Determination 12-24-134299
Insurer's position on liability for cracking and foundation damage allegedly caused by burst water mains and plumbing leaks, with trees said to be an excluded cause
Summary
The complainant claimed for wall cracking and foundation movement she attributed to burst water mains and plumbing leaks; the insurer said trees contributed and required a separate plumbing claim. AFCA found the burst mains and leaks were the proximate cause, required the insurer to settle the claim with two excesses and shared plumbing repair costs, and ordered reimbursement of the arborist costs.
Applying proximate cause, the burst water mains and plumbing leaks dominantly caused the damage, with the trees having minimal effect absent the leaks, so the insured events are covered.
Issues
- Claim denial primary · upheld
“movement and cracking damage was dominantly caused by the burst water main or the plumbing leaks. Therefore, the insurer is liable for that damage.”
- Inadequate claim investigation secondary · not upheld
“AFCA did not accept the trees were the proximate cause of any of the damage, contrary to the insurer's engineer's view.”
- Product terms interpretation secondary · upheld
“Two events likely caused the damage, so the complainant should pay two excesses and cover some plumbing repairs.”
Subjects and remedies
home or building damagepay claimpay compensationrepair or rectify
Text of the determination
Determination
|
Case number
|
12-24-134299
|
Financial firm
|
RAA Insurance Limited
Case number: 12-24-134299 25 July 2025
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer). On 19 April 2024, the complainant lodged a claim for cracking to the walls she noticed in late 2023. She says damage is a result of the street water main bursting in 2017 and 2019.
The insurer’s claim assessment identified various plumbing defects and significant floor level deviation in the foundation of the property. As a result, the insurer says a second claim must be lodged for the plumbing defects that are unrelated to the burst water mains.
The insurer also says that once all the plumbing defects are rectified, the damage can only be properly assessed and determined once the soil has dried out and stabilised. This will take about 12 months. The insurer has not made a decision about what it will accept under either claim. However, it does say part of the cause of damage is trees. This is excluded under the policy.
The complainant disagrees with the insurer’s decision and says all the claimed damage is a result of the burst water main events and should be accepted.
1.2 Issues and key findings
Is the insurer liable for the claimed damage?
The exchanged information shows the movement and cracking damage was dominantly caused by the burst water main or the plumbing leaks. Therefore, the insurer is liable for that damage.
The information shows there are likely two events causing the claimed damage. This includes the burst water main and the plumbing leaks. As a result, the complainant should be liable to pay two excesses.
As some of the plumbing leaks were caused by the burst water main events, then both parties are liable for the cost to repair these leaks.
1.3 Determination
This determination is mostly in favour of the complainant.
The insurer is required to settle the claim pursuant to section 2.1 of this determination.
The insurer should reimburse the expert costs incurred by the complainant as set out in section 2.2.
2 Reasons for determination
2.1 Is the insurer liable for the claimed damage?
It is not in dispute there is differential ground movement at the property
The insured property is a double storey brick house. The home was built around 2010 and is constructed on a concrete slab.
It is not in dispute there is significant foundation damage to the complainant’s home (buckle in the floorplate) and subsequent cracking to the internal and external walls. The floor level survey found a 117mm difference in levels between the northwest and southeast of the home.
In addition to the foundation related damage, the claim assessment process also identified multiple plumbing issues to the stormwater and sewerage drain systems.
Parties disagree on the cause of damage
The complainant says the foundation damage and subsequent cracking is a result of two burst water mains north of the home in 2017 and 2019. During these events, the complainant says water flowed onto the eastern and southern sides of the property, entering the backyard area (western area of the property) and through the stormwater system. For clarity, the water did not enter the internal areas of the home.
She says damage became apparent after she arranged for the re-painting of the home in late 2023. Following this, previously minor cracks started to expand, and the floor level is shifting.
The complainant considers the plumbing issues (detailed above) are a result of the burst water main.
In support, the complainant relies on images taken during the flooding events and an arborist report issued by CTS.
The insurer does not dispute there were two burst water main events as described by the complainant. However, the insurer says the remaining plumbing defects are a result of differential ground movement caused by a combination of reactive soil, the nearby group of trees located at the southern side of the home and the plumbing leaks.
The insurer considers the complainant should lodge a separate claim for the resultant damage relating to the plumbing leaks identified along the northern area of the home. The insurer says the policy does not cover plumbing repairs to those areas as damage was not caused by an insured event. The insurer also says once plumbing leaks have been repaired and the soil sufficiently dried and stabilised, it can assess the resultant damage and provide an updated scope of works.
In support, the insurer relies on reports issued by its appointed loss adjuster (YDR), plumber (BCP), engineer (GPF).
On balance, the property is built on reactive soil
Both parties agree the property’s soil is reactive to moisture changes.
The engineering report issued by GPF on 29 May 2024 provides a further insight into these changes:
On increased moisture content above equilibrium conditions (wetting), reactive soils increase in volume (heave) and conversely reduce in volume (shrink) when the moisture content reduces below the equilibrium conditions.
Under the circumstances, consideration of the proximate cause is required
There is no dispute the policy covers loss or damage caused by leaking pipes, whether it be from a burst water main or from the stormwater or sewer system. For all the claimed damage to be covered, I must accept the proximate cause is one or all of these insured events.
Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence
Courts have said that if a first factor would have caused loss in any case, but a second factor would not have caused loss in the absence of the first factor, the first factor is the proximate cause of the loss.
Proximate cause is the plumbing leaks and burst water main
GPF’s opinion seems to accept both events caused all the claimed damage. For instance, GPF accepts the burst water main likely affected the sewer pipes to the western side of the home (but not to the north) and the pavers. GPF also accepts the pipe leaks caused damage to the concrete paving to the northern side of the home.
For the other damage claimed, GPF noted that:
… water leaks to the northern and western sides of the home have caused localised heave of the extremely reactive clay soils around the leak locations. In tandem with this, we believe that the trees to the south of the home has caused drying and shrinkage of the soils which has led to a settlement of the southeast quadrant of the home. The differential movement has caused a buckling of the floorplate and is the proximate cause of the damage to the home
The complainant disputes the trees are a proximate cause and has provided CTS’s report in support. However, even if I was to accept GPF’s opinion as stated above, I am not satisfied this means the trees is the proximate cause of any of the damage given the following:
· despite the trees being around for a long period, the substantive movement only seemed to occur after the leaks manifested – this indicates the trees had minimal effect on the property without the leaks
· it appears likely the trees are causing greater settlement due to the increased moisture caused by the leaks rather than pre-existing factors
· it follows that if the leaks had not occurred, the damage would likely not have manifested – in contrast, if the trees were not influencing the property, some damage would have still occurred by the localised heave caused by the leaks
· this supports the finding the proximate cause of all the movement and cracking damage is the burst water mains and the leaks, not the trees.
Insurer to apply two excess and complainant must pay for some plumbing repairs
Other issues in dispute are whether:
· the complainant is required to lodge two claims, and
· if the insurer is also liable to repair all the plumbing defects.
In this regard, I note the following.
GBP accepts sewer pipes to the western side of the home was likely affected by the burst water main. Therefore, these should be covered by the insurer.
GBP disagrees the other plumbing leaks were caused by the burst water main. There is no clear information to show the burst water main affected these areas of the home. It is also unusual that all of this damage would have only manifested several years after the events. For instance, if all these plumbing defects were caused by the burst water main, it is unclear why it took several years for movement and cracking damage to manifest.
In the absence of any clear evidence linking the burst water main to these areas, I am not satisfied there is sufficient basis to conclude they were all caused by the burst water main. It follows the complainant is liable to pay a second excess for these plumbing leaks and is responsible to rectify those leaks GBP said was not caused by the burst water main events.
How the claim should be settled
Scope of works for the claimed damage has not been provided by either party.
GPF says plumbing issues need to be rectified first. Then, there must be a 12-month drying out period before an accurate scope of works can be issued for the movement and cracking damage.
In absence of material suggesting otherwise, I accept this is what needs to happen. In particular, it is clear no works can commence until the plumbing leaks identified in BCP’s report are all rectified so the moisture levels in the soil can be stabilised.
Therefore, to settle the claim in a fair way the parties are required to carry out the following:
· within 14 days of the complainant accepting this determination, the complainant and the insurer must begin to work together to repair the plumbing defects
> in this regard, the insurer must contribute to the cost to repair the sewer pipes to the western side of the home
> the complainant is liable for the cost to repair all of the other plumbing defects identified in BCP’s report
· 12 months after the completion of the plumbing repairs, or at least when the soil has sufficiently stabilised, the insurer is required to assess all the resultant damage and organise the required repairs.
If a cash settlement is preferred for the home repairs, whether this is because the parties agree to this or they cannot work together, then the insurer’s cash settlement should at least be based on the following:
· a scope of works should be provided by an independent expert who has not been involved in the claim before – such an expert can be a structural engineer or a building consultant
· an actionable quotation based on that scope of works with a 10% contingency – the contingency is to factor the transfer of risk, particularly regarding the possibility of further works and costs incurred once repairs proceed
· include any other benefits the complainant is entitled to under the policy (e.g. temporary accommodation).
If the parties are unable to agree on the quantum or the extent of repairs, the complainant can lodge a new complaint at AFCA for a decision on this point.
2.2 Is the complainant entitled to further compensation?
Complainants entitled to reimbursement for professional costs
Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless special circumstances apply.
The complainant appointed an arborist CTS to inspect her home on GPF’s recommendation. Appointing CTS was reasonable in the circumstances given the influence of the trees was a legitimate point of contention between the parties.
The complainant provided copies of tax invoices related to this. The insurer should reimburse these costs within 14 days of receiving notice the complainant accepts this determination.
2.3 Why is the outcome fair?
The exchanged information shows the movement and cracking damage was dominantly caused by the burst water main or the plumbing leaks. Therefore, it is fair for the insurer to be liable for this damage.
The information shows there are likely two events causing the claimed damage. This includes the burst water main and the plumbing leaks. As a result, it is fair the complainant pays two excesses.
As the plumbing leaks were partly caused by the burst water main, it is fair both parties are liable for the cost to repair these leaks as set out in section 2.1.
As the complainant incurred professional costs in support of her successful claim, it is fair the insurer reimburses these.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.