Home / Defence Service Homes Insurance Scheme / Determination 12-24-136602

Determination 12-24-136602

Insurer denied liability for floor tile damage caused by escape of hot water from a burst flexi hose, saying it was pre-existing

FirmDefence Service Homes Insurance Scheme
Decided2025-05-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The insurer cash settled part of a burst flexi hose water damage claim but denied the floor tiles as pre-existing. AFCA found the escape of liquid was the dominant cause, required the insurer to accept the flooring claim with interest, and pay $2,000 non-financial loss.

The complainant established a claimable escape of liquid loss and the insurer did not prove any exclusion applied, as the proximate cause of the tile damage was the escape of liquid.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Defence Service Homes Insurance Scheme determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-136602 | Financial firm | Defence Service Homes Insurance Scheme Case number: 12-24-136602 30 April 2025 Determination overview Complaint The complainant lodged a claim with the financial firm (insurer) under his home building insurance policy. Hot water escaping from a burst under vanity flexi hose had caused damage to the home including the floor tiles throughout the home on or around 13 June 2022. The insurer partially accepted liability and cash settled the complainant for the reinstatement of the door, door jamb, walls, architraves and vanity. It denied liability for the damaged floor tiles on the basis the issue was pre-existing and not related to the claimed event. The complainant seeks the insurer to cover the cost of floor replacement at the property as the floor tiles were damaged by the hot water escaping from the flexi hose. Issues and key findings Is the insurer’s settlement fair? No. The complainant has established a claimable loss under the policy for the escape of liquid damage. There is no information to show the floor tiles installation did not meet any building codes, tiling standards or the tile manufacturer’s installation guidelines applicable at the time of installation and/or construction of the property. The proximate cause of the resultant damage including the floor tiles is the escape of liquid event. The insurer has failed to establish that an exclusion(s) applies to defeat the claim. Is the insurer required to pay compensation? Yes. The damaged flooring remains unrepaired to date. While the insurer provided timely updates on the progress of the claim, its decision to incorrectly deny liability for the flooring, for over two years, inconvenienced the complainant and his family. Why is the outcome fair? It is fair the insurer accepts liability for the claim covered under the policy terms. It is also fair the insurer pays compensation for its claim handling. Determination This determination is in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to: accept the claim for the damaged flooring pursuant to the policy terms and conditions. It should pay interest on the settlement as detailed in section 2.1 pay $2,000 non-financial loss compensation. Reasons for determination Is the insurer’s settlement fair? No. The complainant has established a claimable loss under the policy for the escape of liquid damage. There is no information to show the floor tiles installation did not meet any building codes, tiling standards or the tile manufacturer’s installation guidelines applicable at the time of installation and/or construction of the property. The proximate cause of the resultant damage including the floor tiles is the escape of liquid event. The insurer has failed to establish that an exclusion(s) applies to defeat the claim. Complainant must establish a claimable loss for the damaged floor tiles When making a claim, the complainant has the onus of establishing he suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability. Policy cover is subject to terms, conditions, and exclusions The policy covers loss or damage to the home caused by the sudden bursting, leaking, discharging or overflowing of liquid from any fixed pipe used mainly to carry liquid. The policy insured the complainant for accidental loss or damage to the home that is accidentally and directly caused by a sudden and unexpected event. Accidental damage cover is limited to $5,000/claim. The policy excludes cover for loss or damage caused by: the home or site settling or shrinking or expanding hydrostatic pressure, or the earth moving (other than from earthquake), erosion defects in structure, design, work done, or materials used on the home or at the site wear and tear rust, corrosion, rot, mildew, seepage, rising damp, any gradual deterioration or process atmospheric or climatic conditions (other than those we say we will insure in the events section), condensation, evaporation. Parties provided different views on cover for the damaged floor tiles The complainant says: the heat from the hot water popped the tiles closest to the bathroom and lifted tiles throughout the house. The greatest