Home / Allianz Australia / Determination 12-24-134775
Determination 12-24-134775
Insurer ceased repairs and offered an inadequate cash settlement after partially declining the claim; delays
Summary
After the insurer began repairs on an escape of liquid claim, it stopped and offered a cash settlement, excluding a pre-existing beam issue. AFCA found this unfair, required a building consultant process to set an actionable cash settlement with a 15% uplift, and awarded $5,000 for non-financial loss.
An insurer that starts repairs should generally finish them, and a cash settlement must be fair and based on an actionable quote, with compensation for the unreasonable delays and cessation of repairs.
Issues
- Claim amount dispute primary · upheld
“The insurer's offer was not based on an actionable quote; must follow process to determine fair cash settlement plus 15% uplift.”
- Claim denial secondary · not upheld
“Insurer is not required to cover rectification of issues unrelated to the claim (the hy-joist I-beam issue).”
- Poor claim handling secondary · upheld
“It was not fair to the complainants to cease repairs and offer a cash settlement.”
- Delay secondary · upheld
“The delays and the decision to cease repairs and cash settle the claim were not reasonable.”
- Repairs or contractors secondary · not upheld
“The information does not show the insurer's repairs to date are defective.”
Subjects and remedies
home or building damagepay claimpay non financial lossreassess claim
Text of the determination
Determination
|
Case number
|
12-24-134775
|
Financial firm
|
Allianz Australia General Insurance Limited
Case number: 12-24-134775 9 December 2025
1 Determination overview
1.1 Complaint
In May 2022, the complainants made a claim with the financial firm (insurer) under their home insurance policy (policy) when they noticed water dripping from the ceiling in their kitchen. The insurer accepted the escape of liquid claim and agreed to undertake the repairs. After it had commenced repairs, the insurer discovered an issue with the LVL beams. It agreed to replace these beams to rectify this issue to ensure it could complete the repairs, despite saying this was a pre-existing issue.
After the insurer’s repairer completed this, it discovered the hy-joist I beam was deflecting. It said this was a pre-existing defect and not covered by the policy. In August 2024, the insurer made a cash settlement offer of $24,045.68 for the remaining repairs. It said the insurer’s repairer would not warrant the repairs due to the deflection issue. It has since increased this offer to $33,667.92, based on its builder’s quotes.
The complainants seek:
· the cost of repairs, based on their own quote, totalling $74,114.0 (plus GST)
· costs required to rectify issues with the insurer’s repairer’s repairs
· compensation for non-financial loss for stress and inconvenience over the three-year period.
1.2 Issues and key findings
Are the insurer’s repairs defective?
No. The information available does not show the insurer’s repairs to date are defective. However, the scope of works and quote the insurer obtains must include any work required to complete the current repairs to an acceptable standard.
Is the insurer entitled to cash settle the remaining repairs?
No. It was not fair to the complainants to cease repairs and offer a cash settlement. However, the complainants have now lost faith in the insurer’s repairers and the insurer is not required to cover rectification of issues unrelated to the claim (ie the hy-joist I-beam issue). It is accordingly appropriate for the insurer to provide a fair cash settlement to resolve the complaint.
Is the insurer’s cash settlement offer fair?
No. The insurer’s offer was not based on an actionable quote. The insurer must commence a process as set out in section 2.3 to determine a fair cash settlement figure, pay 15% uplift for the transfer of risk.
Is the complainant entitled to compensation for non-financial loss?
Yes. The delays and the decision to cease repairs and cash settle the claim were not reasonable. They impacted significantly on the complainants. The insurer must therefore pay $5,000 in compensation for non-financial loss.
Why is the outcome fair?
The outcome is fair because it ensures a fair process to resolve this dispute and compensates the complainant for the insurer’s errors.
1.3 Determination
This determination is substantially in favour of the complainants. The insurer should not have ceased repairs and made a cash settlement offer.
Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer must:
· provide the complainant with a choice between two suitably qualified building consultants, then follow the process set out in section 2.3 and pay the complainants a cash settlement together with a 15% uplift
· pay the complainants $5,000 in compensation for non-financial loss.
2 Reasons for determination
2.1 Are the insurer’s repairs defective?
No. The information does not show the insurer’s repairs to date are defective. However, the scope of works and quote must include any work required to complete the repairs to an acceptable standard (except for the beam issue).
Insurers are responsible for repairers’ work
Insurers are responsible for the quality of their repairers’ work and materials. This is consistent with section 86 of the General Insurance Code of Practice, which provides:
If we have selected and directly authorised a repairer to repair your damaged property, then we will accept responsibility for the quality of their work and the materials they use. Complaints about the repairer’s conduct, timeliness, quality of work or the materials they use will be handled under our Complaints process.
An insurer is accordingly generally required to compensate an insured if the insured can establish, on the balance of probabilities, the work was defective.
