in 2023. I accept that the complainants in this matter have suffered an unusual degree of physical inconvenience and interference with their expectation of enjoyment and peace of mind. This is because: · the complainants have not been able to live at their house for an extended period · the insurer initially declined the claim · the cash settlement for the accepted damage was not fair and reasonable as it was not based on a quote to repair the building to current building codes · the insurer’s delay caused mental stress to the complainants and their children, which required counselling (and the insurer has acknowledged this). For the reasons outlined above, I accept that the insurer caused a considerable degree of stress and inconvenience, which in my view is at the higher end of the scale. It is fair, in the circumstances, that the insurer pays the complainants $5,400 each as compensation for non-financial loss. 2.6 Why is the outcome fair? Outcome is fair in the circumstances The outcome is fair because the insurer has not fairly assessed its liability for the storm damage. It is fair to require the insurer to take further steps to determine its fair liability for the damage and settle the claim accordingly. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Extract of the policy Insured events Your buildings and contents are covered up to the sum insured shown on your policy schedule for the following events where they occur at the insured premises. […] 6. Storm What is covered? Loss or damage to the insured property caused by storm, lightning, wind, hail, snow and storm water overflow from roof gutters and their downpipes or from the area immediately around the premises. This includes instances where the storm causes mechanical, electrical or electronic (including computer software) breakdown or failure. Loss or damage to the insured property caused by landslip or subsidence that occurs within 72 hours of, and directly because of, a storm that occurred within the contract period. Where you have increased your sum insured or reduced your excess within 72 hours (or other period noted on your policy schedule) of a storm occurring, cover will be limited to the amounts that were effective prior to the change. […] Extra cover […] 2. Temporary Accommodation: Insured Events What is covered? Buildings Where the premises is owner-occupied, the actual cost you incur for your suitable temporary accommodation for a period of up to 12 months, while your buildings are being repaired or rebuilt, if you cannot live at the premises after an insured event for which a claim is accepted under your buildings policy and we agree that temporary accommodation is required. The most we will pay for each claim is 12% of the buildings sum insured, which includes up to: • 4 weeks in suitable emergency or short-term accommodation; • 48 weeks in suitable residential accommodation at a similar standard to your home; and • the reasonable and necessary costs for: - redirection of mail from the insured premises for up to 12 months; - utility connection costs at the temporary accommodation residence; and - relocation of your contents to and from the temporary accommodation residence if you have contents cover under this policy. We will also pay up to $250 per month for pet accommodation, up to a limit of $3,000, for each claim. Suitable accommodation will be assessed based on factors including number of household members, proximity to the insured property, parking requirements and availability. […] General exclusions These general exclusions apply to all sections of your policy. We will not pay for: […] 3. upgrading undamaged parts of your buildings to comply with current building codes, regulations and laws;

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.