damage is right next to the bathroom, and this is clearly seen with the grout pouring out of the tiles from the hot water the building standards referred to by the insurer do not apply. It is effective from 2007, and the house was built before 2007. The original builder confirms the tiles were laid correctly at the time of building the house the insurer’s builder’s (N) site report confirms the damage is consistent with the stated event the insurer’s building consultant (NB) said the event would have worsened and exasperated a pre-existing issue he has never had any issues with the tiles prior to the escape of liquid event in the house, he has lived at the insured property for approximately 13 years. He provided supporting photographic evidence and video the assessor mentioned there were no expansion joints but there are clearly three expansion joints next to the bathroom where the greatest damage to the tiles is present. The insurer says: the licenced builder N determined that there was resultant damage to the vanity, walls and door in the bathroom consistent with water escaping from the burst flexi hose the failure of the floor tiles is consistent with a pre-existing issue/condition prior to and not related to the escape of liquid event NB identified various building/design issues related to the floor tiles in the bathroom and throughout the home the policy will respond in full to all the damage associated with the escape of liquid event, however this does not include the replacement of floor tiles the proximate cause of the failure of the floor tiles outside the bathroom and throughout the home was not caused by the defined event of escape of liquid or any other defined event, rather by factors that are excluded under the policy terms the escape of liquid event has highlighted the issues with the installation, but that does not form the proximate cause of the failure. Nor should tiles pop after an increase in moisture as a result of the claimed escape of liquid event the missing glue and silicone along with the displaced grout are sufficient evidence that the pre-existing condition of the tiles and not the escape of liquid event caused them to fail. Insurer should increase the settlement offered The property sustained resultant water damage after an escape of liquid event on or around 13 June 2022. The restoration report from N dated 18 June 2022 observed the causation of the damage was the burst flexi pipe in the main bathroom, affecting the flooring in several rooms. The complainant provided a video showing hot water flooding the tiled floor areas of the property with grout popping out in a particular area. He also provided photographs of the floor tiles prior to the escape of liquid event. It is unclear when these photographs were taken. However, they reasonably show the floor tiles were undamaged at the time the photos were taken and prior to the claimed event. N observed that there were drummy tiles in all rooms especially in the perimeter of the rooms where there was grout installed. There was no silicone seal to wall and cabinetry junctions, allowing water to ingress underneath the tiles that have been a direct stick to the concrete slab. N listed the insurable repairs to include floor tiles and replacement of affected timbers and linings. The insurer says that without establishing the floor tiles’ pre-existing condition was intact, it is not logical to contend the drummy condition is a result of the water event. However, N’s initial observations recorded the tiles in the various rooms of the property were drummy including the damage to the skirting from the water ingress. While the insurer says the proximate cause of the failure and condition of the floor tiles is not connected to the burst flexi hose, rather relates to the installation method, including, but not limited to: no provision installed for the expansion and contraction of the floor tiles the incorrect application of tile adhesive, it has not shown if the floor tiles installation did not meet any specific building code, tiling standards or the tile manufacturer’s installation guidelines at the time. The insurer accepts the standards referred by NB do not apply as the property was built prior to the time when the standards became applicable (2007). The insurer however states criteria for policy exclusion ‘defects in structure, design, work done’ should then be tested against ‘tradesman-like manner’ consistent with the industry standards prevailing at the time of construction. It has not provided any written evidence to show the floor tiles installation did not meet the industry standards at the time. While the insurer had referred to several exclusions, it has not explained how they apply to the subject claim with supporting information. Further, NB accepts the escape of liquid event would have worsened and exasperated a pre-existing issue. N also says the damage would still have occurred but potentially not to the extent that is now present. I accept the failure of the floor tiles at the property may gradually occur over time but there