The complainants say the repair works completed by the insurer’s repairers to date are unsatisfactory. They say:
· after the LVL beams were installed, the joists were not properly fixed in line with AS1684
· several galvanised LVL connection brackets are missing screws and some are only secured by a single screw
· floor joists need to be realigned due to inadequate structural framing (from rectification work by the insurer’s repairer)
· both the complainant’s builders have advised further repairs are required to rectify repairs completed to date.
The complainants have provides photos of the beams they believe were installed incorrectly, along with descriptions for each image.
The images appear to show misalignment between the beams, the ceiling and other structural elements. However, I am not satisfied they show the repairs were carried out incorrectly.
Further, the insurer’s engineer says:
· floor joists to the level 1 bathroom have been fixed to the newly installed beam with joist hangers.
· site observations confirm the hangers have been installed with 8 screws to the supported beam and 8 screws to the supporting beam
· structural analysis of the floor joists confirms a reaction of 3.25 KN for ultimate loading – this confirms sufficient adequacy to support joists
· confirms the joist hanger and installation is adequate.
This shows the repair works are adequate.
I am accordingly not satisfied the information available shows the insurer’s repairs are defective. However, as set out below at section 2.3, the insurer must engage a building consultant to assess the property and obtain a new scope of works. This must include consideration of any rectification required.
2.2 Was the insurer entitled to cash settle the remaining repairs?
No. It was not fair to the complainants to cease repairs and offer a cash settlement. However, the complainants have now lost faith in the insurer’s repairers and the insurer is not required to cover rectification of issues unrelated to the claim. It is accordingly appropriate for the insurer to provide a fair cash settlement to resolve the complaint.
Insurer must exercise its discretion fairly
The Product Disclosure Statement (PDS) provides:
Buildings claims
If we agree to cover your claim for loss of or damage to your buildings, we will pay the reasonable cost of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new.
At our discretion (acting reasonably), we may:
• enter into a contract with a builder to repair or rebuild your home, or
• pay you the reasonable cost of repairing or rebuilding your home in cash or cash equivalent.
The General Insurance Code of Practice requires insurers to act fairly to their customers. When an insurer offers to cash-settle a claim rather than appointing a repairer, AFCA will consider whether the proposed settlement is fair.
AFCA generally considers that if an insurer starts repairs, it should finish them. It is unsatisfactory to abandon repair work and leave the insured responsible for finishing it. However, an insurer may be left with no other option if it cannot complete the repairs.
Insurer offered cash settlement and partially declined the claim after it had commenced repairs
In May 2022, the complainants lodged their claim. There were delays from the outset while the insurer determined the cause of the leak (ie whether it was from the diverter or the shower wall). The insurer ultimately appointed a repairer to commence the repair works. There were further delays and the repairer did not commence repairs until 31 October 2023. The insurer then sought an engineer’s opinion about issues the repairer had identified. The engineer advised the insurer the LVL beams required replacement. The insurer agreed to do this even though it was not covered by the policy as a pre-existing issue. In August 2024 (over two years since the complainant made the claim), the insurer sent a partial decline letter, noting the hy-joist I beam was deflecting, which was a pre-existing issue not covered by the policy. It offered a cash settlement for the remaining repairs and said its repairer could not warrant the repairs. The insurer’s repairer says:
· the hy-joist I-beam spanning 5300mm, located parallel to the replaced LVL beams, was found to be deflecting at its centre and sitting 18mm lower than the newly installed LVLs
· this is not considered a structural defect but prevents a warrantable ceiling repair, as it would result in a bow exceeding the maximum frame alignment deviation of 4mm, as set out in CSR’s Residential Installation Guide for Class 1 & 10 Buildings.
· the ceiling could not be levelled down to the lowest existing height as this would encroach upon the overhead kitchen cupboards
· replacement of the Hy-joists is required to meet installation standards
· if Hy-joists are replaced it is highly likely repairs would be warranted.
The repairer’s position is supported by the insurer’s engineer.
Insurer did not exercise its discretion fairly
The insurer says it is entitled to cash settle under the terms of the policy. The policy wording gives the insurer a discretion to either cash settle or repair. It does not however allow an insurer to elect to repair, commence repairs and then change their election when it becomes difficult. This is not to say it will always be unfair for an insurer to cease repairs mid-way through and offer a cash settlement. If the insurer could show that it had no other option available but to offer a cash settlement, this could be a fair outcome. I acknowledge the house requires rectification of existing issues to ensure the repairs are acceptable.
