Home / Suncorp Group / Determination 12-24-137228

Determination 12-24-137228

Partial decline of storm damage claim for drainage system repairs and refusal to reimburse professional fees

FirmSuncorp Group
Decided2025-04-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$18,315
SourceAFCA PDF

Summary

The complainant claimed for storm damage and sought reimbursement for drainage system repairs he completed plus professional fees, after the insurer accepted only drain clearing and pit realignment. AFCA found for the insurer.

The complainant did not establish the additional drainage damage was caused by the storm and, by repairing before the insurer could inspect, prejudiced its ability to assess the loss; professional fees were not warranted under Rule D.5.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authorityno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-137228 | Financial firm | AAI Limited Case number: 12-24-137228 26 March 2025 Determination overview Complaint The complainant holds a home and contents policy with the financial firm (insurer) and lodged a claim for storm damage. The complainant is represented and reference to the complainant will include the representative unless stated otherwise. The insurer assessed and partially accepted the claim. It has declined additional repairs to the storm water drainage system (drainage system) because: the complainant has not established the additional repairs were required because of the event, and it was not given an opportunity to assess any additional damage despite multiple requests prior to repairs being completed by the complainant. The complainant disagrees and says the drainage system was damaged in the event and the insurer advised him all repairs would be covered if the claim was accepted. The complainant is seeking reimbursement for all repairs he completed and for professional fees he incurred in dealing with the claim. Issues and key findings Is the insurer entitled to limit its liability? Yes. I am not persuaded the complainant has established the additional repairs he is seeking cover for were for damage caused in the event. I am also satisfied that by not allowing the insurer to assess the drainage system, he has prejudiced the insurer by precluding it from accurately assessing the loss. Therefore, the insurer is entitled to limit its liability to: the flushing of the drainage system, and realignment of the storm water pits. Is the insurer’s offer fair and reasonable? Yes. I am satisfied the insurer’s offer is fair and reasonable and represents the accepted event related repairs. Is the complainant entitled to reimbursement of professional fees incurred? No. I am not persuaded this claim or complaint was sufficiently complex to warrant the appointment of an expert to support or establish the claim. Accordingly, the complainant is not entitled to reimbursement of professional fees incurred. Why is the outcome fair? The outcome is fair as the complainant has not established the additional works completed to the drainage system were required because of the event. It would be unfair to make the insurer pay for repairs which have not been shown to be from an insurable event. However, it is fair the complainant is settled for the accepted event related repairs. Determination This determination is in favour of the insurer. If the complainant accepts this determination the insurer is required to pay the complainant as outlined in section 2.2 of this determination. Reasons for determination Is the insurer entitled to decline limit its liability? Yes. I am not persuaded the complainant has established the additional repairs he is seeking cover for were for damage caused in the event. I am also satisfied that by not allowing the insurer to assess the drainage system, he has prejudiced the insurer by precluding it the loss. Therefore, the insurer is entitled to limit its liability to: the flushing of the drainage system and realignment of the storm water pits. Complainant must show a loss of a type covered by the policy When making a claim, the complainant has the onus to show he suffered a loss of a type covered under the policy. The complainant must show this on the balance of probabilities (that it is more likely than not). If a claimable loss is shown, then the onus transfers to the insurer to show, on the balance of probabilities, it is entitled to deny the claim or reduce its liability. There is no dispute the complainant’s property was damaged during a storm. However, whether all the damage to the drainage system for which the complainant is seeking cover was because of the event is in dispute. Complainant says the drainage system was damaged in the event The complainant says he arranged his own plumbing inspection which confirmed that CCTV inspection was not possible due to the nature of the blockages. The complainant says his plumber (DP) confirmed the damage to the drainage system was from the event and it required replacement of storm water pits in the drainage system and the jetting of the pipes. The complainant further says he was advised by the insurer on 31 May 2024, if the claim was accepted all costs would be reimbursed and indicated the claim was accepted. The complainant says based on his plumber’s report and the interaction with the insurer, he had the works completed. The complainant says the damage to the drainage system has been established to be $12,540. The works consisted of flushing the pipes and removing and replacing nine storm water drainage pits. The complainant is seeking for the insurer and pay the cost of the drainage works in full. Insurer says the complainant has not established the loss he is seeking The insurer has outlined it appointed a builder (PB) to assess the loss on 9 April 2024. The insurer says based on its initial assessment PB confirmed the event related damage it was able to assess was limited to: clearing the driveway storm water pits and drains re-aligning the storm water pits. However, the insurer says PB was unable to determine: the extent of any movement, blockages, or damage