is no information to say it was in such a condition that required immediate replacement at the insured property. It has long been established that the proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause. In this instance, the dominant and effective cause of the insured property damage, is the escape of liquid. NB observed the following installation issues. However, I am satisfied the dominant cause of the condition of the tiles is the escape of liquid event: the applied adhesive was not fully compressed to the back of the floor the grout is delaminating from the tile joint and crumbles to the touch is usually contributed to incorrect mixing or over-diluting with water when mixed. This is because, the exchanged information shows it took approximately two weeks to complete make safe works and dry the water damaged property after claim lodgement. NB inspected the property approximately three months after the date of the loss. While NB refers to water damage, he has not made any comments on how the inundation of the floor tiles from the hot water may have impacted the grout and/or adhesive. It is plausible the hot water inundation to the tiles for approximately three hours damaging the tiles’ grouting/adhesive, caused them to lift, pop and become drummy. While the floor waste in the bathroom has a negative fall impacting the ability for liquid to be contained in the bathroom and drain through that floor, NB acknowledges that the volume of water from the flexi hose may not have been able to drain through the floor. Given, the above, I am satisfied that on the balance of probabilities, that the floor tiles damage at the property was due to the escape of liquid event. There is no persuasive evidence showing an exclusion(s) applies. The insurer is therefore required to accept the claim pursuant to the policy terms and as per NB’s recommendation: Due to high number of delaminated tiles identified there is no other option but to remove and replace all tiles to the property with provision made to introduce expansion and contraction control joints, with tiles installed to meet the AS 3958.1—2007 and AS 3958.2, including manufacturer’s recommendations. Insurer should pay interest on the settlement If the insurer cash settles the complainant for the repairs to the damaged flooring, it should pay interest on the settlement pursuant to section 57 of the Insurance Contracts Act 1984 from the date if first denied liability for the flooring until the date of the payment. Similarly, it should also pay interest on the cash settlement released in September 2024 from the date it denied liability for the damaged flooring until the date of the payment. This is because this part of the settlement would not have been delayed until September 2024, if not for the insurer’s partial claim denial. Is the insurer required to pay compensation? Yes. The damaged flooring remains unrepaired to date. While the insurer provided timely updates on the progress of the claim, its decision to incorrectly deny liability for the flooring, for over two years, inconvenienced the complainant and his family. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: physical inconvenience time taken to resolve the situation interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Insurer is required to pay non-financial loss compensation The complainant expressed his dissatisfaction with the insurer’s claim decision and outcome of its complaint review on several occasions. The damaged flooring at the property remains unrepaired to date. The complainant says he has kept the flooring taped over the last two years preventing a foot injury that may occur if he removes the taping. The insurer says it accepted the resultant damage and settlement for the costs associated with reinstatement of that resultant damage with $3,289 paid for make safe and mitigation costs and $5,918.07 paid to the complainant in September 2024. While the insurer provided timely updates and information on the claim progress, its incorrect decision and refusal to accept liability for the full claim in a timely manner inconvenienced the complainant over two years. Given the above, it is fair in all the circumstances the insurer should pay $2,000 non-financial loss compensation. Why is the outcome fair? It is fair the insurer accepts liability for the claim covered under the policy terms. It is also fair the insurer pays compensation for its claim handling. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Expert reports | Record | Key points | Insurer’s builder N Report 27-6-2022 | Are there any noted building/design faults contributing to the damage? - Yes, the floor tile to wall junctions have not been adequately sealed as per AS3958.1 where it is a requirement to seal junctions with a flexible or waterproof sealant. If the building/design fault were not present, would the resultant damages have occurred – We believe damages would still have occurred however potentially not to the extent that is now present. Are there any noted maintenance issues existing or related to the event? - No Is Damage consistent with insureds response: Yes. A burst hot water Flexi pipe in the vanity unit of the Bathroom has burst and water has flowed throughout the entire house, particularly in all tiled areas. It was noted at the time of our inspection, that there were dummy tiles in all rooms, especially around the walls where it was noted there was grout installed, but no silicone seal to wall and cabinetry junctions, allowing water to ingress underneath the tiles that have been a direct stick to the concrete slab. There were no Silicone seals to the internal junctions of the Bathroom and Ensuite. Skirting was cracking away from the walls in areas due to the water but only slightly. Waterproofing breaks were noted at the Bathroom, Toilet and laundry doorways. There were no step-downs from the bathroom or Ensuite entries. Tiles have been cut into the kickers of cabinetry and not underneath. Our discussion with the insured has confirmed that no drummy tiles existed prior to the event and all floor tiles were sound. The drummy tiles identified during our inspection were randomly scattered throughout the house, with a large percentage of the drummy tiles to the perimeters of the affected rooms. Restoration was underway and near completion to carpets in the affected rooms. The Flexi pipe has been replaced. Insured will need to re-locate due to the nature of the works while they are conducted and furnishings removed and stored. Detail summary of insurable repairs: Floor tiles, and all resultant works, to be replaced along with affected timbers and linings. | Insurer’s building consultant NB Report 29-10-2022 | The insured advised that the escaping liquid was running for approximately 2-3 hours, affecting the whole ground floor of the property. The restoration team attended site to carry out the drying of the property with dryers and dehumidifiers going for approximately 2 weeks. The insured noticed that there were lifting tiles directly outside the main house bathroom. No drummy or lifting tiles were noticed or observed by the insured prior to the event. The tiled floor has endured an escape of liquid event from the main house bathroom. In an event of this type and duration, it is expected that a correctly installed ceramic floor tile survives an event of this nature. The bathroom has negative fall from the floor waste - if the bathroom floor was laid to the NCC recommendations a large portion of the escape of liquid will have channelled to the floor waste. There is no provision installed for the expansion and contraction of the floor tiles, with no perimeter expansion and contraction allowance or any expansion/control joint installed to the tiles at a 6 m interval - this would have been expected to be seen at the living/kitchen transition where the total length is 10.4 m. The cause of the failed floor tiling in the bathroom, foyer, living / dining area, laundry, toilet and various corridors is incorrect installation – the tiles are not fixed on a full adhesive bed. The tile adhesive is incorrectly applied with an 8 mm notched trowel and where no expansion joints were installed not meeting the below Australian Standards (AS): AS 3958.2: Ceramic Tiles – Guide to the Selection of a Ceramic Tiling System and the manufacturer’s installation instructions for the materials selected & AS 3958.1—2007- Ceramic tiles Part 1: Guide to the installation of ceramic tiles In addition, the preparation of the concrete slab to receive the ceramic floor tiles will be undulating over and above the recommendation of the +/- tolerances of the to install, these areas need to be filled or grinded to within tolerance so when the adhesive is applied to lay the tiles the tiles are firmly placed and compressed into the adhesive to provide a strong bond between the substrates. There are areas where the tiles are not delaminated - these areas bridge the pockets where the delaminated tiles are detected. This is another indication that the substrates have not been adequately levelled to receive the floor tiles. The event will have worsened and exasperated a pre-existing issue. Due to high number of delaminated tiles identified there is no other option but to remove and replace all tiles to the property with provision made to introduce expansion and contraction control joints, with tiles installed to meet the AS 3958.1—2007 and AS 3958.2, including manufacturer’s recommendations. | Complainant’s builder A Email 25-7-2024 | There is no inspection for tiling. Any currently still isn't. We have a final certificate from the Certifier to say the home is fit for occupation and complies with code for a lot of the items like waterproofing, glazing, energy etc, nothing for tiling. The code referred to in the building report refers to AS3958.1 - 2007: Guide to installation of ceramic tiles. As these tiles were installed prior to that date, using this code as reference is irrelevant. Most adhesives had a 5- or 7-year warranty. They would need to use a code prior to the AS3958.1 - 2007 to assess the tiles.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.