However, I am satisfied that it was unfair for the insurer to cease repairs and offer a cash settlement in these circumstances because:
· the complainants were living in the (partially repaired) house with their three children
· the information does not show the repairs are impossible or that another repairer would not warrant the work (after rectification of the issues)
· there is no suggestion the insurer asked another repairer if they would be prepared to undertake the work (after rectification of the issues)
· the insurer has advised it would not recommence repairs even if the complainants completed the required work first
· the offer was made more than two years after the complainants made the claim leaving them in a very difficult position.
The insurer was accordingly not entitled to offer a cash settlement as it did so.
However, the complainants say they have lost faith in the insurer’s repairers. It is accordingly fair for the insurer to pay a fair cash settlement to the complainants. This should not include repair work required to address the beam issue, which is unrelated to the claim.
2.3 Is the insurer’s cash settlement offer fair?
No. The insurer’s offer was not based on an actionable quote. The insurer must commence a process as set out in section 2.3 to determine a fair cash settlement figure, pay 15% uplift for the transfer of risk.
Insurer has not shown its quote is actionable
The insurer has provided a scope of work from its builder for the remaining works totalling $33,667.92.
The complainants have provided two quotes from two different builders:
· one for $74,114.70 (RX quote)
· one for $78,376.00 which includes the replacement of LVL beams (MZ quote).
The insurer says the complainant’s quotes are excessive. It says in respect of the RX quote:
· preliminaries of $3,140 is unnecessary because insurance should only be $700 and site establishment is not required
· WH&S obligations are not detailed and are business costs which should not be included. WC not necessary.
· material costs would only be approximately $6,000 leaving $37,447 in labour costs for an already demolished bathroom (ie 9 weeks for a job that should take 4 weeks)
· in respect of ‘provisional sum and PC items’, the only item that should be included is tiles, which should be included in material costs. Other items may be reused
· ceiling and wall lining at $6,145 is excessive
· ceiling painting is excessive
It says in respect of the MZ quote:
· it includes works required to rectify the floor joist
· some items may be reused
· removal of upper kitchen cupboard is not required to re-sheet ceiling.
Given this is a cash settlement, it is important the settlement amount reflects what the complainants will be required to pay. There is a significant difference between the scope and cost of repairs proposed by each party. I accept it is possible the complainant may be able to have the claim work done for less than the quotes provided. However, the insurer has not shown its quote is actionable.
It is accordingly fair for the insurer to set up a process to determine a fair amount based on an actionable quote:
· the insurer must provide the names of two suitably qualified building consultants to the complainants
· the complainants must choose one
· the insurer must then appoint this building expert to inspect the property and prepare a detailed scope of works and actionable quote for the claim repairs (including any required rectification of the previous repairers’ work) – if the building consultant cannot provide an actionable quote, then the insurer must find a builder who can
· the scope of works must clearly separate the claim repairs (covered) and the work related to the hyjoist-I-beams (not covered)
· the insurer must pay the complainant the claim repair costs based on that quote together with a 15% uplift to account for the transfer of risk and contingencies.
2.4 Is the complainant entitled to compensation for non-financial loss?
Yes. The delays and the decision to cease repairs and cash settle the claim were not reasonable. They impacted significantly on the complainants. The insurer must therefore pay $5,000 in compensation for non-financial loss.
AFCA may award compensation for non-financial loss in limited circumstances
Under its Rules, AFCA may award compensation (capped at $6,300) where a complainant suffers an unusual degree of physical inconvenience or time take to resolve a complaint because of the insurer’s claim handling.
Insurer must pay complainants $5,000
The complainants say there have been significant delays, which have impacted on them and their family. They also say the house was left untidy, the bathroom was not sealed off, and the door was not on the bathroom. They have been living in a partially repaired home for a significant period of time. They say this has been practically challenging because all family members have had to use the ensuite bathroom. They also say they have been embarrassed by the state of their home and constantly reminded of the issues by the incomplete bathroom and hole in the kitchen ceiling.
The insurer says it met relevant timeframes for claims decision, specifically the claims decision was made within General Insurance Code of Practice timeframes and:
· loose building items were stored neatly and the property was left in tidy manner, free from trip hazards
· no subfloor was installed because repairs were paused. Repairer can install a temporary cover
· door was intact
· the insurer has made a cash settlement offer.
I have set out a summary of the claim above at section 2.1. I am satisfied that the delays caused by the insurer and the insurer’s decision to cease repairs and offer a partial cash settlement caused significant stress and inconvenience to the complainants. They have provided a detailed account of the impact on their day-to-day life and their relationships. However, the claim threw up some unexpected curve balls the insurer did not expect. The delay was not solely caused by the insurer’s action or inaction. Despite this, I am satisfied the insurer could have handled it in a fairer and more timely manner.
The insurer must accordingly pay the complainants $5,000 in compensation for non-financial loss.
2.5 Why is the outcome fair?
The outcome is fair because it ensures a fair process to resolve this dispute and compensates the complainant for the insurer’s errors.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Relevant Policy Provisions