to the drains, or if the recent changes to the driveway (preparation for addition of concrete) had contributed to any damage. The insurer says for this reason it required a CCTV inspection of the drainage system to assess it for possible further damage. The insurer says it attempted to arrange a time for the inspection to be conducted, however the complainant declined the request. The insurer says because of the complainant’s position it partially accepted the claim, however outlined it had not accepted any additional damage as it still required the CCTV inspection to be undertaken. The insurer says it advised the complainant of its request for the inspection on multiple occasions between April and July 2024. The insurer says despite its multiple requests the complainant did not allow the insurer to arrange the CCTV inspection. On 12 July 2024, the complainant provided the insurer with an invoice for repairs conducted including to the drainage system. The insurer reviewed the invoice and declined the additional repairs conducted to the drainage system. The insurer says there was insufficient information to show they were required due to the event. The insurer acknowledges the complainant provided a report from DP, however, says it does not support that the additional damage the complainant is seeking was caused due to the event. The insurer has also outline concerns with the report because: it was not provided until December 2024, after the complaint had been on foot for a period of time, yet the date of attendance was noted as 11 April 2024 there are spelling mistakes in the email associated with the plumber and the suburb the plumber is said to be located does not exist the phone number listed on the report is associated with a hire company (SH) internet searches of the complainant’s representative, show its ABN had a historical list of business including SH. Complainant’s report is not compelling I acknowledge the insurer’s concerns with DP’s report. In saying that, I have also considered whether there is any information contained in the report which shows on balance the additional damage was because of the event. In doing so, I am not persuaded the report is compelling in showing on balance: damage to any or all of the storm water pits (pits) damage that required any or all of the storm water pits to be replaced versus repaired or re-aligned damage to the storm water drainage pipes if there was damage, that it required the repairs and cost the complainant is seeking. I acknowledge the report concludes that all damage is from excessive water ingress from the overflow of the main street drain. However, there is no reasoning, analysis or images provided to support how DP came to this conclusion. I acknowledge DP says the pits were full of silt, however it does not outline how this caused damage, and that it required replacement of the pits. The absence of supporting information on how and why DP drew its conclusions does not assist in establishing the repairs completed were required because the event caused the damage. It is also unclear why CCTV inspection could not be conducted given the report states: We could not undertake CCTV inspection due to significant blockage preventing camara use. We have removed pits, commenced with pressure jetting to clear blockages to see the extent of storm water pipe damages once all pipes were clear, we reinstalled existing storm water pits to previous condition. and All the storm water pits were full of silt generated by the over flow of water from the council drain. This has been attended to under a separate make safe. These statements indicates that DP cleared the blockages. Given this on balance CCTV (or similar) inspection could have been conducted as the blockages have been removed. Further once the blockages are cleared CCTV inspection would be required to assess if the event caused damage to any, some or all of the drainage system (including the storm water pits). The absence of a compelling explanation of why: removal of the pits was required prior to jetting, or CCTV inspection could not be conducted after the jetting, does not assist in outlining the event caused damage to the drainage system. Further, based on the complainant’s quote the majority of the works were related to the storm water pits. Given this I am persuaded on balance DP should have been able to inspect, report and document the damage present. The absence of compelling information to show and outline why all nine storm water pits required replacement rather than repair/re-alignment does not assist the complainant. For these reasons I am not persuaded the report from DP shows on balance the event caused the additional damage to the drainage system the complainant is seeking cover for. There is no compelling information the insurer accepted all repairs I have considered the complainant’s position the insurer accepted the drainage system repairs in its interaction on 31 May 2024. Based on the exchanged information I am not persuaded that the insurer outlined it would cover all repairs. The correspondence up to an including July 2024, shows the insurer had communicated to the complainant it still wanted to complete the CCTV camera inspection. This does not show the insurer had accepted all repairs to the drainage system. The claim notes and a statement from the individual who had the interaction with the complainant on 31 May 2024, do not support the insurer agreed to cover the entire drainage system or the repairs to it. Rather, on balance it shows that the complainant was going to have the repairs conducted regardless and that the insurer advised the complainant to document it. I am not persuaded based on the exchanged information the insurer advised the complainant it had agreed to cover all repairs to the drainage system. Insurer entitled to limit its liability Based on the exchanged information I am not persuaded the complainant has established on balance the drainage system was damaged to the extent he says it was. This is because the complainant has not provided any compelling information to show: evidence of and the extent of the damage to the drainage system including the pits that any damage identified was caused by the event. Accordingly, I am satisfied the insurer is entitled to decline the additional damage to the drainage system the complaint is seeking. Further I am satisfied that the insurer clearly outlined to the complainant that for it to consider the additional repairs to the drainage system a further inspection was required. I am persuaded this was communicated on multiple occasions prior to the complainant commencing repairs. Based on DP’s report, the blockages were cleared within a few days of the insurer initially attending the site. Given this, it is unclear why the complainant did not work with the insurer to have the CCTV inspection conducted prior to the commencement of the works in or around June 2024. Accordingly, even if I was persuaded (which for the reasons above I am not) the complainant established the drainage system was damaged, the insurer would be entitled to decline the additional repairs. I am satisfied that by conducting repairs prior to allowing the insurer to conduct the further assessment, the complainant has prejudiced the insurer’s ability to accurate assess the loss. I am persuaded the prejudice would be the total cost of the additional repairs to the drainage system given the complainant’s actions. The insurer is entitled to decline the additional costs associated with the repairs to the drainage system. The insurer is not required to take any further action in relation to the additional repairs to the drainage system. Is the insurer’s offer fair and reasonable? Yes. I am satisfied the insurer’s offer is fair and reasonable and represents the accepted event related repairs. Insurer offer is fair and reasonable As outlined the insurer has accepted damage related to: clearing the driveway storm water pits and drains re-aligning the storm water pits. The insurer has provided a quote of $3,384.15 for the accepted repairs. The quote included $1,250 for the clearing of the drains and $1,360 for the re-alignment of the storm water pits. On the complainant’s quote a cost of $1,250 has been allocated for the jetting of the storm water pipes. On balance I am persuaded clearing the drains is the same or similar to jetting the pipes. I am persuaded the amount allowed by the insurer is fair and reasonable. This is because the cost to clear the drains was consistent on both quotes. The complainant elected for replacement of the storm water pits (without supporting it was required) rather than re-aligning them. Given, this I am persuaded the amount allowed for re-alignment is fair and reasonable as the works completed were not what the insurer accepted. As the amount for jetting is the same and the other works are not covered an award of an uplift on the cash settlement is not required. Accordingly, I am satisfied that the insurer’s offer for the accepted repairs is fair and reasonable. The insurer is not required to increase its offer. If the complainant accepts this determination the insurer is required to pay the complainant $3,384.15 less any applicable excess if it has not already done so. The insurer is also required to pay the complainant interest on this amount (if it has not made payment) in accordance with section 57 of the Insurance Contracts Act 1984. Interest is payable from 27 June 2024 to the date of payment. Is the complainant entitled to reimbursement of professional fees incurred? No. I am not persuaded this claim or complaint was sufficiently complex to warrant the appointment of an expert to support or establish the claim. Accordingly, the complainant is not entitled to reimbursement of professional fees incurred. Complainant not entitled to professional fees The complainant is seeking $5,775.00 in professional fees for his representative/builder. Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. The exchanged information shows the complainant advised the insurer he gave his representative authority to act on his behalf four days after the claim was lodged. The exchanged information shows the complainant did this as he was unable to deal with the claim. I am not persuaded this claim or complaint was sufficiently complex to warrant the appointment of an expert to support or establish his claim. The reports provided and obtained by the representative did not assist the complainant in establishing his claim. Further given the insurer’s position of wanting to assess the loss further, they were not required. This is because the insurer communicated on multiple occasions it was willing to conduct the further assessment. For these reasons I am of the view the paid representative/expert was not required in the circumstances of this complaint. I am satisfied the insurer is not liable for these expenses. Why is the outcome fair? The outcome is fair as the complainant has not established the additional works completed to the drainage system were required because of the event. It would be unfair to make the insurer pay for repairs which have not been shown to be from an insurable event. However, it is fair the complainant is settled for the accepted event related repairs. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Relevant policy wording Making a claim What you must do • allow us to inspect the damaged building; • allow us to arrange for experts to assess the damaged building and to quote on repair or replacement; .. What you must not do • do not dispose of any damaged parts or items of the building without our consent unless it is necessary for health and safety reasons; • do not carry out or authorise repairs without our consent unless you cannot contact us and need to make emergency repairs to protect the building or it is necessary for health and safety reasons; .. If you do not comply If you do not comply with ‘What you must do’ and ‘What you must not do’ we can reduce or refuse to pay your claim and/or recover from you any costs and/or any monies we have paid and/or cancel your policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.